ML20091J000
| ML20091J000 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 07/06/1995 |
| From: | AFFILIATION NOT ASSIGNED |
| To: | |
| References | |
| OLA-3-I-MOSBA53, NUDOCS 9508170101 | |
| Download: ML20091J000 (3) | |
Text
_.
i i
g f- /MDSBA - 53 DOCKETED USNRC i
4
'l' 2
INT. EXH. 53
- 95 J127 P2.42 l
3 TAPE 184 Date: End of August 4
Location: 2nd floor Service Buil Cf hRETARY
{
t aylCE 6
BRANCH 7
SEGMENT #1 8
TR. 26 9
10
'11 BOCKHOLD:
Lets go to the first paragraph.
12 HORTON:
Hold on a minute.
There's another issue
{
13 on this page.
14 HORTON:
Uh, previously Note 2 said, well we'll get 15 to it'in a minute in that paragraph, but i
I want to point out to the
[
16 board members the one, two three, four, five, six, the first seven
'i 17 runs, 120 thru 126.
We -- we're fixing to count start attempts in 18 that Note 2 as -- not counting five, the first five starts.
I joct i
19 want everybody to look at it now when we get back to the verbiage 20-we're going to need to address our Vogtle definition of a post 21 maintenance start.
This is an issue with the NRC.
t 22 BOCKHOLD:
What that we --
23 HORTON:
That we have post maintenance, uh, 24 ahakedown is the word that is used by one of the region folks.
25
)
BOCKHOLD:
What.
I mean if you got, if you are doing i
26 a post maintenance run and you had the machine apart, uh --
27 HORTON:
There's no such thing in the reg. guide.
28 AUFDENKAMPE:
I remember all of a sudden. The more I do 29 the more I remember.
What we did was tie the words, should be
(
l 30 4 -
. considered valid tests and failures together.
31 HORTONi
-I think it's the first sentence in 1
W bes\\tIruicense Ucuapes.a:un n.s3 NUCLEAR REGULATORY COMMISSION P
Docket No. 50-424/425-OLA.3 EXHIBITNO}t Ed3 in the rnatter of Georoia Power Co. et af. Voatie Units 1 & 2 O Staff O Applicant E Intervenor O Other 9508170101 950706" POR ADOCK 05000424 gIdentified QB Received O Rejected Reporter (4 7
PM new oy.oc-qr witne,
M. A A 3
w
1; paragraph 7 on the next page.
2.
AUFDENKAMPE:
They should be considered valid tests.
f P
f l
l 4
l i
I J
i i
j ni swr.d3es t inu seense.t re tt er es, ine : t 4 -Ex. 51 s
1
+
i
._g.
i 11' SEGMENT #2' 2.-
.TR.
28,-29 3
4 HORTON:
'Okay, my final' issue here'is really with 6
' number 124.
Uh, based on my research, we're hard pressed-to call
~
7a that ca. post maintenance run,
- 'm not sure how somebody d'ecided 8
- previously that starts [NRC, GPC
- 123 and 124] [ INT: 120 ~ through 9
124]-were post maintenance runs.
l
- 10 '
BOCKHOLD:
Was that in, in any of the previous I
11' documentation?
12 VOICE:
No.
13 HORTON:
Well every sheet is checked. of f post r
14 maintenance --
b 15 BOCKHOLD:
No,'no, no, no, no, no.I'm talking about
-16
<the LER.
Are there.any other (inaudible).
Then, then it's not an
,17 issue.
18 19 f
d I
t wa rec sup\\ne.n=* rreu r... atu n rx.o
,