ML20091L208

From kanterella
Jump to navigation Jump to search
Forwards Fitness for Duty Program Performance Data for Jan- June 1995
ML20091L208
Person / Time
Site: Callaway 
Issue date: 08/22/1995
From: Peevy J
UNION ELECTRIC CO.
To:
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ULNRC-3256, NUDOCS 9508290005
Download: ML20091L208 (5)


Text

r>

by b.

Cattaway Plant

' Post Office Box B20

?Fulton, Missouri 65251

,1 x

JUnion cEucrme

. UtxRC - 3256 -

R August 22,1995

Office Nuclear Reactor Regulation
U.S. Nuclear Regulatory Commission.

1 Attention: DocumentControlDesk

MailStop P1-137 iWashington,DC 20555l

) Gentlemeni

~ In accordance with the Fitness For Duty Rule,10CFR26.71(d), Recordkeeping.

Requirements, enclosed is Union Electric's Callaway Nuclear Plant Fitness For Duty Program
Performance Data for the six (6) month period beginning January 1,1995 and ending on June 30,1995.'

Enclosures include:

Attachment A - Fitness For Duty Program Performance Data Personnel Subject to 10CFR26 (2 pages)

' Attaclurient B - Fitness For Duty Management Action (1 page) in regards to:

Jnitiatives Taken

  • Lessons Learned
  • - Reportable Fitness For Duty Events Under 10CFR26.73 If you have any questions in regards to the Performance Data Reported, please contact me at (314)676-8246.

Sincerely, h

\\

M h tmes R.Peevy Manager, Emergency Preparedness-Organization Support Fitness For Duty Manger

' ijRP/h/djr;

Enclosures.

i N #l95082900051950822 ~

PDR.ADOCKi05000483-'

.R PDR u.

p1 t,

-4

l k co-r j

i

-: w/ attachments cc:

J. B.' Martin, Regionai Administrator US. Nuclear Regulatory Commission

' Region III 801 Warrenville Road Lisle,IL 60532-4351.

M. J. Farber Chief, Reactor ProjectsSection III A US. Nuclear Regulatory Commission

' Region III '

801 Warrenville Road Lisle,IL 60532-4351 Francis L Brush' Resident NRC Inspector, Callaway Plant

._Callaway Resident Office

= US. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077-1302 L.R. Wharton (2 copies)

Licensing Project Manager, Callaway Plant Office of Nuclear Reac*or Regulation US. Nuclear Regulatory Commission MailStop 13-E-21 Washington,DC 20555

}

Missouri Public Service Commission Manager, Electric Department P.O. Box 360 JeffersonCity,MO 65102 E-Thomas A.Baxter Shaw, Pittman, Potts, & Trowbridge 2300 N. Street, N.W.

Washington,DC 20037 l

4

~

Fitzess Fer Duty Program Performance Data Personel Subject to 10CFR26 (NUMARC Rev. Date 1/92)

Union Electric Januarv - June 1995 Company 6 Months Callaway Plant Location Patricia Davis. R. N.

(3141676-4300 Contact Name Phone (include Area Code)

Cutoffs: Screen / Confirmation (ng/ml)

O Appendix A to 10CFR26 Marijuana 20/

15 Amphetamines 1000/ 250 Barbiturates 300/ 150 Cocaine 300/

150 Phencyclidine 25/

25 Benzodiazepines 300/ 150 Opiates 300/

150 Alcohol

(.04% BAC)

Long-Term Short-Term Testing Results License Employees Contractor-Personnel Contractor-Personnel Average Number with Unescorted Access 924 148 251 Categories Tested Positive Tested Positive Tested Positive Pre-Access 15 0

0 0

749 18 Post Accident 0

0 0

0 0

0 Observed Behavior 0

0 0

0 0

0 Random 237 0

41 0

61 1

Follow-up 4

0 0

0 3

0 Other 0

0 0

0 0

0 TOTAL 256 0

41 0

813 19 ATTACHMENT A Page1of2

}

l Breakdown of Confirmed Positive Tests for Specific Substances t

1:

-2.

.3:

4-5-

W Cocahe W

Phencyddine Akshel Refusalb Test Barbeurabs Sen=amW

  • ^

Licensee

. [. 6,u

LormyTerm1 Contractors e

e

. Miam o

e o

e e

contractors

-TOTAL.

g g

g g

g

  • Left Side - Record of test results that would have been Positive at the NRC cutofflevel.

~

Right Side - Record of Confirmed Positives based on Union Electric's more stringent cutofflevel.

1 Employee was positive for two drugs 1 Random alcohol positive 3 Prebadge alcohol positive ATTACHMENT A Page 2 of 2 I

\\

e T

9 0

O 4

0 c:

8 o

E!.

ca 8E 1

5 2

z gW 4

W n

a n

m.

O-n g

3 m

l$

R m

8 R

4 oc g

4 c.

C k

L Q.

O P

M E

E B

/-

a n

V b

=

R 1

B m.

4 0

m b

b e

d'

=

I r.

+

4 N

4

f 4

4 r')

. i,

-4~.

'.4 q

' Initiatives Teken:

No significant Fitness For Duty Program changes occurredc 1

Reportabid:

1 No rep $rtable events occurred during the reporting period.

l i

i

.i

.i 4

i I

s L

I 4

ATTACliMENT. B -

. ~.

..