s Beaver Valley Power Station Shi pin o PA 15077-0004 (412) 643-8069 FAX GEORGE S. THOMAS Diviseon Vice President o r Dmsson August 24, 1995 4

U. S. Nuclear Regulatory Commission

- Attention: Document Control Desk Washington, DC 20555-0001

Subject:

Beaver Valley Power Station, Unit No.1 and No. 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Fitness-For-Duty Program Six Month Report In accordance with 10 CFR 26.71(d), attached is the Fitness-For-Duty Program Six Month Report for the period of January 1,1995 through June 30,1995.

If there are any questions concerning this report, please contact Mr. E. P. Edwards at (412) 393-5288.

Sincer ly,

_._W 43/

George S. Thomas I

Attachment c:

Mr. L. W. Rossbach, Sr. Resident Inspector Mr. T. T. Martin, NRC Region I Administrator Mr. D. S. Brinkman, Sr. Project Manager 010G5c) 9509010134 950824 PDR ADOCK 05000334 pi t.._.__

,_. PDR

~

DUQUESNE LIGHT COMPANY Nuclear Power Division Beaver Valley Power Station FITNESS-FOR-DUTY REPORT PERFORMANCE DATA MRO SIX MONTH REPORT From January 1,1995 through June 30, 1995, our records indicate no confirmed positives in any of the program categories for the licensee or long-term contractor pools.

There were three confirmed positives recorded in the short-term contractor pool. All three individuals were denied unescorted access and returned to the contractor / vendor for further disposition.

l Follow-up to Previous MRO Reports As previously reported, in the Performance Report of June 30,1994 through December 31, 1994, one licensee employee experienced a confirmed positive in the for-cause/ observed behavior program.

The employee was denied unescorted access, evaluated by the EAP provider, and completed an intensive out-patient rehabilitation program on December 30,1994. On January 3,1995, the employee was returned to work and placed in the follow-up program. On June 1,1995, the employee elected retirement. Unescorted access was never reinstated.

]

Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 DUQUESNE LIGilT COMPANY June 30, 1995 Company a Months Erene BEAVER VALLEY POWER STATION Locanon Fitness-for-Duty Program Manager Eugene P. Edwards, Manager, Employee Relations (412)393-5288 conuel Name Phone (indude atoa code)

Cutoff s: Screen / Confirmation (ng/ml)

@ Appendix A to 10CFR 26 Marijuana

/

Amphetamines

/

/

l Cocaine

/

Phencyclidine

/

/

Opiates

/

Alcohol (% BAC)

/

Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with f

Unescorted Access 1,272 181 565 C1tegories Tested Positive Tested Positive Tested Poartive Pre-Access 69 0

23 0

470 1

[

Post accident 3

o 9

Observed behavior 3

0 Random 340 0

83 0

169 2

Follow-up 4

0 0

0 24 0

Other Total 416 0

106 0

666 3

REV.1/92

---