Omaha Public Power District 444 South 16th Street Mall Omaha, Nebrana 68102 2247 402/63G 2000 January 28, 1992 LIC-92-009R U. S. Nuc1 car kegulatory Commission ATIN: Document Control Desk Mail Station PI-137 Washington, DC 20555
References:
1.
Docket No. 50 285 21(,1991 (LIC-91-?78L)(Document Control Desk)
W. G. Gates) to NRC 2.
Letter from OPPD dated November Gentlemen:
SUBJECT:
New Abnormal Operating Procedure (ity (ERF) Computer is Off-lineAOP) to When The Emergency Response facil In Licensee Event Report 91-023 (Reference 2), Omaha Public Power District (OPPD) committed to develop an AOP by March 1, 1992 that would provide onerators with specific guidance and corrective actions to be taken when the ERI computer is off-line.
The AOP being developed is A0P-34, " Loss of the ERf Computer."
0 PPD is currently updating the format cf the fort Calhoun Station (FCS) A0Ps, with a scheduled completion date of June 30, 1992.
In order to initially implement the new A0P-34 in the updated format, OPPD requests that the Reference 2 ccmmitment date be changed to June 30, 1992. Mr. R. P. Mullikin of NRC Region IV agreed with this extension in a telephone call on January 15, 1992 with Mr.
G. M. Cook of OPPD.
If you should have any questions, please contact me.
l l
Sincerely, b.45,fff,,
W. G. Gates lilvision Manager Nuclear Operations WGG/sel c:
LeBoeuf, Lamb, Leiby & MacRae R. D. Martin, NRC Regional Administrator, Region IV D. L. Wi inton, NRC Senior Project Manager
[
R P. Mu ikin, NRC Senior Resident Inspector
/