ML20091R285

From kanterella
Jump to navigation Jump to search
Forwards Annual Plant Mod Rept,1983, Per 10CFR50.59 Requirements
ML20091R285
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 06/08/1984
From: Alden W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20091R289 List:
References
NUDOCS 8406150073
Download: ML20091R285 (1)


Text

-

7 o

PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101 121518484000 June 8, 1984 Docket No. 50-277 50-278 Dr. Thomas E. Murley Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406

SUBJECT:

Annual Plant Modification Report - 1983 Peach Bottom Atomic Power Station Unit Nos. 2& 3

Dear Dr. Murley:

Enclosed are two copies of the 1983 Annual Plant Modification Report for Peach Bottom Atomic Power Station Unit Nos. 2 and 3.

This report is being submitted in fulfillment of the reporting requirements of 10 CFR 50.59 describing changes made to the facility as the facility is described in the Final Safety Analysis Report.

Very truly yours, W. M. Alden-Engineer-In-Charge i Licensing Section.

Nuclear _ Generation Division MBR:vdw Attachments f *;j ) .

cc: Document Control' desk'7 ./

U.S. Nuclear" Regulatory dc :. mission Washington,-D.C. '20555 q 8406150073 840608 v ~'

PDR ADOCK 05000277

.R PDR , -lW

_