prf Northem States Power Company 414 Nicollet Mall Minneapolis, %nnesota 554011927 Telephone (612) 330-5500 August 29, 1995 10 CFR Part 26 Section 26.71 (d)
U.
S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.
20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket No.
50-282 License No. DPR-40 50-306 DPR-60 Fitness For Duty Performance Data for the 6-month period Endina June 30, 1995 In accordance with 10 CFR Part 26, Section 26.71 (d), please find enclosed Northern States Power (NSP) Company's Fitness For Duty (FFD) Program Performance Data for the six (6) month period ending June 30, 1995.
)
If you have any questions concerning the Performance Data reported, please call George Miserendino at 612-330-5630.
h (ey Roger O.
Anderson Director, Licensing & Management Issues c
Regional Administrator-III, NRC Monticello NRR Project Manager, NRC Monticello Resident Inspector, NRC Prairie Island NRR Project Manager, NRC Prairie Island Resident Inspector, NRC State of Minnesota, Attn: Kris Sanda J.
Silberg Attachments:
A (1-3)
Fitness For Duty Program Performance Data (Personnel Subject to 10CFR26)
B Confirmed Positive Tests for Specific Substances.
C Fitness For Duty Summary Report, including:
Management Actions and Reportable Fitness For Duty Events under 10CFR 26.73 l
pl
, m _. _, -.... - -
i 9509060166 950829 PDR ADOCK 05000282
_R,,_
, __ _ __ PDR_.._
TRANSMITTAL MANIFEST NORTHERN STATES POWER COMPANY NUCLEAR LICENSING DEPARTMENT MONTICELLO NUCLEAR GENERATING PLANT PRAIRIE ISLAND NUCLEAR GENERATING PLANT Fitness for Duty Performance Data for the 6-Month Period Endino June 30.1995 Manifest Date:
August 29,1995 Correspondence Date: August 29,1995 Monticello Internal Site Distribution Special Instructions Kaleen Hilsenhoff.....USAR File..........Yes No_x,
Stsve Ludders..... NRC Commitment.....Yes N o_x_
Lila Imholte.......... Monti OC Sec........Yes No_x_ - 11, No dist to OC members below if YES Mal Opstad..........Monti SAC Sec..
....Yes_x_ No
-5
- Mail Room...
.Monti Posting....
...Yes No_x_ - 7 Monticello Internal Site Distribution:
- Monti Document Control File J C Grubb, NGSS, OC l
W J Hill, Plant MGR, SAC, OC L L Nolan, GSSA, OC C A Schibonski, GSE, OC B D Day, MGR MTC, OC l
M F Hammer, GSM, OC W A Shamla, NQD J E Windschill, GSRS, OC Monti Site Lic File M W Onnen, GSO, OC NRC Resident inspector's Office Lonnie Wilkerson Mel Opstad NSP Internal Distribution l
E L Watzl, VP Nuc Gen R O Anderscn, Dir LMI, SAC Mike Wadley, PI T E Amundson, Dir NQD, SAC Pi Site Licensing Communications Dept Yes No_x_
A A Hunstad, Pl D. Axt, PI I
George Miserendino, RS-6 Craig Johnson, RS-6 Mark Dapas, SR Res insp NRC, PI External NSP Distribution l
' Doc Control Desk, NRC Kris Sanda, State of Minn Regional Admin-lll,NRC J E Silberg Beth Wetzel, NRR-PM, NRC
]
I
(
- Advance Distribution made by Site Licensing l
l I
Attachment A-1 Fitness for Duty Program Performance Data Personnel Subject to 10CFR26 Northern Statea Power June 30.1995 Company Six (6) Months Ending General Office j
Loc.im Craia S. Johnson (612) 330-7999 Contact Name Phone (Include Area Code)
Cutoffs: Screen / Confirmation (ng/ml) & Alcohol (%BAC)
X Appendix A to 10CFR26 Levels ***
- See Attachment C, page 2, item 4 Long -Term Short -Term -
Testing Results Licensee Employees -
Contractor personnel Contractor Personnel
' Average numberwith Unescorted Access 248 N/A 14 i
- ~
Categories Tested Positive Tested Positive Tested -
Positive Pre-badging 4
0 0
0 For Cause 0
0 0
0 Post Accident 0
0 0
0 Random 64 0
3 0
Follow-up
,1 0
0 0
Total 69 0
3 0
,s.m-
- n
<.,w, a
1,
.,,an an m
a a
a
.n
,m-Attachment A-2 Fitness for Duty Program Paicrmance Data Personnel Subject to 10CFR26 i
Northern States Power June 30.1995 2
Company Sk (6) Months Ending 3
4' Monticello Plant
~
wm Craia S. Johnson (612) 330-7999 Contact Name Phone (include Area Code) 4 j
Cutoffs: Screen / Confirmation (ng/ml) & Alcohol (%BAC)
X Appendix A to 10CFR26 Levels *"
- "See attachment C, page 2, item 4 e
Long -Term '
' Short -Term -
, Testing Results Licensee Employees Contractor personnel Contractor Personnel Average number with 4
Unescorted Access 375 N/A 106
~ #
Categonc.
