ML20091N251
| ML20091N251 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 05/17/1984 |
| From: | Edelman M CLEVELAND ELECTRIC ILLUMINATING CO. |
| To: | Mcmillan J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20091N246 | List: |
| References | |
| GL-84-10, NUDOCS 8406120246 | |
| Download: ML20091N251 (2) | |
Text
_ _ _ _ _ _ _
P o Box 5000 CLEVEL AND ohio 44101 T E L E PHONE (? t 6) 622 9800 it L UW N A TIN S B P2 M P !Bu N SCU A PE MURRAY R. EDELMAN VIC E PRE SIDENT l
NUCLEAR Mu / 17, 1984 l
Mr. Jo seph I. McMillan i
l NRC R eg io n III operator Licensing Branch 799 Roosevelt Road Glen Ellyn, IL 60137
Dear Mr. McMillan:
Generic Letter 84-10, Administration of 01erating Tests P r io r to Initial Criticality, specified requirements for cold license training programs.
Perry proposes to meet these requirements by completing the cold license training program as specified in the Perry Final Sa f ety Analysis Re[ ort as further amplified in the followin ;:
1.
Nuclear fundamentals t ra in ing, including ten reactor start-ups at a nuclear reactor.
Ferronnel having previous NRC operator 1icenses or pt eviously qualified as " reactor operators" in the Navy Nuclear Power Program would be construed to have 1:erformed ten reactor start-ups without sI ec if ic documentation of specific manipulation accomplish-ment.
2.
Observation training on shift at a comparable operating reactor.
All SRO candidates will complete six weeks, PO ca nd ida t es tour weeks, on shift at an operating commercial BWR.
3.
Tra ining on a s imu la to r.
All license candidates would complete at l ea s t three months in simulator training programs, which includes classroom training directly related to the simulator evolutions or manipulations being performed.
4.
Training on actual system design.
Each candidate will compl ete ten weeks of Perry Specific systems training includiaq in-plant walkdowns.
Pending approval of this plan, the following operator examinations are requested:
8406120246 840607 PDR ADOCK 05000440 V
,N$
fg 1,h/f) y u q't
k Mr. McMillan May 17, 1984 Date
- RO/SRO*
Type of Examination December 1984 2/9 Plant Oral Exam March 1985 4/10 Pl.'nt Oral Exam / Written Re-Exam (6)
March 1985 12/12 Written / Simulator / Oral
- Specific numbers of licenses are approximate It is highly desired that Perry license candidates participate to the greatest extent possible in the Perry start-up test program to gain the experience and in-depth familiarity with Perry systems which the start-up test program provides. Documents such as Generic Letter 84-10 bmpede achievement of the goal by directly af fecting previously approved training and examination plans. Also, these additional experience require-ments have discouraged licensing of engineers and management personnel which is a condition that NRC has previously stated it was trying to avoid.
Your timely review, approval and comments to this plan are requested.
Sincerely, Murray R.
Edelman i
1 5
s I
i s '