ML20091L208
| ML20091L208 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 08/22/1995 |
| From: | Peevy J UNION ELECTRIC CO. |
| To: | NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| ULNRC-3256, NUDOCS 9508290005 | |
| Download: ML20091L208 (5) | |
Text
r>
by b.
Cattaway Plant
' Post Office Box B20
?Fulton, Missouri 65251
,1 x
JUnion cEucrme
. UtxRC - 3256 -
R August 22,1995
- Office Nuclear Reactor Regulation
- U.S. Nuclear Regulatory Commission.
1 Attention: DocumentControlDesk
- MailStop P1-137 iWashington,DC 20555l
) Gentlemeni
~ In accordance with the Fitness For Duty Rule,10CFR26.71(d), Recordkeeping.
- Requirements, enclosed is Union Electric's Callaway Nuclear Plant Fitness For Duty Program
- Performance Data for the six (6) month period beginning January 1,1995 and ending on June 30,1995.'
Enclosures include:
Attachment A - Fitness For Duty Program Performance Data Personnel Subject to 10CFR26 (2 pages)
' Attaclurient B - Fitness For Duty Management Action (1 page) in regards to:
Jnitiatives Taken
- Lessons Learned
- - Reportable Fitness For Duty Events Under 10CFR26.73 If you have any questions in regards to the Performance Data Reported, please contact me at (314)676-8246.
Sincerely, h
\\
M h tmes R.Peevy Manager, Emergency Preparedness-Organization Support Fitness For Duty Manger
' ijRP/h/djr;
- Enclosures.
i N #l95082900051950822 ~
PDR.ADOCKi05000483-'
.R PDR u.
p1 t,
-4
l k co-r j
i
-: w/ attachments cc:
J. B.' Martin, Regionai Administrator US. Nuclear Regulatory Commission
' Region III 801 Warrenville Road Lisle,IL 60532-4351.
M. J. Farber Chief, Reactor ProjectsSection III A US. Nuclear Regulatory Commission
' Region III '
801 Warrenville Road Lisle,IL 60532-4351 Francis L Brush' Resident NRC Inspector, Callaway Plant
._Callaway Resident Office
= US. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077-1302 L.R. Wharton (2 copies)
Licensing Project Manager, Callaway Plant Office of Nuclear Reac*or Regulation US. Nuclear Regulatory Commission MailStop 13-E-21 Washington,DC 20555
}
Missouri Public Service Commission Manager, Electric Department P.O. Box 360 JeffersonCity,MO 65102 E-Thomas A.Baxter Shaw, Pittman, Potts, & Trowbridge 2300 N. Street, N.W.
Washington,DC 20037 l
4
~
Fitzess Fer Duty Program Performance Data Personel Subject to 10CFR26 (NUMARC Rev. Date 1/92)
Union Electric Januarv - June 1995 Company 6 Months Callaway Plant Location Patricia Davis. R. N.
(3141676-4300 Contact Name Phone (include Area Code)
Cutoffs: Screen / Confirmation (ng/ml)
O Appendix A to 10CFR26 Marijuana 20/
15 Amphetamines 1000/ 250 Barbiturates 300/ 150 Cocaine 300/
150 Phencyclidine 25/
25 Benzodiazepines 300/ 150 Opiates 300/
150 Alcohol
(.04% BAC)
Long-Term Short-Term Testing Results License Employees Contractor-Personnel Contractor-Personnel Average Number with Unescorted Access 924 148 251 Categories Tested Positive Tested Positive Tested Positive Pre-Access 15 0
0 0
749 18 Post Accident 0
0 0
0 0
0 Observed Behavior 0
0 0
0 0
0 Random 237 0
41 0
61 1
Follow-up 4
0 0
0 3
0 Other 0
0 0
0 0
0 TOTAL 256 0
41 0
813 19 ATTACHMENT A Page1of2
}
l Breakdown of Confirmed Positive Tests for Specific Substances t
1:
-2.
.3:
4-5-
W Cocahe W
Phencyddine Akshel Refusalb Test Barbeurabs Sen=amW
- ^
Licensee
. [. 6,u
- LormyTerm1 Contractors e
e
. Miam o
e o
e e
contractors
-TOTAL.
g g
g g
g
- Left Side - Record of test results that would have been Positive at the NRC cutofflevel.
~
Right Side - Record of Confirmed Positives based on Union Electric's more stringent cutofflevel.
1 Employee was positive for two drugs 1 Random alcohol positive 3 Prebadge alcohol positive ATTACHMENT A Page 2 of 2 I
\\
e T
9 0
O 4
0 c:
8 o
E!.
ca 8E 1
5 2
z gW 4
W n
a n
m.
O-n g
3 m
l$
R m
8 R
4 oc g
4 c.
C k
L Q.
O P
M E
E B
/-
a n
V b
=
R 1
B m.
4 0
m b
b e
d'
=
I r.
+
4 N
4
- f 4
4 r')
. i,
-4~.
'.4 q
' Initiatives Teken:
No significant Fitness For Duty Program changes occurredc 1
Reportabid:
1 No rep $rtable events occurred during the reporting period.
l i
i
.i
.i 4
i I
s L
I 4
ATTACliMENT. B -
. ~.
..