Forwards Rev 36 to Security Plan Per 10CFR50.54(p).Plan Withheld
ML20091K131
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 01/17/1992
From: Parker T
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9201220141
Download: ML20091K131 (2)


Text

- _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - -

. No them States Power Company l

i 414 Nicollet Mall Minneapolis, Mmnesota $54011927 Telephone (612) 330-5500 SAFEGUARDS INFORMATION January 17, 1992 10 CFR Part 50 Section 50.54(p)

U S Nuclear Regulatory Commission 10 CFR Port 73 Attn: Documet.t Control Desk Section 73.55(d)(8)

Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 Lic ase No. DPR 22 Monticello Security Plan Chance. Revis e d We are submitting four copies of Revision 36 to the Monticello Security Plan.

Revision 36 contains a completely rewritten Security Plan. This revision was written per the guidance contained in NUREG 0908. The revised plan removes ambiguities and clarifies security requirements. This revision will be easier to use and itaprove compliance. We have expended a great deal of effort preparing this revision. Gary Pirtle, Region III, and Barry Manili have provided a Breat deal of Suidance to us by reviewing drafts of this plan. Our hope is that the new revision will be easier for us and the NRC to use.

These changes do not decrease the effectiveness of the Security Plan and are being submitted pursuant to 10 CFR Part 50, Section 50.54(p).

Due to the magnitude of this change and the creation of new implementing -

procedures, implementation will not take place until February 17, 1992.

Training of the Security Force on the new implementing procedures has been conducted. The Traininr,and Qualification Plan is also being revised to clarify training requirements for the Security Force and incorporate changes resulting from Revision 36. This change to the Training and Qualification Plan will be submitted at a future date. -

When Separated from Enclosures, Handle This Document as Decontrolled SAFEGUARDS INFORMATION 220007 9201220141 920117 FTA r

ADOCK 03O O X c/1 ev=:

hr/

) .

(

Northern States Power Company

, USNRC January 17,- 1992 Page 2 SAFEGUARDS INFORMATION A synopsis of change identifying the changes made to the last draf t at the request of Gary Pirtle is attached. This revision contains no sidebars since it is a complete. rewrite of the plan.

The plan contains safeguards information as identified in 10 CFR Part 73. The plan should not be made available for inspection and should not be placed in the public document room.

If you have any questions, please call us.

tit & if(4 Thomas M Parker Manager Nuclear Support Services c: Regional Administrator-III (2 copies)

R B Manili, NRC+NRR (transmittal letter only)

Monticello NRR Project Manager, NRC (transmittal letter only)

Monticello NRC Resident Inspector (transmittal letter only)

J E Silberg (transmittal letter only)

Attachments: 1) Synopsis of Changes 2) Security Plan Change When Separated from Enclosures, x Handie This Document as Decontrolled SAFEGUARDS INFORMATION 4