r 2NRC-4-074 (412) 787 - 5141 (412)923 -1960 Telecopy (412) 787-2629 June 5, 1984 Nuclear Construction Division Robinson Plaza Building 2, Suite 210 Pittsuurgh, PA 15205 United States Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
Mr. Darrell G. Eisenhut, Director Division of Licensing office of Nuclear Reactor Regulation
SUBJECT:
Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 Response to Generic Letter 81-21
" Natural Circulation Cooldown" Gentlemen:
This letter is Beaver Valley Power Station Unit 2's (BVPS-2) res ponse to Generic Letter 81-21 as reques ted to be submitted four nonths prior to the staf f's scheduled' issuance of its operating license Safety Evaluation Report.
As stated in Generic Letter 81-21, the as ses sme nt to be submit t ed is to addres s the procedures, training program, ani analysis and/or tes t s to e nab le ope rato r to avoid, recognite, and prope rly react to reacto r vessel voiding during natural circulation cooldown.
The fo llowing items rela t e to the items identified in the Generic Letter respectively.
ITEM 1: Demonstration (i.e., analysis and/or test):
On January 26, 1983, BVPS-2 submitted it s FS AR and do cke t ed May 18, 1983.
Section SA, " Cold Shutdown capability," of the FSAR identi-fies the degree of compliance to Branch Technical Position (BTP) RSB 5-1, Rev. 2, in Table SA-1.
In Table SA-1, BVPS-2 refers to a plant s imilar in design to BVPS-2 where anal ys es and/or tes t s were c on-duc t ed. These tes ts included Natural Circulation Test Report s which clearly demons trated the ability to initiate a controlled natural circulation cooldown in a Westinghouse three-loop plant. The refo re,
because of the clos e similarity, BVPS-2 does not plan to repe at a Natural Circulation Test at BVPS-2.
ITEM 2: Verification of Supplies of Auxiliary Feedwater to Support Cooldown Method:
In Section 10.4.9 and Appendix 5A of the BVPS-2 FSAR, the capacities and capabilities of the safety grade auxiliary feedwater sys tem to support cold shutdown with natural ci r cula t io n cooling are identified.
fffho o
' O
Il
~
Unitsd Stcteo Nuclear Rigulatory Commission l.
Mr. D rrell G. Eisenhut, Director Page 2 I
ITEM 3:
Description of Training Program t c
BVPS-2 will addr es s Item 3 in res ponse to ope n items /que s t io ns ident ified in BVPS-2 Draf t Safety Analysis Report (SER) Sect ion 13 concerning BVPS-2's Training Program.
DUQUESNE LIGHT COMPANY l
\\
l By
~.
't.fJ. Wooleve r Vice President l
SDH/wjs cc:
Ms. M. Ley, Project. Manager l~
Mr. M. Licitra, Proj ect Manager Mr. G. Walton, NRC Resident Inspector NRC Document Control Desk l