Applicant Exhibit A-140,consisting of Affidavit of Jg Aufdenkampe
ML20091H892
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 07/20/1995
From: Aufdenkampe J
GEORGIA POWER CO.
To:
References
OLA-3-A-140, NUDOCS 9508140318
Download: ML20091H892 (41)


Text

._

lf('

f-/yo

~

E

^'

r.

e:

00CKETED USNRC j

AFFIDAVIT OF JOHN.G. AUFDENKAMPE,.JR.

W Jll 27 P4 :51 I,

John G.

Aufdenkampe, Jr.,

being duly sWYi?E dta!OtEMRY 00CKEIlNG & SERVICE follows:

CHA!CH 1.

-I, am currently employed by Southern Company Services, Inc., as Design Team Leader for the Vogtle Project in Birmingham, Alabama.

In 1990, I was employed by Georgia Power Company as the Manager, Technical' Support at the Vogtle Electric Generating Plant

("Vogtle").

A summary of my professional experience and qualifications is attached to my Prefiled Testimony on Diesel Generator Reporting Issues as Exhibit A (GPC Exh. 27).

{

2.

I have prepared this affidavit in response to the Licensing Board's request for information regarding calculation of 4

the Safety System Performance Indicator

("SSPI")

for Vogtle Emergency AC Power in the 1989-90 time frame.

Tr. 4852-53 (May 17, 1995).

3.

In 1989, as is still the case today, INPO required the station SSPI for Emergency AC Power to be calculated by taking the average of the individup( diesel generator SSPIs.

The individual j

i SSPIs are calculated using the following formula:

Unavailable-Hours Hours System Required t

j r

" Unavailable Hours" (sometimes referred to as Hours out of

[

Service ("OOS")) include known unavailable hours (consisting of

' UCLEAR REGULATORY COMMISSION C

N Docket No. 50-424/425-OLA-3 EXHIBITNo.

-i +0 l

In the matter of Georala Power Co. et af.. Voatie Units 1 & 2

[gidentinph Staff icant O intervenor O Other Received O Rejected pporter KHW O

PM l# $ witness M ofb m L-Dam 7 lt 1

S planned unavailable hours plus unplanned unavailable hours) and estimated unavailable hours.

Planned unavailable hours are hours the diesel generator ~is removed from service' for preventive maintenance activities, surveillance testing, plant modifications, i

and any 'other time equipment is electively removed from service and the activity is planned in advance.

Unplanned unavailable hours are hours when the-diesel generator is out of service _- for' corrective maintenance following a failure or human error and any'

-other known unavailable hours due to unplanned causes.

Estimated

~ unavailable hours are the estimated hours the Diesel Generator'is in a failed state prior to being discovered by a-test or operational demand. The estimated unavailable hours are calculated as 1/2 the duration from the last successful operation or test of the diesel to the time of discovery.

" Hours System Required" is the total number of hours the Diesal Generator is required to be operational during the period of t

time for which the SSPI is being assessed.

Since a Diesel Generator is required for all plant operating modes (i.e.,

1 through 6), the " Hours System Required" is equal to the total calendar hours during the assessment period.

i 4.

The SSPI is calculated for each Diesel Generator, and then the station SSPI'is calculated by summing the SSPI's for each Diesel Generator and dividing by the total number of Diesel i

Generators. ' As an example, assume Vogtle's four Diesel Generators

' had the following Unavailable Hours for a month with 31 days (i.e.,

l t,

I I

s s

a s

744 hours0.00861 days <br />0.207 hours <br />0.00123 weeks <br />2.83092e-4 months <br />):

Diesel Unavailable 1

j.

' Generator Hours-1A 10 1B-6 2A 4

4 2B 13 The SSPI _ for each Diesel Generator and - the -station would be' calculated as shown below:

i 1A SSPI 10/744=0.0134 1B SSPI 6/744=0.0081 2A-SSPI 4/744=0.0054'

~

2B SSPI 13/744=0.0175

[

Station SSPI:

(0.0134+0.0081+0.0054+0.0175)/4 = 0.0111-i 5.

