ML20091L677
| ML20091L677 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 05/26/1984 |
| From: | Schnell D UNION ELECTRIC CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| ULNRC-832, NUDOCS 8406080164 | |
| Download: ML20091L677 (5) | |
Text
-
, -~
4 3.
- I
,e UNION ELECTRIC COM PANY 1901 GRATIOT STREET ST. Louts, MISSOURI' OON ALD P.' eCHNELL' O som ges voce ensaiosest ST. Loulf3. MISSOURt salee Mr. Harold R. Denton, Director Office of. Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington,-D.C. 20555
Dear Mr. Denton:
ULNRC-8 3 2 DOCKET NUMBER 50-483 CALLAWAY PLANT, UNIT 1 INCORPORATION OF SNUPPS DOCUMENT INTO APPLICATION
Reference:
ULNRC-733 dated March 23, 1984 The reference letter addressed Union Electric's readiness for operation of'the Callaway Plant and requested issuance of the operating license.
The reference letter also incorporated documents. submitted by SNUPPS Staff into the Callaway application.
Since that date~a number of additional documents have been submitted by SNUPPS Staff which should also be incorporated. lists the additional submittals which are hereby incorporated into the Callaway application.
very truly yours, 4
Donald F. Schnell DS/lw
-cc:
J. J. Holonich t
,f,I O
(
A
_.-._.,._..-----....,-___.w-
STATE OF MISSOURI )
)
Donald F.
Schnell, of lawful age, being first duly sworn upon oath says that he is Vice President-Nuclear and an officer of Union Electric Company; that he has read the foregoing document and knows the content thereof; that he has executed the same for and on behalf of said company with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief.
By Donald F.
Schnell A Vice President Nuclear 198M SUBSCRIBED and sworn to before me this dd M day of
/
DARGARA J. PFAF NOTARY PUBLIC, STATE OF MISSOURt MY COMf/ISSION EXPIRES APlill 22,1935 ST. LOUIS COUNT (
l J
l ATTACHMENT 1 to ULNRC-832 SNUPPS LETTER NUMBER SLNRC Date SUBJECT 83-10 2/23 Response to IE Bulletin 82-04 83-59 11/17 Response to IE Bulletin 83-06 84-49 3/23 Response to IE Bulletin 83-07 84-50 3/23 Reponse to NRC Questions on Setpoint Methodology for SNUPPS 84-51 3/26 PSI Relief Request - Callaway Plant 84-52 3/27 Justification for Interim Operation
- Seismic Qual.
84-55 3/28 Response to IE Bulletin 83-08 84-56 3/28 Control of Heavy Loads 84-58 4/03 Justification for Interim Operation
- Seismic Qual.
84-59 4/06 SNUPPS Technical Specifications 84-60 4/06 Chapter 15 Analyses Affected by Assumption of Zero ppm Downstream of RWST 84-61 4/09 PSI Relief Request - Callaway 84-62 4/09 Instrument Error for Containment Pressure Setpoints 84-63 4/11 E.Q. of Solenoid Valves 84-66 4/13 Final Res,'onse to NRC Generic Letter No. 83-10(
84-68 4/16 I&CS Branch Review i
'84-69 4/17 Revision in D/G Start Time 84-70.
4/17 Boron Precipitation in the BIT and
-Associated Piping n
84-71 4/23 Revision in D/G Start Time 84-72 4/23 SNUPPS Tc*)2 Spec Use of RHR Suc*. ion i
Relief Valves for Cold Overpressurizat' ion Protection m
J SNUPPS LETTER NUMBER SLNRC Date SUBJECT I
84-73 4/23 I&CS Branch Questions on the SNUPPS Tech Specs 84-74 4/24 NUREG-0737 II.B.3 Post Accident Sampling capability 84-76 4/26 SNUPPS Tech Spec - Use of RHR Suction Relief Valves for Cold Overpressurization Protection 84-77 5/02 Revision in Diesel Generator Start Time 84-80 5/14 SNUPPS Tech Spec Reactor Systems Branch Issues 84-81 5/15 SNUPPS FSAR Chapter 14 Changes Applicable for Callaway 84-82 5/16 SNUPPS Tech Specs Reactor Systems Branch Issues 84-83 5/16 Response to NRC Review of SNUPPS FSAR Chapter 14 for Callaway License 84-84 5/18 I&CS Branch Tech Spec Questions 84-85 5/23 Callawav Plant UHS Tech Spec Requirements 84-86 5/24 Pump & Valve Operability FSAR Revision 84-87 5/25 SNUPPS Tech Spec RSB Issues 1
c
=
l e
e cc:
Glenn L.
Koester Vice President Operations Kansas Gas & Electric P.O. Box 208 Wichita, Kansas 67201 Donald T. McPhee Vice President Kansas City Power and Light Company 1330 Baltimore Avenue Kansas City, Missouri 64141 Gerald Charnoff, Esq.
Shaw, Pittman, Potts & Trowbridge 1800 M. Street, N.W.
Washington, D.C.
20036 Nicholas A. Petrick Executive Director SNUPPS 5 Choke Cherry Road Rockville,. Maryland 20850 John H. Neisler Callaway nesident Office U.S. Nuclear Regulatory Commission RR91 Steedman, Missouri 65077 William Forney Division of Projects.and Resident Programs, Chief, Section lA U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Bruce Little Callaway Resident Office U.S. Nuclear Regulatory Commission RRil Steedman, Missouri 65077 i
l-L