ML20091J300
Jump to navigation
Jump to search
| ML20091J300 | |
| Person / Time | |
|---|---|
| Site: | 07000398 |
| Issue date: | 03/18/2020 |
| From: | Ty Naquin NRC/NMSS/DFM/FFLB |
| To: | Mejias M US Dept of Commerce, National Institute of Standards & Technology (NIST) |
| Naquin T | |
| References | |
| Download: ML20091J300 (1) | |
Text
From:
Naquin, Ty To:
Mejias, Manny (Fed)
Subject:
Information on...
Date:
Wednesday, March 18, 2020 10:19:00 AM I have a little bit of information to go with for the time being:
- 1. Regarding the original of the 9/23/2019 DFP - I will issue the approval of the review of with a caveat to send in a signed original within 60 days. If we are still fighting this thing at that time, you, as the RSO, could send me a letter requesting an extension, and I will put something together to grant another 60 days. I would have like to be entirely done with it, but they choose to stand by the requirement for a signed original, even though the regulation allows for acceptance of a copy. I have pitched that to them, that, NIST being another government facility should give us some basis on which to accept a copy. Ill let you know if this changes. In the meantime, I will give you my mailing address at the NRC, whereby you could send a signed original directly to me. In parallel, if you were to send me an electronic copy so I can be looking for it.
Tyrone D. Naquin Nuclear Regulatory Commission Mailstop T4-B34 Washington, DC 20555-0001
- 2. Regarding the possession limit delay on responding to the RAI, as I mentioned, send me an email explaining the delay. I will docket that and grant via email and extension.
Anyway, I hope this covers all this. If there are any questions, dont hesitate to call me.
Ty T. D. Naquin, CHP NMSS/DFM/FFLB (301) 415-7352