Part 21 Rept Re Static Load Rating on Anker-Holth/McDowell Wellman Engineering Hydraulic Suppressor Assembly.Caused by Failure of Torrington self-aligning Ball Bushing.Recommends Replacment W/Paul Monroe Hydraulics Part PA-89467
ML20091N851
Person / Time
Site: Point Beach, Robinson, 05000000
Issue date: 06/05/1984
From: Newhart M
AFFILIATION NOT ASSIGNED, BAXTER FLUIDPOWER GROUP
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
REF-PT21-84 NUDOCS 8406120480
Download: ML20091N851 (2)


Text

____

t' Dm8 ed BAXTER FLUIDPOWER GROUP June 5, 1984 United States Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 (312) 790-5500 Attention:

Mr. James G. Keppler

Subject:

Notification of Problen/ Defect H. B. Robinson Steam Electric Plant (NRC Report per 10CFR Part 21)

Dear Mr. Koppler:

Baxter Fluid Power (Anker-Ilolth) was informed by telephone on May 25, 1984 by a Mr. Rick Dayton of Carolina Power and Light (H. B. Robinson Plant), of a potential problem / defect concerning static load rating on Anker-Holth/McDowell Wellman Engineering Part Nunber 21.12620.008 serial number 001.

Part Number 21.12620.008-001 is one (1) of twelve (12) supplied to EBASCO Services for the H. B. Robinson plant in 1969.

The above part is a hydraulic suppressor (snubber) assembly with a tension and compression load rating of 470,000 pounds (470 Kip).

According of information received from Carolina Power and Light, during a static load test one of the self aligning ball bushings (Torrington part number 30SBB48) failed below the 470 Kip rating at 412,000 pound (412 Kip).

At time of hydraulic suppressor (snubber) manufacture in 1969, the static radial load rating of the Torrington bearing (30SDB48) was 899,000 pounds (899 Kips) and one (1) of the twelve (12) suppressors was tested to, and met the 470,000 pound (470 alp) beading specifications.

Subsequent to manufacture, the Torrington bearing (30SDB48) rating has been revised downward to 300,000 pound (300 Kip) static radial load rating.

The safety hazard created by a failure of the self aligning ball bushing is the potential non-functioning of the appropriate suppressor due to critical nin-alignment from failure.

An additional location with hydraulic suppressors (snubbers) using the Torrington 30SBB48 self aligning ball bushing is Wisconsin Electric Power Conpany, at the Point Beach nuclear plant. A quantity of twelve (12) suppressors of a 500,000 pound (500 Kip) rating are installed at. the above location with an original manufacture date of 1969. These suppressors were nanufactured with the Anher Holth,2723 Conrer St'ed Pryt Hu on. M>chgin. U S A 48C//) feehu o 013) 985 7181 TWA 810 23160'J3 r

EMG EMo Accumuistore Inc.,2723 Conne Skee Pvt Huron. Moyn U G A 4MO Wphone 013) 985 7181 TWX 8f0 2316093 VhY 10 viceroy Fluid Power,282 Beteu now Re= daw. Ontaro CanMa M9W IHS hphr>ne(418i) 075 7020 kon 06 98')201 l Ela 0406120400 040605 PDR ADOCK 05000261 i

U L

PDR

se-Page 2 United States Nuclear Regulatory Commission June 5, 1984 Anker-Ilolth/ttcDowell Wellman Engineering part number 21.12620.007.

Baxter Fluid Power, Anker-IIolth, formerly Anker-liolth/McDowell Uc11 man Engineering, has withdrawn from the design of new suppressor systems, and only supplies replacement parts for designs of previous manufacture.

As of May 31, 1984 Baxter Fluid Power, Anker-liolth completed the formal conveyance of all design rights, documents, and data to Paul-Munroe flydraulics, Inc.,1701 West Sequoia, Orange California 92668 (Contact tir. John !!cCabe) 714-978-9600.

Recommend corrective action is to replace the existing Torrington self-aligning ball bushing (30SBB48) of the now existing 300,000 pound static radial load rating, with a new self aligning ball bushing with a static radial load rating exceeding the load rating of the suppressor, using Paul-Munroe !!ydraulics part number PA-89467.

The noted part number PA-89467 is directly and dimensionally interchangeable with the existing bearings.

The length of time to complete the above noted recommended corrective action is estimated at up to one year (twelve months) allowing for sufficient time to procure the replacement parts, schedule the suppressor facility of outage, renovo the suppressors from their mountings, de-contaminate as required, re-place the bearings, and re-install.

We are currently reviewing our other previous designs and will issue a subsequent report as appropriate per 10 CPR part 21.

Sincerely, ANKER-i!OLT!!

BAXTER FLUID POWERGROUP 7

\\l'

/')

/

elftf t

.M L<

Max R. Newhart Vice-President Operations CC: Director of Inspection Carolina Power & Light

& Enforcenent (3 copics)

II. D. Robinson Plant P. O. Box 790 Paul Munroe liydraulics, Inc.

Ilartsville, SC 29550 1701 West Sequoia Attn fir. Rick Dayton Orange, California 92668 (803) 383-4524.

Ext. 354 Attn: fir. John !!cCabo (714) 978-9600 Wisconsin Electric Powor Company Point Deach flucicar Plant 6610 truc1 car Itoad FILE Two Rivern, Winconsin 54241 Attn: ftr. D. E. Duenkel (414) 755-2321