Corrects 911230 Response to NRC Bulletin 88-011, Prz Surge Line Thermal Stratification. Jco for Unit 2 Not Dependant on Approval of leak-before-break Analysis
ML20091P843
Person / Time
Site: Farley  
Issue date: 01/31/1992
From: Woodard J
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
IEB-88-011, IEB-88-11, NUDOCS 9202040049
Download: ML20091P843 (1)


Text

nN nbno Company C M stMR" a

J. D. Woodard N[

ev I'N January 31, 1992 Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D.C.

20555 Joseph M. Farley Nuclear Plant - Units 1 and 2 NRC Bulletin No. 88-11 Pressurizer Surae line Thermal Stratification Gentlemen:

By letter dated December 30, 1991, Southern Nuciear Operating Company (SNC) provided a clarification to the Nuclear Regulatory Commission (NRC) regarding SNC's efforts relating to NRC Bulletin 80-11, " Pressurizer Surge Line Thermal Stratification."

In this letter several statements were made by SNC under the name ' Alabama Power Company." As of December 23, 1991, SNC became the licensed operator of Farley Nuclear Plant.

Below is the full text of the December 30, 1991, letter which has been corrected to reflect SNC as the responsible organization for operational obligations with regard to the generic letter actions.

By letters dated January 31, 1991, Alabama Power Company submitted the results of the stress and fatigue analysis required by the subject bulletin for both units and a justification for continued operation (JCO) for Unit 2.

Nuclear v Regulatory Commission (NRC) letter dated August 21, 1991, acknowledged receipt of that response and indicated %at both units had satisfied the requirements of Bulletin 88-11. This letter a.; indicated that the JC0 submitted for Unit 2 is acceptable until such time as the leak-before-break (LBB) analysis review is completed by the NRC. This implies that the JC0 acceptance is linked to the review of the LBB analysis.

SNC wishes to clarify that the JC0 on Unit 2 is not dependent on the approval of the LBB analysis. As stated in the JC0 and restated in the NRC letter, a procedural change has been implemented to limit the system delta T to less than 3100F which will maintain the pipe stres es within the code allowable. This conclusion is not based upon the LBB analysis.

Although it is SNC's intent to remove the pipe whip restraints whenever the LBB analysis is approved, the JC0 would remain valid without the removal of the whip restraints.

The NRC letter requested that they be informed when all modifications to Unit 2 have been accomplished. Notification will be made when SNC has completed the modifications to the restraints. The design is currently developed to the point that NRC approval is needed on the LBB analysis prior to proceeding.

If there are any questions, please advise.

Respectfully submitted, i

O'30C 92o204o04, 920131 PDR ADOOK 05000348 N

4 D <r w

,(

G PDR 7

[)h[

JDW/JGS:cht-91.0250

'J.

Woodard

/

I O

cc: Mr. S. D. Ebneter

'J Mr. S. T. Hoffman Mr. G. F. Maxwell

_