ML20091J000

From kanterella
Jump to navigation Jump to search
Intervenor Exhibit I-MOSBA-53,consisting of Transcript of Tape 184
ML20091J000
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 07/06/1995
From:
AFFILIATION NOT ASSIGNED
To:
References
OLA-3-I-MOSBA53, NUDOCS 9508170101
Download: ML20091J000 (3)


Text

_.

i i

g f- /MDSBA - 53 DOCKETED USNRC i

4

'l' 2

INT. EXH. 53

- 95 J127 P2.42 l

3 TAPE 184 Date: End of August 4

Location: 2nd floor Service Buil Cf hRETARY

{

t aylCE 6

BRANCH 7

SEGMENT #1 8

TR. 26 9

10

'11 BOCKHOLD:

Lets go to the first paragraph.

12 HORTON:

Hold on a minute.

There's another issue

{

13 on this page.

14 HORTON:

Uh, previously Note 2 said, well we'll get 15 to it'in a minute in that paragraph, but i

I want to point out to the

[

16 board members the one, two three, four, five, six, the first seven

'i 17 runs, 120 thru 126.

We -- we're fixing to count start attempts in 18 that Note 2 as -- not counting five, the first five starts.

I joct i

19 want everybody to look at it now when we get back to the verbiage 20-we're going to need to address our Vogtle definition of a post 21 maintenance start.

This is an issue with the NRC.

t 22 BOCKHOLD:

What that we --

23 HORTON:

That we have post maintenance, uh, 24 ahakedown is the word that is used by one of the region folks.

25

)

BOCKHOLD:

What.

I mean if you got, if you are doing i

26 a post maintenance run and you had the machine apart, uh --

27 HORTON:

There's no such thing in the reg. guide.

28 AUFDENKAMPE:

I remember all of a sudden. The more I do 29 the more I remember.

What we did was tie the words, should be

(

l 30 4 -

. considered valid tests and failures together.

31 HORTONi

-I think it's the first sentence in 1

W bes\\tIruicense Ucuapes.a:un n.s3 NUCLEAR REGULATORY COMMISSION P

Docket No. 50-424/425-OLA.3 EXHIBITNO}t Ed3 in the rnatter of Georoia Power Co. et af. Voatie Units 1 & 2 O Staff O Applicant E Intervenor O Other 9508170101 950706" POR ADOCK 05000424 gIdentified QB Received O Rejected Reporter (4 7

PM new oy.oc-qr witne,

M. A A 3

w

1; paragraph 7 on the next page.

2.

AUFDENKAMPE:

They should be considered valid tests.

f P

f l

l 4

l i

I J

i i

j ni swr.d3es t inu seense.t re tt er es, ine : t 4 -Ex. 51 s

1

+

i

._g.

i 11' SEGMENT #2' 2.-

.TR.

28,-29 3

4 HORTON:

'Okay, my final' issue here'is really with 6

' number 124.

Uh, based on my research, we're hard pressed-to call

~

7a that ca. post maintenance run,

'm not sure how somebody d'ecided 8
previously that starts [NRC, GPC
123 and 124] [ INT: 120 ~ through 9

124]-were post maintenance runs.

l

10 '

BOCKHOLD:

Was that in, in any of the previous I

11' documentation?

12 VOICE:

No.

13 HORTON:

Well every sheet is checked. of f post r

14 maintenance --

b 15 BOCKHOLD:

No,'no, no, no, no, no.I'm talking about

-16

<the LER.

Are there.any other (inaudible).

Then, then it's not an

,17 issue.

18 19 f

d I

t wa rec sup\\ne.n=* rreu r... atu n rx.o

,