Tested Positive -
Testrd Positive Teste'd -
Positive Pre-badging 42 0
31 0
For Cause 0
0 0
0 Post Accident 0
0 0
0 i
Random 99 2
26 0
Follow-up 19 0
0 0
4 l
Total 160 2
57 0
i-J
~
~
Attachment A-3 Fitness for Duty Program Performance Data Personnel Subject to 10CFR26 Northern States Power June 30.1995 Company SW (6) Months Ending Prairie Island w w on Craia S. Johnson (612) 330_-7999 Contact Name Phone (Include Area Code)
Cutoffs: Screen / Confirmation (ng/ml) & Alcohol (%BAC) 2 ppendix A to 10CFR26 Levels ***
A
- See Attachment C, Pago 2, item 4 Long -Term -
. - Short -Term Testing Results -
Licensee Employees :
Contractor personnel Contractor Personnel Average number with Unescorted Access 567 N/A 239
-#~
- ~
Categories Tested Positive'
. Testect
~ Positive Tested -
Positive Pre-badging 207 1
204 0
For Cause 0
0 0
0 Post Accident 0
0 0
0 Random 169 0
29 1
Follow-up 2
0 5
1 Total 378 1
238 2
Attachment B Fitness for Duty Program Performance Data Personnel Subject to 10CFR26 Northern States Power June 30 1995 Company Six (6) Months Endm0 General Office. Monticello. Prairie Island Location Craia S. Johnson (612) 330-7999 Contact Name Phone (include Area Code)
Cutoffs: Screen / Confirmation (ng/ml) & Alcohol (%BAC)
X Appendix A to 10CFR26 Levels"*
- "See Attachment C, Page 2, item 4 Breakdown of Confirmed Positive Tests For Specific Substances (By Testing Pool))
Amphe-Phency-Refusal 4
General Office Marijuana Cocaine Opiates tamines.
'clidine Alcohol to Test j
Licensee Employees 0
0 0
0 0
0 0
Short -Term Contractors 0
0 0
0 0
0 0
Total 0
0 0
0 0
0 0
0l Monticello Plant Licensee Employees 0
0 0
0 0
2 0
Short -Term Contractors 0
0 0
0 0
0 0
Total 0
0 0
0
,0 0
0 2l Prairie Island Plant Licensee Employees 1
0 0
0 0
0 1
Short-Term Contractors 2
0 0
0 0
0 0
Total 0
0 0
0 0
0 0
4l 4
4
ATTACHMENT C August 23,1995 Page 1 of 2 Fitness For Duty Summery Report Six (6) Month Period Ending June 30,1995 Manaaement Actions
- 1. During the six (6) month period ending June 30,1995 Northem States Power Company conducted (905) drug and alcohol tests in accordance with 10 CFR Part 26.
NSP workers subject to random drug and alcohol testing are each assigned to one of three pools: Prairie Island, Monticello, and General Office. Random test rates for es h pool are as follows.
Semi Annual Period POOLS Ending 06/30/95 General Office 52%
Monticello 52%
l' Prairie Island 50 %
ALL 51 %
i For the reporting period ending June 30,1995, five (5) workers tested positive for drugs or alcohol and were immediately denied unescorted access to NSP Nuclear Plants.
Of this group, two licensee workers having both tested positive for alcohol on random tests were retumed to duty after NSP obtained management and medical assurance of fitness for duty, and the workers met NSP access authorization requirements. Two (2) Prospective licensee workers were denied access authorization for a minimum of one (1) year, one subsequent to a " refusal to test" on a pre-access drug test, the other after testing positive for marijuana on a pre-access drug test. One contract (1) worker was denied access for a minimum of three (3) years after having tested positive twice for marijuana on random and follow-up tests.
- 2. For the semi-nnnual period referenced herein all blind specimens submitted to NSP's HHS-cer*?
oratory yielded expected results.
- 3. NSP has,
ud program performance data for the six (6) month period ending June 30,1996 and has revised existing FFD procedures to incorporate enhancements as indicated by the analysis.
i i
_j
ATTACHMENT C August 23,1995 Page 2 of 2 Fitness For Duty Summery Report Six (6) Month Period Ending June 30,1995 Mpnaaement Actions (continued) 4.
NSP continues to test for marijuana metabolites using an initial cuttoff level of (50 ng/m')). This change was initiated on September 1,1994 and communicated to the NRC by letter dated September 22,1994.
NSP performed (905) drug tests under the !ower initial cut-off level for Marijuana.
Of three (3) Marijuana positives during this reporting period, two (2) positives were less than 100ng/ml but greater than 50ng/ml. The remaining positive result tested at greater than 100ng/ml.
Reportable Events NSP had one reportable fitness For duty related evert as defined in 10 CFR Part 26.73 (a) during this reporting period. The event occurred on 5-16-95 and involved a licensed nuclear plant operator who tested positive for alcohol on a random test. The event was reported to the NRC on 05-16-95, t
+