florthem States Power Company 414 Nicollet Mall e
Minneapohs. Minnnota 65401 1927 Telephone (612) 3304500 Jsnaary 8, 7.991 Monticello Technical Specifications Section 6.7.A.3 US Nuciear Regulatory Commission Attn: Docuneat Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERAi1NG PLANT Docket No. 50 263 License No. DPR 22 Monthly Operating Report December 1991 i
Attached is the Monthly Operating Report for December 1991 for the Monticello Nuclear Generating Plant.
Zh J(s,d /
Tnomas tar.ce r Manager Nuclear Support Service TMP/mkl C:
' Director,_ Office of' Resource'Managem'ent
[
i
'" Regional Administrator-III. NRC NPJt Project Manager, NRC NRC Resident Inspector MPCA Actn: J W Terman Attachment 4
0 0 cJ <
///
v1 9:ou.wou,u m I
i f',DR fiDOCK 030002,_,
i{
OPERATII(G"DATK sErdaf - ~ ~ ~ ~~~~ ~ ^ - ~ ~ "' ~
t i
DOCEET No.
50-263 i
DATE 1-7~T4 COMPLETED BY H. H. Paustian l
TELEPHONE 612/295-5151 i
1 OPERATING STATUS
) Notes
)
Monticello
)
)
i
- 1. Unit Name :
DECEMBER
)
)
,2.
Reporting period:
- 3. Licensed Taermal Power (MWt):
1670
)
)
- 4. Nameplate Rating (Gross MWe):
__569
)
)
'5. Design Electrical Rating (Net MWe): _
545.4
)
)
- 6. Maximum Dependable Capacity (Gross MWe):
564
)
)
1
- 7. Maximum Dependable capacity (Het MWe):
~~536
)
)
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last j
Report, Give Reasons t
9.PowerLevelToWhichRestricted,IfAny(NetM}e): ___N/A N/A
- 10. Reasons For Restrictions, If Anyt T!!IS MONTH -
YR.-TO-DATE CUMULATIVE
- 11. Hours In Reporting Period 744 8760 179737
- 12. Number Of Hours Reactor Was Critical 744.0 7075.6 143418.4
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 940.7 t
- 14. Hours Generator on-Line 744.0 6997.4 140747.9 415. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1241071 11210643 215533577
.17. Gross Electrical Energy Generated (MWH) 419032 3761285 72889845
- 18. Net Electrical Energy Generated (MWH) 402691 3594971 (9702218
- 19. Unit Service'ractor 100.0%-
79.9%
78.3%
f
.20. Unit Availability ractor 100.0%
79.9%
78.3%
- 21. Unit Capacity Factor (Using MDC Net)
~101.0%
76.6%
72.4%
i
- 22. Unit Capacity Factor (Using DER Net) 99.2%
75.2%
71.1%
~-
- 23. Unit Forced Outage Rate O.0%-
.3.1%
3.9%
.24. Shutdowns Scheduled over Next 12 Months (Type, Date, and Duration of_Each) 2
__None
- 25. If Shut Down At End Of Report Period, Estimated Date Of Startup N/A
- 26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION i
f
.-,,,..,r,,
- ~
,m
._,-,..._._,m,._..._,-_m._,.-.
,..,, -.. ~..
NARRATEVE
SUMMARY
Or OPERATING EXPERIENCE DOCKET NO.
50-263 DATE 1-2-92 COMPLETED BY
!!. 11. Paustian TELEP110NE 612/295-5151 i
MONTil DEC l
13-1-91 to Power operation.
12-31-91
\\
i i
?
p b
l l
Note Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing.
u l
l 1
...,. -,.,,.,., -.., _, -,. - -. - - ~ - -
-.m.-.
.. -,..,. _ _ -. -.. -,..,....., -, ~,
- - - - ~ - -. - -. ~ _-. - _... -. -
AVEPAGE DA2LY UNIT POWER LEVEL 3
DOCKET No.
50-263 UNIT Monticello-
~~
DATE 1-2-92 I
COMPLETED BY
- 11. H. Paustian TELEPil0NE 612/295-5151
' MONT!! 0F DECEMBER DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net)
I i
1 542.
(7 539.
2 342.
18 539..
f 3
549.
19 541.
- 536, 20 544 5
541._
=21 555..
6
-539, 22
- 540, 7
539.
23 520.
8 542.
24 540.
9 541.
25 534.
10
- 544, 26
- 545, 11 544.
27 543.
12 544..
28 543.
13 542.29-543.
~
14 541.
30 541.
15 542.
31 544.
16 541.
INSTRUCTIONS I
on'this format, list.the' average daily un'it power level in MWe-Net for-each
-day in-the reporting month.. Compute to the nearest whole megawatt.
~
t
~,w-,--c,
<,s e
,rer
'q.,,9e,..
.-r
,.-,m-,-.,.e,.-
.,ny.
y a,;~,-
s g 4 v,-,
---...n4
-g,,--,-.
,ew-
+=
m s e -
w,- -- -, m -e
l IRET SHUI 1XN!G AND POVER FIDUCTY0tG DocKETro. 50-263 i
(2 TIT FW1E ~Monticollo DATE 01-02-92 COMPI1TED BT ~11. H. Paustiar.
PIPORT H0tGH _ December _
TELEPH0tE 612/295-5151 -
A No.
Date Type ' Duration Reason Method LER System Cause & Corrective (1)
(hours)
(2) of No.
Code e
Action to Shutdown (4)
(5)
Prevent Recurrence (3)
None t
i l
l t
h i
i' 1
2 3
4 F:. Forced -
Reason:.
Method:
Draft IEEE Standard S: Scheduled.-
A-Equipment Failure (Explain) 1-Manual 805-1984(P805-D5)
B-Maintenance or Test 2-Manual Scraa
' C-Refueling 3-Automatic Scras' 5
D-Regulator Restriction 4-Other (Explain)
IEEE Standard 803A-1983
.E-Operator Training & License Examination F-Administrative C-Operational Error (Explain)
U-Other (Explain) l l
1 l
......