The Emergency AC Power SSPI YTD for Vogtle at the end of February 1990, including 353.53 estimated unavailable hours for diesel 2A in January 1990, was 0.0804.

Egg Performance Monitoring letter sent from the Vogtle site to the corporate office, dated March 16,

1990, (Georgia Power letter log number NOTS-00328),

' attached hereto as Aufdenkampe Exhibit Q,

item A.19 (Diesel l

Generator Reliability).

i l

i.

6.

While INPO guidance for 1989 required that estimated unavailable. hours be included in the calculation of SSPI, Plant i

i i

Vogtle.- personnel identified no - estimated unavailable hours for 1989. The calculated Year to Date ("YTD") SSPI for Plant Vogtle at-the : end -of 1989 was 0.0052.

Egg Performance Monitoring letter.

dated January 11, 1990 '(Georgia ' Power letter log number NOTS-00252)', attached hereto'as Aufdenkampe Exhibit R', item C.12 (Diesel

~

Generator' Reliability).;

f i -

t

~v.

w w

e

i s

r 7.

During my. testimony at the Vogtle license amendment hearing, I explained my understanding of the reason why estimated

[

unavailable hours -were included in the calculation of SSPI beginning in January, 1990.

Tr. 4851-54.

I was incorrect.

That is, there was - no change in Vogtle's methodology or in INPO 1

guidelines concerning estimated unavailable hours in the 1989-90 t-

~ time frame.

While there was a change in INPO guidelines issued in

1989, it did not affect the way estimated hours were to be calculated._

f.

8.

I do not know why the February 1990 YTD SSPI was not-included in the SSPI information which I understand was provided to NRC IIT members in April 1990.

I have no recollection of the specific reasons for that decision or who made that decision.

I certify that the foregoing statements are true and correct i

to the best of my personal knowledge and belief.

'l

  • b W

w24 En G. Aufde6kampe,V g(.'

p Sworn to and subscribed before me this /7 th day of July 1995.

Q.A4 Notary Public My commission expires:

Ww le 1999

Nuclear Ftnt Vogtla 9I

. nos to G: gia 30830 GPC EXHIBIT

.5 tieonona 404 724 8114 404 554 9961 0

4 ww,m.ni v u.

g g%

g g

Ra Georgia Power

?*e SCL.?"t e+C!rt Svste"*

Derf

{

DATE:

March 16, 1990 RE:

VNS-AP-19 Performance Monitoring Log: NOTS-00328 FROM:

G. Bockhold, Jr.

TO:

C. K. McCoy data input from VEGP for the month of February, r ormance If you have any questions, please contact J. C. Williams at ext 4279.

nsion i

h e/GB/chd JCW Attachment xc:

W. F. Kitchens W. L. Burmeister J. C. Williams M. D. Barker C. C. Tynan N. O. Superintendents N. O. Managers NORMS h

PLANT PERFORMANCE INDICATORS

).

I t

]

c JANUARY

. FEBRUARY MARCH A. OPERATIONS t

1.

EQUIVALENT AVAILABILITY FACTOR (%)

i UNIT 1 MONTHLY 92.58 76.06 1

UNIT 1 YEAR-TO-DATE 92.58 84.74' UNIT 1 ROLLING AVERAGE 93.99 93.41

. (12 MONTH)

UNIT 2 MONTHLY 97.33 99.83 i

UNIT 2 YEAR-TO-DATE 97.33 98.52 UNIT 2 ROLLING AVERAGE 93.39 94.02 (12 MONTH)

PLANT MONTHLY 94.95 87.94 1

PLANT YEAR-TO-DATE 94.95 91.63 PLANTROLLING AVERAGE i

93.74 85.86 (12 MONTH) 2.

