m, t
s INDUS'IRY EVAIDLTICN OF OPERATING SHIFT EXPERIENCE Ed.v.JuiMENTS m.wrs; i
BY:
J. H. Miller, Jr.
President, Georgia Power Ca pany For: NRC Castissioners
.11th Floor Conference Roca 5
1717.H. Street, Nort.mest l
Washington, D.C.
5 February 24, 1984 j
8406060472 840525 j
PDR ADOCK 05000341 A
PDR.
i
~
^
y
.1
' l
~
^ ~ ~ -
~
.. _ _ _SY XDE 1 BACKGROUND DATE EVENT January 26
- NRd Staff Meeting with NTOLS to Present
" ~ ~
Objectives February 2-22
- Operating Shift Experience Meetings Held 4
- Industry Working Group Formed
- Utility Management Accepted industry Working Group Findings February 24
- Presentation to NRC Commissioners 6
J 6
4 s
~'
7,,.._.,
wwn
\\
e PURPOSE Present industry po'sition on the level and type of operating shift experience required for.the safe startup and initial operation of a nuclear generating plant.
9 4
e t
v Y
e s
4
~"
~
~~_
~ :-
m, ELEMENTS OF PLANT EXPERIENCE
- Power Plant Machinery and Controls
- Plant Specific Layout and Design' Parameters l
i
- Response to Plant Transients
- Highly Disciplined, Tightly Controlled Environment
- Supervisory Experience 6
6 9
4 I
I I
7-
~
SLICE 4 TYPES OF NUCLEAR EXPERIENCE AND WEIGHTING FACTORC FORMULA Nuclear Experience = (Type of Nuclear Experience) x (Weighting Factor) 6 TYPES OF NUCLEAR EXPERIENCE SROlRO Same Type Plant SROlRO Commercial Plant Navy (Military) Plant Simulator Participation at Operating Nuclear Plant License Training Other Nuclear Experience Degree i
Experience on Own Plant
~
l b
?c
- r r r -- -
., - :,. =,.
~
~
~._
A OPERATING SHIFT EXPERIENCE REQUIREMENTS
- I Hot Participatio, Experience n
Power Nuclear at Same Type Plant
- Plant Plant Startup j
l}
Experience Experience and 6 Months Position Years Years License 720% Pwr Shutdown on Shift j
Shift Supy 4
2 SRO 6 weeks X
Either Sr Operator 3
2 SHO 6 weeks SRO Licensed Oper 3
1 HO 1
Licensed Oper 3
1 RO a
l Totals 13 6
- lf any of the Hot Participation Experience requirements are not satisfied by the SRO's, a qualilled advisor is required.
E
!E 2.
E A
+
f F
[
SLIDE 6 o
l NRC
~
STAFF CBJECTIVES t
- 1. At least one SRO on each operating shift should have a minimum of one year of. hot operating experience on a similar type commercial plant at the SRO level
- 2. Eliminate use of technical advisors for meeting minimum shift crew experience levels
- 3. All SROs should have substantial hot operating experience as ROs at facility on which licensed or similar facility 4
I i
I o
i Ly
a 4
EFFECTS OF NRC STAFF OBJECTIVES Dilute Shift Experience for Operating Plants Result in Loss of PreK")p Test Experience in Own Plant Delay Startup of Sorne Plants' l
f I
9 4
e m
u w
9
--w e-a-
+wev m.--,,,
s.="
1
~
SUMMARY
INDUSTRY POSITION'ON OPERATING SHIFT
~
EXPERIENCE REQUIREMENTS
- Follow Stated Experience Requirements for Operating Shift Personnel Shown on Slide 5 (Derived from ANS 3.1-1981)
- Use Weighting Factors in Assessing Experience
- Have at least One SRO with Six Months " Hot" Participation at the Same Type Plant on Each Shift
-OR-Provide a Qualified Advisor Until the Plant Staff Meets Stated Experience Requirements e
It
_