ML20091K277

From kanterella
Jump to navigation Jump to search
Slide Presentation Entitled, Industry Evaluation of Operating Shift Experience Requirements, Presented at 840224 Meeting Before Commissioners in Washington,Dc
ML20091K277
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 02/24/1984
From: John Miller
GEORGIA POWER CO.
To:
Shared Package
ML20091K262 List:
References
NUDOCS 8406060472
Download: ML20091K277 (9)


Text

--

m, t

s INDUS'IRY EVAIDLTICN OF OPERATING SHIFT EXPERIENCE Ed.v.JuiMENTS m.wrs; i

BY:

J. H. Miller, Jr.

President, Georgia Power Ca pany For: NRC Castissioners

.11th Floor Conference Roca 5

1717.H. Street, Nort.mest l

Washington, D.C.

5 February 24, 1984 j

8406060472 840525 j

PDR ADOCK 05000341 A

PDR.

i

~

^

y

.1

' l

~

^ ~ ~ -

~

.. _ _ _SY XDE 1 BACKGROUND DATE EVENT January 26

  • NRd Staff Meeting with NTOLS to Present

" ~ ~

Objectives February 2-22

  • Operating Shift Experience Meetings Held 4
  • Industry Working Group Formed
  • Utility Management Accepted industry Working Group Findings February 24
  • Presentation to NRC Commissioners 6

J 6

4 s

~'

7,,.._.,

wwn

\\

e PURPOSE Present industry po'sition on the level and type of operating shift experience required for.the safe startup and initial operation of a nuclear generating plant.

9 4

e t

v Y

e s

4

~"

~

~~_

~ :-

m, ELEMENTS OF PLANT EXPERIENCE

  • Power Plant Machinery and Controls
  • Plant Specific Layout and Design' Parameters l

i

  • Highly Disciplined, Tightly Controlled Environment
  • Supervisory Experience 6

6 9

4 I

I I

7-

~

SLICE 4 TYPES OF NUCLEAR EXPERIENCE AND WEIGHTING FACTORC FORMULA Nuclear Experience = (Type of Nuclear Experience) x (Weighting Factor) 6 TYPES OF NUCLEAR EXPERIENCE SROlRO Same Type Plant SROlRO Commercial Plant Navy (Military) Plant Simulator Participation at Operating Nuclear Plant License Training Other Nuclear Experience Degree i

Experience on Own Plant

~

l b

?c

r r r -- -

., - :,. =,.

~

~

~._

A OPERATING SHIFT EXPERIENCE REQUIREMENTS

I Hot Participatio, Experience n

Power Nuclear at Same Type Plant

  • Plant Plant Startup j

l}

Experience Experience and 6 Months Position Years Years License 720% Pwr Shutdown on Shift j

Shift Supy 4

2 SRO 6 weeks X

Either Sr Operator 3

2 SHO 6 weeks SRO Licensed Oper 3

1 HO 1

Licensed Oper 3

1 RO a

l Totals 13 6

  • lf any of the Hot Participation Experience requirements are not satisfied by the SRO's, a qualilled advisor is required.

E

!E 2.

E A

+

f F

[

SLIDE 6 o

l NRC

~

STAFF CBJECTIVES t

1. At least one SRO on each operating shift should have a minimum of one year of. hot operating experience on a similar type commercial plant at the SRO level
2. Eliminate use of technical advisors for meeting minimum shift crew experience levels
3. All SROs should have substantial hot operating experience as ROs at facility on which licensed or similar facility 4

I i

I o

i Ly

a 4

EFFECTS OF NRC STAFF OBJECTIVES Dilute Shift Experience for Operating Plants Result in Loss of PreK")p Test Experience in Own Plant Delay Startup of Sorne Plants' l

f I

9 4

e m

u w

9

--w e-a-

+wev m.--,,,

s.="

1

~

SUMMARY

INDUSTRY POSITION'ON OPERATING SHIFT

~

EXPERIENCE REQUIREMENTS

  • Follow Stated Experience Requirements for Operating Shift Personnel Shown on Slide 5 (Derived from ANS 3.1-1981)
  • Use Weighting Factors in Assessing Experience
  • Have at least One SRO with Six Months " Hot" Participation at the Same Type Plant on Each Shift

-OR-Provide a Qualified Advisor Until the Plant Staff Meets Stated Experience Requirements e

It