F OPERATING DATA REPORT DOCKET NO. 50-397 UNIT WNP-2 DATE 5/l5/84 COMPLETED BY K. D. Cowan TELEPHONE (509) 377-2501 Ext. 2286 OPER ATING STATUS

1. REPORTING PERIOD:

April 1984 GROSS HOURS IN REPORTING PERIOD: 7I9

2. CURRENTLY AUTHORIZED POWER LEVEL (MWil: 3323 MAX. DEPEND. CAPACITY (MWe Net): 1100 DESIGN ELECTRICAL RATING (MWo. Net): 1100
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWo. Net): 20% Gross MW
4. REASONS FOR RESTRICTION (IF ANY): The Unit is in the Startup and Power Ascension Test Phase and must Complete Test Condition 1 requireh4iSMONTH YR TO DATE CuuutArtvE ments prior to increasing power level.
5. NUMSER OF HOURS REACTOR WAS CRITICAL ,........... .

414*27 428.2 428.2

6. REACTOR RESERVE SHUTDOWN HOURS . . . . . . . . . . . . . . . . . .

0 0 0

7. HOURS GEN ER ATOR ON LINE , . . . . . . . . . . . . . . . . . . . . . . . . .

0 0 0 0 0 0

5. UNIT RESERVE SHUTDOWN HOURS ......................
9. GROSS THERMAL ENERGY GENER ATED (MWM) ............. 51141.4 51141.4 51141.4
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) . . . . . . ......

0 0 0 0 0 0

11. NET ELECTRICAL ENERGY GENERATED (MWH) ..............

N/A N/A N/A

12. REACTOR SERVICE F ACTOR . . . . . . . . . . . . . . . . . . . . . . . . . . . ,

i 13. REACTOR AVAILABILITY F ACTOR . . . . . . . . . . . . . . . . . . . . . . . N/A N/A N/A I 14. UNIT SERVICE F ACTOR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . N/A N/A N/A

15. UNIT AV AILABILITY F ACTOR . . . . . . . . . . . . . . . . . . . . . . . . . . N/A N/A N/A
16. UNIT CAPACITY FACTOR (Using MOCl . . . . . . . . . . . . . . . . . . . . . N/A N/A N/A
17. UNIT CAPACITY FACTOR (Using Design MWel . . . . . . . . . . . . . . . . . N/A N/A N/A
13. UNIT FORCED OUTAGE RATE . . . . . . . . . . . . . . . . . . . . . . . . . . N/A N/A N/A
19. SHUTDOWNS SCHEDULED CVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACHl: 5/17/84, 6/21/84, 7/08/84; All for maintenance during Power Ascension Phase.
20. IF SHUT DOWN AT END OF REPORT PERICO. ESTIMATED DATE OF STARTUP: N/A i
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED I INITI AL CRITICALITY l/I6/84 I/I6/84 INITIAL ELECTRICITY 5/15/84 COMMERCI AL OPERATION 9/02/84 O$h00f m ql \

AVERAGE DAILY UNIT POWER LFVEL DOCKET NO. 50-397 UNIT WNP-2 DATE 5/15/84 COMPLETED BY K. D. Cowan TELEPIIONE (509) 377-2501 Ext. 2286 MONTH Aprii 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL tMWe-Net) (MWe Net) 1 0 0 37 2 0 1s 0 3 0 1s 0 4 0 20 0 5 0 0 21 a 0 0 n

7 0 0 23 s 0 0 24 s 0 25 0 to 0 0 2s 11 0 ry 0 12 0 28 0 13 0 2s 0 14 0 30 0 15 0 0 31 1s 0 INSTRUCTIONS On this form, list the average daily unit power level in MWeWet for each day in the reporting month. Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that when maximum dependable espacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

o.

DOCKET NO. 50-397 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME WNP-2 .

I? ATE 5/15/84 COMPLETED BY K. D. Cowan REPORT MON'III Aoril 1984 TELEPIIONE (509)377-2501 Ext. 2286 00ETHOD OF

. TYPE SHUTTING DOWN .

F: FORCEO DURATION THE REACTOR OR NO. DATE S: SCHEDULED (M REASON (1) REDUCING POWER (M- CORRECTIVE ACTIONS /COMRIENTS 840123 S 1144.0 B 1 Continuation of shutdown.

840423 F 67.2 G 3 The Scram was the result of a transient induced into Plant instrumentation while troubleshooting Reactor Feedwater Control Circuits.

I SusesARY: Plant remained in cold shutdown for performance of tarious tests associated with Plant preoperational test program and maintenance.

On 4/10/84, initial Plant heatup began. The Startup and Power Ascension Test Phase has continued into Test Contition 1.

II) REASON E: OPEftATOR TRAINING AND (2) METilOD A: FQUIP18ENT ITILURE(EXPLAINI LICENs0 EXAblINATION 1: MANUAL B: MAINT.OR TI57 F: AD%IINISIRATIVE 2: M ANIf AL SCRAM.

C: RI:l'ULLING C: OPI RATIONAL l'RROR (EXPi.AIN) 3: AUlOSIATIC SCRAM D: RLGULATORY RESTRICriON 11: OlllER (LXPLAINp 4: Oilli:R (EXPLAIN)

o

_ .~.

Washington Public Power Supply System P.O. Box 968 3000 GeorgeWashingtonWay Richland. Washington 99352 (509)372 5000 Docket No. 50-397 May 15, 1984 Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Sir:

Subject:

NUCLEAR PROJECT NO. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for April 1984 as required by our Technical Specification 6.9.1.6.

Very truly your D. Martin (M/D 927M)

WNP-2 Plant Manager JDM:de Enclosure cc: Mr. John B. Mart.n - NRC, Region V Mr. A. D. Toth - NRC, WNP-2 Site Ms. Dottie Sherman - ANI, Farmington, CT 66

,\

l