UNAVAILABLE GENERATION (HRS)

a. FORCEDOUTAGE UNIT 1 MONTHLY 23.70 3.07 4

UNIT 1 YTD 23.70 26.77 i

UNIT 2 MONTHLY 0.00 0.00 UNIT 2 YTD 0.00 0.00

b. MAINTENANCE OUTAGE UNIT 1 MONTHLY 0.00 0.00 4

UNIT 1 YTD 0.00 0.00 j

UNIT 2 MONTHLY 0.00 0.00 UNIT 2 YTD 0.00 0.00

c. PLANNED OUTAGE (BASIC)

UNIT 1 MONTHLY 0.00 121.93 UNIT 1 YTD 0.00 121.93 UNIT 2 MONTHLY 0.00 0.00 UNIT 2 YTD P

0.00 0.00

d. PLANNED OUTAGE (EXTENDED)

UNIT 1 MONTHLY 0.00 0.00 UNIT 1 YTD 0.00 0.00 UNIT 2 MONTHLY 0.00 0.00 UNIT 2 YTD 0.00 0.00-1

.-2 m

...~.- --

PLANT PERFORMANCEINDICATORS l.

JANUARY FEBRUARY MARCH 3.

DERATED GENERATION (HOURS)

s. FORCED' UNIT 1 MONTHLY 21.92 3.88 UNIT 1 YTD -

21.92 25.80 j

UNIT 2 MONTHLY 28.70 0

UNIT 2 YTD 28.70 28.70 b.- MAINTENANCE i

- UNIT 1 MONTHLY 183.85 505.75 UNIT 1 YTD 183.85 889.40 UNIT 2 MONTHLY 15.50 0.00 UNIT 2 YTD 15.50 15.50

c. PLANNED UNIT 1 MONTHLY 21.87 277.52 UNIT 1 YTD 21.87 299.38 UNIT 2 i..MLY 45.83 0.00 UNIT 2 YTD 45.83 45.83 4

DERATED GENERATION (MWH)

a. FORCED UNIT 1 MONTHLY 13841.08 1218.75 UNIT 1 YTD 13841.08 15059.83 UNIT 2 MONTHLY 727.43 0.00 UNIT 2 YTD 727.43 727.43
b. MAINTENANCE UNIT 1 MONTHLY 10733.00 19271.25 UNIT 1 YTD 10733.00 30004.25 UNIT 2 MONTHLY 10475.83 0.00 UNIT 2 YTD 10475.83 10475.83
c. PLANNED '

UNIT 1 MONTHLY 8079.80 18200 UNIT 1 YTD 8079.80 28279.80 UNIT 2 MONTHLY 9.0155.83 0.00 UNIT 2 YTD 10155.83 10155.83

PLANT PERFORMANCE INDICATORS '

JANUARY FEBRUARY MARCl 5.

EQUIVALENT DERATED GENERATION (HRS).

a. FORCED UNIT 1 MONTHLY 12.83 1.13 UNIT 1 YTD 12.83 13.96 -'

UNIT 2 MONTHLY 0.66 0.00 UNIT 2 YTD 0.66 0.66

b. MAINTENANCE UN!T 1 MONTHLY 9.95 17.86 UNIT 1 YTD 9.96 27.81 UNIT 2 MONTHLY 9.44 0.00 UNIT 2 YTD 9.44 9.44
c. PLANNED UNIT 1 MONTHLY 7.49 16.87 UNIT 1 YTD 7.49 24.36 UNIT 2 MONTHLY 9.15 0.00 1

l UNIT 2 YTD 9.15 9.15 6.

GROSS MAXIMUM CAPACITY (MWe) i l

UNIT 1 1162 1162 1

UNIT 2 1179 1179 l

7.

GROSS DEPENDABLE CAPACITY (MWe)

UNIT 1 1160 1109 UNIT 2 1178 1177 8.

PLANNED ENERGY LOSS (MWh)

UNIT 1 MONTHLY 0.00 131562.5 UNIT 1 YTD 0.00 131562.5 i

4 i

UNIT 2 MONTHLY 0.0 0.0 UNIT 2 YTD 0.0 0.0 PLANT MONTHLY 0.0 131562.5 PLANTYTD 0.00 131562.5 i

d PLANT PERFORMANCEINDICATORS JANUARY FEBRUARY MARCHj j

9.

