Reuests Exemption from Reporting Requirements of 10CFR50.73 Re Airborne Radioactive Releases.Util Proposes to Rept Releases of Radioactive Matls in Gaseous Effluents Exceeding Tech Specs.Table Outlining Max Limits Encl
ML20091J330
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/31/1984
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: Adensam E
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0472, RTR-NUREG-472 NUDOCS 8406050476
Download: ML20091J330 (3)


Text

,

p TENNESSEE VALLEY AUTHORITY CHATTANOOGA, TENNESSEE 374ot 400 Chestnut Street Tower II May 31, 1984 Director of Nuclear Reactor Regulation Attention:- Ms. E. Adensam, Chief Licensing Branch No. 4

' Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Ms. Ade sam:

In the Matter of

)

Docket Nos. 50-327 Tennessee Valley Authority

)

50-328 We request an exemption to the reporting mquirements of 10 CFR 50.73(a)(2)(viii)A, which became effective January 1, 1984, regarding airborne radioactive releases for Sequoyah Nuclear Plant (SQN). This plant has implemented the Nuclear Regulatory Commission (NRC) -dose methodology guidelines (Regulatory Guide 1.109 - October 1977-R1, NUREG-0472) in the Offsite Dose Calculation Manual (ODCM) to demonstrate compliance with 10 CFR 50, Appendix I criterion, '"As Low As Is Reasonably Achievable (ALARA) for Radioactive Material in Light Water Cooled Nuclear Power Reactor Effluents."

The enclosed table I outlines the maximum permissible boundary concentration limits of Appendix B of 10 CFR 20,10 CFR 50.73 reporting values, and SQN site boundary concentration limits derived from ODCM methodology to meet 10 CFR 50, Appendix I and Technical Specification (TS) 3 11.2.1 dose criteria for SQN.

Site boundary noble gas concentrations, approximately one-third of the derived TS allowable normal-operating limits, would have to be reported as Licensee Event Reports unless an exemption to the 10 CFR 50.73 reporting mquirements is

. granted.

Therefore, TVA requests an exemption to the reporting mquirements of 10 CFR 50 73(a)(2)(viii) A to resolve the inconsistency between the reporting mquire-ments of 10 CFR 50.73 and the TS for SQN. TVA proposes to report those conditions for which releases of radioactive materials in gaseous effluents exceed the limits of the TS, provided as Appendix A to the operating license for

- each unit.

8406050476 840531 PDR ADOCK 05000327 6pq p

PDR

' l 1983-TVA 5OTH ANNIVERSARY An Equal Opportunity Employer

[

l

  • ^

p'

-2.

Director of Nuclear Reactor Regulation May 31,1984 If you have any questions concerning this matter, please get in touch with

' Jerry Wills at FTS 858-2683 Very truly yours, TENNESSEE VALLEY AUTHORITY 9

L. M. Mills,' Manager Nuclear Licensing Sworn,

subscrib before me this day of 1984 5 'RM

. Notary Publio j

'My Commission Expires 7"

~

Enclosure-00:

U.S. Nuclear Regulatory Commission (Enclosure)

Region II Attn: Mr. Tames P. O'Reilly Administrator 101 Marietta Street, NW, Suite 2900

. Atlanta, Georgia 30303 2

T

~-

S f

N c

. L

' TABLE I

. ( -f di A.

t:

SEQUOYAH-NOBLEGAS' PARAMETERS / LIMITS-[SITEBOUNDARY

=

l

I, ll

-Isotope Appendix Conc.

, a)(2)(viii)A-l Concentration limits. based on technical specification

(

ll Limits, pci/cc pCi/cc dose limits of 500 mrem /yr total body or. 3000 mrem /yr.

to the skin (most controlling of either)

Ar41 4E 8E-8 5.66E Kr85m 1E-7 2E-7 4.27E-7 Kr85 3E-7 6E-7 2.21E-6 a

Kr87 2E-8 4E-8 8.44E-8 Kr88 2E-8 4E-8 3.4E Kr89 3E-8 6E-8 3.01E-8 Xel31m 4E-7 EE-7' 4.66E-6 Xel33m 3E-7 6E-7 1.99E-6 Xel33 3E-7 6E-7 1.70E-6 Xe135m 3E-8 6E 1.60E-7 Xe135 IE-7 2E-7 2.76E-7

{

Xel37 3E-8 6E 2.17E-7 Xe138 3E-8 6E-8 5.66E-8 (1) Design source term isotopes (2) Derived from Regulatory Guide 1.109, R1-1977 table B-1 and technical specification 3.11.2.1 dose rate limits of 500 mres/yr total body or 3000 mrem /yr skin. NOTE: These concentration limits are independent of any nuclear plant meteorological variation; therefore, they would be applicable for all TVA plants implementing the standardized technical specification format.

.