Forwards Rev 2 to 940608 LAR Revising Section 3.7/4.7,SGTS, Re SR to Operate SGTS Monthly as Well as Revised Performance Requirements for SGTS Filters & Process Stream Inline Electric Heaters
ML20091K634
Person / Time
Site: Monticello 
Issue date: 08/18/1995
From: Hill W
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20091K637 List:
References
TAC-M89739, NUDOCS 9508280103
Download: ML20091K634 (3)


Text

F V

Noethem States Power Company Monticello Nuclear Generating Plant 2807 West Hwy 75 Monticello, Minnesota 55362-9637 August 18,1995 U S Nuclear Regulatory Commission 10 CFR Part 50 Attn: Document Control Desk Section 50.90 Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Revision 2 to License Amendment Request Dated June 8,1994 Standby Gas Treatment and Secondary Containment Technical Specifications (TACM89739)

In our License Amendment Request dated June 8,1994, Monticello proposed changes to section 3.7/4.7, Standby Gas Treatment System, conceming the surveillance requirement to operate the Standby Gas Treatment System monthly as well as revised performance requirements for the Standby Gas Treatment System filters and process stream inline electric heaters. The proposed amendment included revised Standby Gas Treatment System and Secondary Containment limiting conditions for operation specified in section 3.7 to establish consistency. Changes were also proposed for the Secondary Containment capability surveillance requirement specified in section 4.7.

In our License Amendment Request Dated June 8,1994, Monticello proposed a change to section 4.7.C.1 to add the following provision after the requirement for demonstrating secondary containment capability under calm wind conditions:

If calm wind condition do not exist during this testing, the test data is to be corrected to calm wind conditions.

In our April 20,1995 submittal with subject, Revision 1 to License Amendment Request Dated June 8,1994, Monticello added a reference in the Technical Specification Bases to provide additionalinformation conceming the means employed to correct secondary containment capability test data to calm wind conditions.

By telephone conference call held June 16,1995 between members of the NRC Staff and Monticello Plant staff, additionalinformation was requested concoming the means employed to correct secondary containment capability test data to calm wind conditions. This submittal provides the requested information. In addition, the Staff requested that reference to the information contained in this submittal be provided in the Technical Specification Bases.

Exhibit A contains a description of the means employed to correct secondary containment capability test data to calm wind conditions. Exhibit B contains the current Technical Specification Bases page 188 marked up with the proposed changes. Exhibit C contains

,--ot 9508280103 950818 PDR ADOCK 05000263 m.--

.aQ

USNRC Northern States Power Company August'18,1995 Page 2 revised Monticello Technical Specification Bases page 188. This revised page supersedes the proposed changes submitted for page 188 in our correspondence dated April 20,1995. This submittal does not impact the evaluations performed on this subject in Exhibit A of our previous submittals.

This submittal contains the following new NRC commitment:

The general methodology described in Exhibit A will be employed to correct Secondary Containment capability tests to calm wind conditions.

Please contact Marvin Engen, Sr Licensing Engineer, (612-295-1291) if you require further information related to this request.

NYbN

/

William J Hill Plant Manager Monticello Nuclear Generating Plant c:

Regional Administrator-Ill, NRC NRR Project Manager, NRC Resident inspector, NRC State of Minnesota Attn: Kris Sanda -

Attachments: Affidavit to the US Nuclear Regulatory Commission Exhibit A - Additionalinformation Concerning License Amendment Request Dated June 8,1994, Standby Gas Treatment and Secondary Containment Technical Specifications Exhibit B - Technical Specification Bases Page marked up with proposed change Exhibit C - Revised Monticello Technical Specification Bases Page

TRANSMITTAL MANIFEST NORTHERN STATES POWER COMPANY NUCLEAR LICENSING DEPARTMENT MONTICELLO NUCLEAR GENERATING PLANT Revision 2 to License Amendment Request Dated June 8,1994 Standby Gas Treatment and Secondary Containment Technical Specifications (TACM89739)

Manifest Date:

August 18,1995 Correspondence Date: August 18,1995 Monticello Internal Site Distribution Special Instructions Kaleen Hilsenhoff.....USAR File..........Yes No_x_

Stsve Ludders........NRC Commitment....Yes_x_ No Lila Imholte.........Monti OC Sec.......Yes No_x_ - 11, No dist to OC members below if YES Msl Opstad............Monti SAC Sec...

..Yes_x_ No

-5

  • Mail Room............ Monti Posting...........Yes No_x_ - 7 Monticello Internal Site Distribution:
  • Monti Document Control File J C Grubb, NGSS, OC W J Hill, Plant MGR, SAC, OC L L Nolan, GSSA, OC C A Schibonski, GSE, OC B D Day, MGR MTC, OC M F Hammer, GSM, OC Operating Experience Coord J E Windschill, GSRS, OC W A Shamla, NQD Monti Site Lic File M W Onnen GSO, OC Dave Scott NRC Resident Inspector's Office Steve Hammer Lic History File NSP Internal Distribution E L Watzi R O Anderson, Dir LMI, SAC

)

Mike Wadley, PI T E Amundson, Dir NQD, SAC

)

Communications Dept Yes N o_x__

j External NSP Distribution

  • Doc Control Desk, NRC Kris Sanda, State of Minn Regional Admin-lli,NRC J E Silberg T J Kim, NRR-PM, NRC l