UNIT CAPABILITY FACTOR (%)

UNIT 1 MONTHLY 92.75 78.57 UNIT 1 YTD 86.02 78.57 4

UNIT 2 MONTHLY 97.41 100.00 UNIT 2 YTD 98.64 100.00 PLANT MONTHLY 96.11 89.44 i

PLANTYTD 92.42 89.44 i

l 10.

UNPL/.NNED ENERGY LOSS (MWH) l UNIT 1 MONTHLY 58226.2 23802.5 i

UNIT 1 YTD 58226.2 82028.7 1

UNIT 2 MONTHLY 21359.1 0.0.

{

UNIT 2 YTD 21359.1 21359.1 i

PLANT MONTHLY 79585.3 23802.5 i*

PLANTYTD 79685.3 103387.8 1

11.

UNPLANNED CAPABill1Y LOSS FACTOR (%)

UNIT 1 MONTHLY 7.25 3.28 i

UNIT 1 YTD 7.25 5.37 UNIT 2 MONTHLY 2.59 0.00 l

UNIT 2 YTD 2.59 1.36 i

PLANT MONTHLY 4.89 1.62 l

PLANT YTD 4.89 3.34

~

12.

REFERENCE ENERGY GENERATION i

UNIT 1 MONTHLY 802776.0 725088.0

[

UNIT 1 YTD 802776.0 1527864.0 UNIT 2 MONTHLY 825840.0 745920.0 i

i UNIT 2 YTD 825840.0 1571760.0 I-PLANT MONTHLY 1628616.0 1471008.0 1

PLANT YTD 1628616.0 3090624.0 l

3 4

i e

q e

PLANT PERFORMANCE INDICATORS.

JANUARY

FEBRUARY, MARCH l 13.

REACTORTHERMAL ENERGY GENERATED (BTU)

UNIT 1 MONTHLY 8.102E+12 6.182E+12 i

j.

UNIT 1 YTD 8.102E+12 1.428E+13 l

UNIT 2 MONTHLY 8.544E+12 7.815E+12 i

1 UNIT 2 YTD 8.544E+12 1.636E+13

.14.

HEAT RATE i

BEST DAY DATA j

a. ACTUAL GROSS HEAT RATE (BTUAONH) j UNIT 1 10028 10526 UNIT 2 9879 9870 4

I

b. ACTUAL THERMAL GENERATION (MWt)

UNIT 1 -

81828 81780 f

UNIT 2 81821 81789

c. ACTUAL ELECTRICALGENERATION(MWe)

I

}

UNIT 1..

27850 28610 i

l UNIT 2 28267 28283

d. CIRCULATING WATER TEMPERATURE (DEG-F)

-d p..

l~

UNIT 1 69.9 70.2 i

UNIT 2 66.1 63.0 1

{

e. ADJUSTMENTTO ACTUALGHR(MWe)

UNIT 1 MONTHLY

-0.46

-0.17 UNIT 2 MONTHLY 1.48 0.63

f. POWER LEVEL AT WHICH ACTUAL HR j

WAS DETERMINED (%)

UNIT 1 99.97 99.94 UNIT 2 99.79

.100.00

9. DATE OF BEST DAY DATA -

UNIT 1 01/02/90 02/05/90 UNIT 2 01/28/90 02/28/90 ADJUSTED GROSS HEAT RATE (BTU /KWH)

UNIT 1 10031.9 10527.7

]

' UNIT 2 9888.8 9864.5

PLANT PERFORMANCE INDICATORS JANUARY FEBRUARY MARCF 15.

AUTOMATIC REACTOR TRIPS

a. TOTAL AUTOMATIC REACTOR TRIPS UNIT 1 MONTHLY 1

0 i

UNIT 1 YTD 1

1 UNIT 1 CUMULATIVE 20 20 UNIT 2 MONTHLY 0

0 UNIT 2 YTD 0

0 UNIT 2 CUMULATIVE 4

4-

b. AUTOMATIC REACTOR TRIPS /

i-1000 CRITICAL HRS.

