Provides Response to NRC 911205 Re Violations Noted in Insp Repts 50-443/91-32.Corrective Actions:Operations Manager & Operators Counselled on Requirements to Obtain Station Manager Approval for Work H in Excess of Station Guidelines
ML20091J363
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 01/06/1992
From: Feigenbaum T
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NYN-92002, NUDOCS 9201130103
Download: ML20091J363 (5)


Text

______

k i

New' Hampshire

[

h]

{

Fjecudent and Ted C. Feigenbovm 0,el t uwt.e uhe.

NYN. 92002 January 6,1992 linited States Nuclear Regulatory Com.nission Washington, D.C.

205$5 Attention:

Docurnent Control Desk Re ferenc e s:

(a)

Facility Operating License No. NPF 86, Docket No. $0-443 (b)

USNRC 1.etter dated Deu '

$,1991, *NRC Region I inspection 30 443/91 32 (10 15-91/11 18-J. C.1.inville to T. C l'cige n ba um

Subject:

Reply to Notice of Violation (ientlemen:

In accordance with the requirements of the Notiu: of Violation cor.tained in Reference (b). the New llampshire Yankee response to the cited siolation is provided as Enclosure 1.

Should you hase any questions concerning this response, please contact Mr. Jarnes M.

Peu hel, Rcrulatory Compliance Manner, at (603) 474 9521, estension 3772.

'/ery truly yours, fgg', 24 1 64 Ted C. FeigriIl anm linclosure TCF:TGP/ss STATE OF NEW ll AMPSillRE Rockingham, ss.

January 6, 1992 Then personally appeared belcre me, the abuse-named Ted C. Feigenbaum, being duly sworn, did state, hat ne is President & Chief thecutisc Officer of the New llampshire Yankee Division of Public Ser / ice Company of New llampshire, that he is duly authorized t

execute and file the foregoing information in the name and on the behalf of New llampshire Yankee Disision of the Public Sersice Company and that the statements 'herein are true to the best of his knowledge and belief.

s ftld/ $. 0f $Kd' W Tracy A DeCredico, Notary Public My Commission Expirea: October 3,1995

_4

>o n

g, /

y

/

g o

New Hampshire Yonkee Division of Public SelYice Company of New Hampshire P.O. Box 300

  • Soobrook, NH 03874
  • Telephone (603) 474 9521 (g

.1000rii

i Onited States Nuclear Regulatory Comrnission January 6,1992 Attention:

Document Control Desk Page two cc:

hir. Thornas T. htartin Regional Administrator U. S. Nuclear Regulatory Commission Region 1 473 Al'andale Road King of Prussia, PA 19406 Mr. Gordon E. Edison, St. Project Manager Project Directorate 13 Division of Reactor Projects U.S. Nuclear Regulatory Commission Washington, DC 20555 Mr. Noel Dudley NRC Senior Resident luspector P.O. Ilox 1149 Seabrook, Nil 03874

... ~ - _ _.. _ - _ _ _ _, _. _ _.

a i

L f

l l

1 i

New 11ampshire YnnLee i

January ti, 1992 l

a i

i I

f

(

)

b I?NCI.OSURl! TO Ni N 92002 t

i i

h s

I 1

e 3

L i

9 F

5 t

i

.-.* -,.-4.~._

r.4,,,...,,...,,,.....,,4._.-_.,-;,._..-_...........----...__.._......-.

9iolation During the NRC Inspection of October 15, 1991 to November 18, 1991, a violation of NRC requirements was identil,ed in accordance with the General Statement of l'olicy and Procedure for NRC Enforcement Actions 10CFR, part 2, Appendix C.

That violation is listed below:

Technical Specification 6.2.2.(c) requires administrative procedures be developed and implemented to limit the working hours of station staff who perform safety rels.ted f anctions, such as licensed operators. New ilampshire Yankee Station Management M a nual. Chapter 2,

Section 6.2,

' Extended Work ' lour Requirements For 6

Safety Related Functions," requires Station Manager's authori:ation documented on SSMM Form 4 4A, ' Extended Work llours Authorization,' for any individual to work more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> within a seven day perloo.

Contrary to the above, during the week ending August 14, 1991, 'wo licensed operators did not receive Station Manager's documented acthorization prior to working more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> within a seven day period.-

This is a Severity Lesel IV violation (Supplement 1).

Renser..' N.

flotation

.W apshire Ynnkee (NilY) has determined that the tenson for this vio'ation was N

an udmi.. a.

<c error.

The Operations Manager approves the Operations Shift Schedule and perf t..m a review of the Extended Work llours Authoritation forms to suppoit the Shift Schedule. Extended Work llours Authorization forms (SSMM Form 4 4A) are then submitted to the Station Manager for his approval. Contrary to these requitements, the Operations Manager f ailed to identify the need for the Extended Work llours Authorization forms for two licensed operators who were assigned Work Control Activitics, (eg. proc slui; on requests and preventative maintenance activities).

,(ptteetive Action to prevent Reeterrence The Operations Manager and the two licensed operntors were counselled on the requirement to obtain Station Manager approval for work hours in excess of the Station guidelines.

A ' walk thru' of the Station Management Manual adminhtrative process used to approve extended work hours was performed to ensure.that all administrative barricts that could have prevented this occurrence were verified and understood, it was determined that the administrative process used to prepare, review, approve and i. sue Extended Work llours Autbrization requires no changes. This was an isolated incident, and on an overall basis, the effectiveness of the admin istrative process was proven during the refueling outage.The Station Manager continually utressed, throughout the outage, the need and requirement to effectively complete all ad:Vnistrative activities in a correct and timely manner, and specifically the Extended Work llours Authorization requests.

1

\\

O NilY is presently developi'l plans and schedules for the Secotsd liefueling Outage including manpower and shift schedule requirernents. In conjunction with these planning activities, the Station hinnager is evaluating the need to make adjustruents, to the refuelitag shift schedules. It is anticipated that this review and any revisions to the refueling outage shif t schedules will be cornpleted by September 1,1992.

Date of Full Comollanet New flampshire Yankee is currently in compilance with Technical Specification 0,2. 2. ( e ). Additionally, the long term corrective actions described above are expected to ensure continued compliance with this Technical Specification.

1 2