ML20091M496
| ML20091M496 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 01/22/1992 |
| From: | Bailey J WOLF CREEK NUCLEAR OPERATING CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NO-92-0027, NO-92-27, NUDOCS 9201290109 | |
| Download: ML20091M496 (2) | |
Text
. _ _. _
l W4pLF CREEK
~
NUCLEAR OPERATING CORPORATION John A Dauey
$$ 7 January 22, 1992
)
NO 92-0027 U. S. Nuclear Regulatory Commission ATTHe-Document Control Desk Hail Station P1 137 Washington, D. C.
20555 References-1)-Letter dated December 23, 1991, from A. B. Beach,
}
NRC, to B. D. Withers, VCNOC
- 2) Letter NO 91 0328 dated November 22, 1991, from J. A. Baiely. WCNOC to NRC Subjects-Docket No. 50-482: Response to Request for Additional Information Concerning Violation 482/9127 01 00ntlement
':'he. purpose -of this letter is to provide additional information concerning violation 482/9127-01 as requested in Reference 1.
Violation 482/9127-01 involved five' examples of lack of control of the inservice inspection (ISI) plan and associated nondestructive examination procedures.
In Reference 2 Wolf Creek Nuclear Operating Corporation identified that a
~
lack of understanding of the document control system by the ISI engineers was'a contributing factor to this violation.
The attachment to this letter deecribes the actions-.that are planned to be taken to assure that the ISI
. engineers are cognizant of the procedural requirements for control oi ISI
-plan documents, i
If you have any questions concerning this matter, please contact me or Hr. S. G.-Wideman of my staff.
Very truly ycurs, C[trd.b/t^b John A.-Bailey Vice President Operations l
. JAB /aem L
cci A. T. liowell (NBC), w/a R. D. Martin (NRC), w/a
- 0. A. Pick (NRC), w/a W. D. Reckley (NRC), w/a j
i I
9201290109 9p
_ m - e _ - - ses, 1
e occx o,,o,jpp PDR
.. M rw twortunny rnwayw u r +cvrt
+
e AC,tachment to 110 92-0027 Response to Request l'or Additional Irformation Reauest Describe the actions that have been or are planned to be taken to ensure that inservice inspection (ISI) engineers are cognizant of the procedural requirements for control of ISI program plan documents.
Responeet Training will be provided by Wolf Creek liuclear Operating Corporation (WCliOC) Document Servicec personnel which wl.1.1 include a discussion of the process for using.
- storing, and retrieving documents within the VCl400 document control system.
This training will specifically cover the process for handling ISI Prcgram Plan and Procedures within the document control i
system including classification.
- storage, issuance and retrieval.
Additionally, a review of 181 proceddres will be performed and changes will be made as necessary to incorporate lessons learned from this training.
These actions will be completed by May 29, 1992.
Additional Informatiqat Changes to the-ISI Program Plan and Procedures are included in ISI personnel required reading to ensure that these personnel are kept cognizant of changes hich affect ISI activities.
4
=
-I.w W
i
-e%