UNIT 1 0.9991 0.9725 UNIT 2 0.6716 0.6035

c. AUTOMA11C REACTOR TRIPSf

]

7000 CRITICAL HRS.

UNIT 1 6.9938 6.8075 UNIT 2 4.7015 4.2248 16.

MANUAL REACTOR TRIPS UNIT 1 MONTHLY 0

1 UNIT 1 YTD 0

1 UNIT 2 MONTHLY 0

0 UNIT 2 YTD 0

0 j

17.

UNPLANNED SAFETY SYSTEM ACTUATIONS a EMERGENCY CORE COOLif'3 SYSTEMS UNIT 1 MONTHLY 0

0 e

I UNIT 1 YTD 0

0

)

UNIT 2 MONTHLY 0

0 UNIT 2 YTD 0

0

b. EMERGENCY POWER

. UNIT 1 MONTHLY 0

0 1

UNIT 1 YTD 0

0 UNfT 2 MONTHLY 0

0 UNIT 2 YTD 0

0

_.~

'l PLANT PERFORMANCE INDICATORS -

{

JANUARY FEBRUARY l

18.

SAFETY SYSTEM UNAVAILA81UTY

a. HIGH PRESSURE INJECTION SYSTEM l

(RHR SI CCP)

UNIT 1 PLANNED HOURS OOS 3.22 52.37 r

UNIT 1 UNPLANNED HOURS OOS 0.00 0.00

. UNIT 1 ESTIMATED HOURS OOS 0.00 0.00 i

UNIT 1 TOTAL HOURS OOS 3.22

- 52.37 UNIT 1 SSPI MONTHLY 0.0011 0.0239 UNIT 1 SSP 1 YTD ~

0.0011 0.0100 UNIT 2 PLANNED HOURS OOS 0.62 0.00 UNIT 2 UNPLANNED HOURS OOS 0.00 0.00 i

UNIT 2 ESTIMATED HOURS OOS 0.00 0.00 UNIT 2 TOTAL HOURS OOS 0.62 0.00 UNIT 2 SSPI MONTHLY 0.0002 0.0000 UNIT 2 SSPl YTD 0.0002 0.0001

b. AUXILIARY FEEDWATER SYSTEM UNIT 1 PLANNED HOURS OOS 2.72 6.30 UNIT 1 UNPLANNED HOURS OOS 0.00 25.55 i

UNIT 1 ESTIMATED HOURS OOS 0.00 0.00 UNIT 1 TOTAL HOURS OOS 2.72 31.85 UNfT 1 SSPl MONTHLY 0.0012 0.0194 1

UNIT 1 SSPI YTD 0.0012.

0.0000 j

UNIT 2 PL ANNED HOURS OOS 1.12 1.02 UNIT 2 UNPLANNED HOURS OOS 0.00 0.00 UNIT 2 ESTIMATED HOURS OOS 0.00 0.00 UNIT 2 TOTAL HOURS OOS 1.12 1.02 UNIT 2 SSPI MONTHLY 0.0005 0.0005 UNIT 2 SSPI YTD 0.0005 0.0005 i

i t

PLANT PERFORMANCE INDICATORS JANUARY FEBRUARY MARCl; j

19.

DIESEL GENERATOR RELIABILrrY PLANT SSPIMONTHLY 0.1429 0.0112 PLANT SSP 1YrD 0.1429 0.0004 4

l

a. DIESEL GENERATOR 1 A SSPI FOR MONTHLY 0.0017 0.0019 i

i SSPI FOR YTD 0.0017 0.0018 b

j START DEMANDS 2

5 I'

START FAILURES 0

0 j

LOAD-RUN DEMANDS 2

4 j

j LOAD-RUN FAILURES 0

0 i

i PLANNED HRS OOS 1.30 1.27 l

UNPLANNED KNOWN HRS OOS 0.00 0.00 ESTIMATED HRS OOS 0.00 0.00 i

HOURS OF OPERATION 3.52 44.4 i~

FAILURE DATES N/A N/A I

b. DIESEL GENERATOR 1B i

SSPI FOR MONTHLY 0.0229 0.0006 SSPI FOR YTD 0.0229 0.0123 i

START DEMANDS 4

5 i

START FAILURES 0

0

{

LOAD-RUN DEMANDS 3

4 LOAD-RUN FAILURES 1

0 PLANNED HRS OOS 0.40 0.38 UNPLANNED KNOWN HOURS DOS 16.63 0.00 i

ESTIMATED HOURS OOS 0.00 0.00

. HOURS OF OPERATION 4.66 35.74

..)

