OPERATING DATA REPORT.
Revised 05-07-84 DOCKET NO.
50-244 DATE 04-07-84 COMPLETED BY d
[ ddo Robert E.
Dodge TELEPilONE (716) 524-4446 En. 196 OPERATING STATUS Ginna Station
- 1. Unit Name:
GINNA STATION. UNIT #1 Notc s The reactor power
- 2. Reporting Period:
March 7.
1984 level was maintained at
- 3. Licensed Thermal Power (MWt):
1.5_20 96% for the first two days 490 of March.
The unit re-
- 4. Nameplate Rating (Gross MWe):
470 moved from service 3/3/84
- 5. Design Electrical Rating (Net MWe):
for Annual AI&O.
490
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe): 470
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Thcough 7) Since Last Report, Give Reasons:
N/A
- 9. Power Level to Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any:
N/A This Month Yr.-to-Da te Cumulative 744 2.184 125.760
- 11. Ilours In Reporting Period
- 12. Number of Ilours Reactor Was Critical 50 OR 1.490.08 95,090.06 0.00 0.00 1.631.32
- 13. Reactor Reserve Shutdown flours 49.55 1,489.55 93,001.18
- 14. Ilours Generator On-Line 0.00 0.00 8.50
- 15. Unit Reserve Shutdown flours 64.896 2.207.424 12R 464.791
- 16. Gross Thermal Energy Generated (MWil) 21.028 733.488 41,897,RSR
- 17. Gross Electrical Energy Generated (MTII) 19,863 697,630 39,723,875
- 18. Net Electrical Energy Generated (MWil) 6.66%
68.20%
73.95%
- 19. Unit Service Factor 6.66%
68.20%
73.96%
- 20. Unit Availability Factor 5.68%
67.69%
68.96%
- 21. Unit Capacity Factor (Using MDC Net) 5.69%
67.69%
68.96%
- 22. Unit Capacity Factor (Using DER Net) 0.00%
0.00%
7.90%
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: May 6, 1984
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION y
gguq R
t.