q,1 e
Georgia Institute of Technology i
NEELY NUCLEAR RESEARCH CENTER 900 ATLANTIC DRIVE ATLANTA, GEORGIA 30332-0425
[4o4)894-3600 USA i
August 16, 1995 U. S. Nuclear Regulatory Commission i
Document Control Desk Washington, DC 20555
Subject:
Facility License No.
R-97.
Docket No.
50-160 Application for Amendment of Technical Specifications
]
Gentlemen:
Application is hereby made to amend the Technical Specifications of the Operating License of the Georgia Tech Research Reactor (GTRR).
The change is needed because the administrative organization of the Georgia Institute of Technology is being restructured by the President of Georgia Tech.
The Georgia Institute of Technology requests an expedited review and approval.
The scope of the Technical Specifications change is limited to Section 6, Administrative Controls.
In the current version of the Technical Specifications, the Director of the Neely Nuclear Research Center (NNRC) reports to the Vice President for Interdisciplinary Programs.
The position of Vice President for Interdisciplinstry Programs is being eliminated.
After the planned reorganization, the Director of NNRC will report to the Dean of the College of Engineering, who reports directly to the President of the Institute.
The change in the Organizational Chart, page 39 (T.S. ), impacts one other page in the Technical Specifications:
page 38.
This page is also modified accordingly.
The change further impacts page 156 of the Safety Analysis Report (dated April 1994 and revised January 10, 1995).
This page is also modified accordingly.
Each impacted page is enclosed herein in two versions:
one showing editorial marks deletion redlined and struck through) and one clean copy as rev(ised.
In addition, we take this opportunity to correct errors reported in the facility Safety Analysis Report, dated April 1994 and revised January 10, 1995.
The errors occurred on pages 100 and 101. Again the deletions are redlined and struck through and the additions are 9508280282 950816 Nb e
gDR ADOCK 05000160 Y
l PDR Teles: 542507 GTRIOCAATL Fax:404-853-9325 (Venty 104494-3600)
- Unit of the University System of Georgia An Equat Education and Employment Opportunity Institution A
6 i
U; LS'.1 Nucle _ar: Regulatory Commission.
' I August 116,fl995
.i
- Page 2 -
l 1
fshown on the clean copy as revised.
No other documents such as the l
Emergency Preparedness Plan or the Security Plan lare impacted by.
l
,this-change.L,
)
, LBudget lines ' will be transferred from VPIP to the Dean ' of i
- Engineering., No staff or faculty will be terminated as a result of
- this.reorganisation.'
t
~ Financial qualifications of the Licensee to ' operate the reactor are
- not. af facted' by. the. change..
Also unaffected. is - the licensee's-standing commitment concerning funding of eventual. decommissioning.
- The reorganization change was reviewed 1by the Nuclear Safeguards
- Committee.-
- The Committee determined that the change does not
- decrease:the effectiveness or control of issues relevant to health
.and safety of:the public'or workers.
Revised pages/.of. the..' Technical Specifications sand the Safety l
l Analysis Report,Lincorporating the new administrative structure and
~
error, correction changes, are submitted' herewith for information.-
=The. changes proposed do'.not. endanger the health.and safety of the
.public and will not affect compliance with applicable' regulations.
j
- These modifications are respectfully ' submitted on behalf of the Georgia Institute of Technology, by l
M t.
CMC.
R. A. Karam Director, Neely Nuclear Research Center VICKIE L. CLARK NOTARY PUBLIC DOUGLAS COUNTY ur - EXPWES Enclosuresa syruman so,tw7 i.
Signed' original transmittal letter Technical Specifications:
-Page'38 showing deletion redlined and' struck through Page 38 showing clean copy as. revised
.Page139 showing-old organizational chart Page 39 showing,new organizational chart o
Safety Analysis Report dated April 1994, revised January 10 1995:
L Page 100 showing ~ deletions-redlined and struck through
.Page 100 showing-clean copy as' revised Page 101" showing deletions redlined and struck through
{
.Page 101 showing clean copy as' revised ~
S 4
., +,.. -
+.
...m
l l
i i
,Nuc ear.Regu atory-Comm ss on August 16,:1995 Page: 3-
~
Page 156 showing deletions redlined and-struck'through Page'156 showing clean copy as revised ce s.
Document Control Desk, NRC Mr. Stewart.Ebneter, NRC, Region II Mr. Marvin Mendonca,-NRC Dr.~ John White, College of Engineering, GIT Dr. Gary Poehlein, Interdisciplinary Programs, GIT i