Text
_ _ _ _ _ _ _ _ _
h 3
CODSumBIS Power am-Executive Manager Midland Project office oeneral offices: 1945 West Fernell Road, Jackson, MI 49201 e (517) 788-0774
@lPAL STAFF
/
May 31* 1984 WA f& PRP f(/N'h p/RA
/RF 3E
(/
A
- R.1SP PC DEMA Mr J J Harrison, Chief PAO 3C5 Midland Project Section
[55A 4L U S Nuclear Regulatory Commission jp File M Region III 799 Roosevelt Road i
Glen Ellyn, IL 60137 MIDLAND ENERGY CENTER MIDLAND DOCKET NOS 50-329, 50-330 REMEDIAL SOILS WORK AUTHORIZATION FILE 0485.16 SERIAL CSC-7819 We request authorization for the following activities under the Work Author-ization Procedure:
155052115 Finger drift to, excavate, install and load Pier E7 165052115 Finger drift to, excavate, install and load Pier W7 155050325 Install dowels at East FIVP (drill holes only) 165050325 Install dowels at West FIVP (drill holes only) 165052105 Drift to, excavate, install and load Pier CTS 155052105 Drift to, excavate, install and load Pier CT8 152555020 Install and load temporary support bracket @ Col Kc7 162555020 Install and load temporary support bracket @ Kc5.89 and Kc6
&l0011-JAM /RHW/k1w CC DSHood, USNRC RJCook, Midland Resident Inspector JCKeppler, Regional Administrator 8406120253 840531 M7 I h PDR ADOCK 05000329 A
PDR i