ML20091J891
| ML20091J891 | |
| Person / Time | |
|---|---|
| Site: | Washington Public Power Supply System |
| Issue date: | 03/22/1984 |
| From: | Root R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| GO1-84-0080, GO1-84-80, NUDOCS 8406060252 | |
| Download: ML20091J891 (1) | |
Text
f 1
a.#
Washington Public Power Supply System P.O. Box 968 3000 GeorgeWashington Way Richland, Washington 99352 (509)372-5000 March 22, 1984 G01-84-0080 Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596 Attention:
J.B. Martin, Regional Administrator
Subject:
NUCLEAR PROJECTS N0. 1 AND 4 DOCKET NOS. 50-460 AND 50-513 QUALITY ASSURANCE PROGRAM DESCRIPTION
Reference:
Letter G01-83-0115, dated March 25, 1983, same subject As required by 10CFR50.54(a),
attached are the Quality Assurance program descriptions which are currently being implemented at WNP-1/4.
The only changes which have been made since the submittal which was transmitted via the above noted reference are position title changes, minor organizational structure changes, several editorial changes and an update of the general list of documents controlled by UE&C document control procedures.
Deviation No.17.1-6 (WP) Rev. 2 includes a proposed organization change which has been submitted to the NRC for approval by WNP-2.
Although not yet received, NRC approval is expected in the near term.
Due to the current extended construction delay at WNP-1/4, this anticipated organizational change does not effect the activities currently taking place on the Project.
Should you have any uestions regarding this subject please advise.
R.W. Root, J.
f' WNP-1 Program D rector
/
RWR/CRE/cmh Attachment E
cc:
TA Mangelsdorf, BPC (862)
V Mani UE&C (899) b l ;il OZ }] Al t,5E, EC Haren, UE&C (895)
NRC Document Control Desk FDCC 899 W;
BDCC 828 EEE ORM 847 8406060252 840322
%" * " ***Va w-za 9 m