Peaver Va ley cower Station
$mppingport. PA 15077-0004
+
(412) 393-5255 JOHN D SIElsER Vee President - Nuclear Group Jzintiary 21, 1992 U.
S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, DC 20555 Subiect:
Beaver Valley Pover Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Inspection Report 50-334/91-23
,In response to NRC correspondence dated December 24, 1991 and in accordance with 10 CFR 2.201, the attached reply addresses the Notice of Violation transmitted with the referenced inspection report.
If there are any questioan concerning this response, please contact Mr. K.
L. Ostrowski at
)
393-5104.
Sincerely,
,/
D.
Sieber Attachment cc:
Mr.
J.
Beall, Sr, Resident Inspector Mr.
T. T. Martin. NRC Region I Administrator Mr.
E.
C. Wenzinger, Chief, Projects Branch No. 4 Division of Reactor Projects, Region I Mr. A. W.
DeAgazio, Project Manager Mr. M. L. Bowling (VEPOO) a
//g
.s..
/
J s
~
ik{
[:
j 9202040454 920121
\\
l PDR ADOCK 05000334 O
)k
t
.(
DUQUESNE LIGHT COMPANY Nuclear Group Beaver Valley Power Station, Unit No. 1 8eolv to Hotice of Violation Combined Inspection Report 50-334/91-23 and 50-412/91-22 Letter dated December 24, 1991 VIOLATION (Severity Level IV; Supplement I)
Descrint)3n of Violatio.D (50-334/91-23-01)
Technical Specification 6.8.1.a, requires that <iritten procedures be established, implemented, and maintained, covering activities listed in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978.
Contrary to the
- above, on November 6,
1991, operators failed to follow the procedures contained in the operating Manual as evidenced by the following two examples.
(1) Operating Manual 1.24.4.P,
" Steam Generator 1A (1B) (1C)
Level Low",
Issue 2,
Revision 35, required that action be taken to restore low steam generator level to normal.
Operators failed to restore Steam Generator 1A Level to normal, following receipt of the-low level alarm.
Operators initiated steam genettcor
- blowdown, further reducing steam generator level, which resulted in automatic start of the auxiliary feed pump on low-lo'.- level.
(2) Operating Manual-1/2.48.5.VI,
" Conduct of Operation", Issue 3, Revision 4,
required major equipment status changes be 2 egged in the reactor operator log and the nuclear shift operating foreman log.
The initiation of steam generator blowdown was not documented in'either of tha above logs.
Reason for the Viob tion t
This violation occurred because control room operators did not maintain complete awareness of plant conditions in that they initiated blowdown
- flow, thus reducing steam generator level, at a steam pressure where the ability to replenish stese generator level using the condensate pumps was limited.
Failure to log initiation of blowdown flow, occurred because the crew believed it was a routine evolution.
Corrective Action Taken At - the-time of the
- event, operations personnel stabilized steam l
. generator levels and secured the auxiliary feedwater pump.
Operations shift crews
.w r n.
briefed on the event during shift meetings.
l C
-. ~... -
e Reply to Notice of' Violation
,Page 2 4
Action IgKen to Prevent Recitrience 3
The-circumstances surrounding this violation will be reviewed with emphasis on procclure ccepliance and log keeping in Module 3 of l
Unit 1 and 2 License Retraining.
A Huma Performance Enhancement System evaluation has been initiated on the event associated with this violation.
Additional corrective i
actions may be initiated based on the evaluation.
This evaluation will be complete by April 3, 1992.
The procedure step to start the ma'1 feedwater pump will be evaluhled to determine if the pump should be started earlier in the heatup.
This evaluation will be completed by April 3, 1992.
A precaution will be added to the start-up procedure to provide additional.information concerning the shutoff head of the condensate pumps.
This action will be completed by April 3,
- 1992, 1
l An Operating Manual Deficiency Report has been written on Operating Manual 1.24.4.P.
" Steam Gadorator 1A(1B) (1C) Level Low".
The alarm response will be evaluated to determine if additional steps are necessary to address restoration of feedwater and isolation of blowdown.
Date of Full Compliance The utation is in full compliance at this time.
t.
Module of Unit 1 and 2 License Retraining will be completed by June 26, 1996.
The Human Performance Enhancement System Evaluation will be completed by April 3, 1992.
All _ procedure changes addressing this violation will be evaluated by i:
-April 3,
1992.