ML20091P768

From kanterella
Jump to navigation Jump to search
Discusses Util Making Commitment to Develop Project to Verify Accuracy of Info Contained in Updated Safety Analysis Rept & to Inform NRC of Project Content & Schedule.Forwards an Overview of Scope & Milestones of Project
ML20091P768
Person / Time
Site: Fort Calhoun 
Issue date: 01/31/1992
From: Gates W
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LIC-92-014R, LIC-92-14R, NUDOCS 9202040013
Download: ML20091P768 (2)


Text

'

7lQ.f.W.,ff Q Q.fi f.ffff_:;;j,fy Q,gh Q Q..-

,n.

M**

Omaha Public Power District 444 South 16th Street M3!!

Omaha, Nebraska 68102-2247 402/636-2000 January 31, 1992 LIC-92-014R U. S. Nuclear Regulatory Commission ATTN: Do':ument Control Desk Mail Station PI-137 Washington, DC 20555

References:

1.

Docket No.30-285 2.

Letter from NRC (A. B. Beach) to OPPD (W. G. Gates) dated September 9, 1991 3.

Letter from OPPD (W. G. Gates) to NRC (Document Control Desk) dated October 11, 1991 (LIC-91-250R)

Gentlemen:

SUBJECT:

Verification of Information Contained in the Updated Safety Analysis Report In Referev.e 3, Omaha Public Power District (OPPD) committed to oevelop a project to verify the accuracy of information contained in the Updated Safety Analysis Report (USAR) and inform the NRC nf the project content and schedule.

Attached is an overview of the scope and major milestones of the project.

If you should have any questions, please contact me.

Sincerely,

/A.3.

69 W. G. Gates Division Manager Nuclear Operations NGG/sel Attachment c:

LeBoeuf, Lamb, Leiby & MacRae R. D. Martin, NRC Regionai Administrator, Region IV D. L. Wigginton, NRC Senior Project Manager R. P. Mullikin, NRC Senior Resident Inspector 03016i l

9202040013 920131 picyment utn Eva! Opportun4 45 5124 PDR ADOCK 05000285 We/Ferna:e PDR p

r-ATTACHMENT LIC-92-014R SCOPE OF PROJECT The USAR verification project will verify the accuracy of information contained in the USAR utiiizing information gathered during the Design Basis Reconstitution Project.

The project will also verify that a proper revio ' inclusion of information required by 10 CFR 50.71(e) has been completed. Portions of the USAR e.g.

foundation appentlices which contain archived informationetc.) will not be reviewed (as such as the part of this stedies pile load test program, project.

Thf s project will not reformat the USAR to conform with Regulatory l

Cuide 1.70; however, critcria will be developed to ensure an appropriate level of detail throughout the USAR, and to ensuru consistency in the inclusion of infarmation resulting from changes to the Fo-t Calhoun Station.

TASXS/SCHEDUL2 OF PP0 JECT The project consists of three major tasks:

l Task )

Ccmpilation and organization of informatio) to be reviewed during the project.

Completion is scheduled for January 1993.

Task 2 Development / revision of review and update process procedures.

Completion is scheduled for January 1993.

1 Task 3 Technical review and verification of USAR information to include systen walkdowns if necessary.

Completion is scheduled to i

coincide with the.,ul, 1995 USAR update.