.i.

OPERATING DATA REPORT.

Revised 05-07-84 DOCKET NO.

50-244 DATE 04-07-84 COMPLETED BY d

[ ddo Robert E.

Dodge TELEPilONE (716) 524-4446 En. 196 OPERATING STATUS Ginna Station

1. Unit Name:

GINNA STATION. UNIT #1 Notc s The reactor power

2. Reporting Period:

March 7.

1984 level was maintained at

3. Licensed Thermal Power (MWt):

1.5_20 96% for the first two days 490 of March.

The unit re-

4. Nameplate Rating (Gross MWe):

470 moved from service 3/3/84

5. Design Electrical Rating (Net MWe):

for Annual AI&O.

490

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe): 470
8. If Changes Occur in Capacity Ratings (Items Number 3 Thcough 7) Since Last Report, Give Reasons:

N/A

9. Power Level to Which Restricted, If Any (Net MWe):

N/A

10. Reasons For Restrictions, If Any:

N/A This Month Yr.-to-Da te Cumulative 744 2.184 125.760

11. Ilours In Reporting Period
12. Number of Ilours Reactor Was Critical 50 OR 1.490.08 95,090.06 0.00 0.00 1.631.32
13. Reactor Reserve Shutdown flours 49.55 1,489.55 93,001.18
14. Ilours Generator On-Line 0.00 0.00 8.50
15. Unit Reserve Shutdown flours 64.896 2.207.424 12R 464.791
16. Gross Thermal Energy Generated (MWil) 21.028 733.488 41,897,RSR
17. Gross Electrical Energy Generated (MTII) 19,863 697,630 39,723,875
18. Net Electrical Energy Generated (MWil) 6.66%

68.20%

73.95%

19. Unit Service Factor 6.66%

68.20%

73.96%

20. Unit Availability Factor 5.68%

67.69%

68.96%

21. Unit Capacity Factor (Using MDC Net) 5.69%

67.69%

68.96%

22. Unit Capacity Factor (Using DER Net) 0.00%

0.00%

7.90%

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
25. If Shut Down At End Of Report Period, Estimated Date of Startup: May 6, 1984
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION y

gguq R

t.