FAILURE DATES 1/3/90 N/A f

c. DIESEL GENERATOR 2A SSPI FOR MONTHLY 0.5110 0.0375 SSPI FOR YTD 0.5110 0.2863

PLANT PERFORMANCE INDICATORS JANUARY FEBRUARY MARCv 19.

c. DIESEL GENERATOR 2A (CONT.)

START DEMANDS 7

8 START FAILURES 2

0 LOAD-RUN DEMANDS 3

5 d

LOAD-RUN FAILURES 0

1 PLANNED HOURS DOS 1.92 24.80 UNPLANNED KNOWN HOURS OOS 24.90 0.37 ESTIMATED HOURS OOS 353.35 0.00 l

HOURS OF OPERATION 6.02 9.06 FAILURE DATES 1/24/90 2/1/90 1/25/90

d. DIESEL GENERATOR 2B SSPI FOR MONTHLY 0.0359 0.0047 SSPI FOR YTD 0.0359 0.0211 START DEMANDS 4

2 START FAILURES 0

0 LOAD-RUN DEMANDS 3

2 LOAD-RUN FAILURES 0

0 PLANNED HOURS DOS 3.33 3.18 UNPLANNED KNOWN HOURS OOS 23.35 0.00 ESTIMATED HOURS OOS 0.00 0.00 HOURS OF OPERATION 6.54 4.19 FAILURE DATES N/A N/A B. ENGINEERING 1.

ACTIVE DESIGN CHANGE REOUESTS UNIT 1 MONTHLY 220 223 UNIT 1 YTD AVG.

220 222 UNIT 2 MONTHLY 52 58 i

i UNIT 2 YTD AVG.

52 55 l

2.

OUTSTANDING AS-BUILTNOTICES CRITICAL 29 21 NON-CRITICAL 1264 1359

7 ___

PLANT PERFORMANCE INDICATORS l

l

'4 JANUARY FEBRUARY

' MARCH ;

C. MAINTENANCE l

1.

CORRECTIVE MWO'S COMPLETED i.

UNrf 1 MONTHLY 224 149

. UNIT 1 YTD 224-373 UNITf MONTHLY 138 89 s

+

UNIT 2 YTD 138 227

. PLANT 382 238 t

PLANTYTD 382 800 -

TOTAL MANHOURS -

2213.5 2033.5 TOTAL MANHOURS YTD 2213.5 4247 i

2.

OUTAGEWORK COMPLETED i

UNIT 1 4

89 UNIT 1 YTD 4

93 f

UNIT 2 10 1

UNIT 2 YTD 10 11 PLANT 14 90 1

PLANTYTD 14 104 TOTAL MANHOURS MONTHLY 131.0 679.0 TOTAL MANHOURS YTD 131.0 J10.0 3.

NON-OUTAGE CORRECTIVE MWO'S OUTSTANDING UNIT 1 510 521

.l UNIT 2 325 324 j

PLANT 835 845 4.

- OUTAGE CORRECTIVE MWO'S OUTSTANDING UNIT 1 818 667 UNIT 2 250 250 PLANT 888 928

PLANT PERFORMANCE INDICATORS JANUARY FEBRUARY MARCF 5.

CORRECTIVE MWO'S OUTSTANDING r

LESS THAN THREE MONTHS OLD UNIT 1 NOT REQUIRED NOT REQUIRED UNIT 2 NOT REQUIRED NOT REQUIRED PLANT NOT REQUIRED NOT REQUIRED -

6.

SCHEDULED PREDICTIVE MAINT. TASKS CouPtETED UNIT 1 MONTHLY 70

'37

[

UNIT 1 YTD 70 107 UNIT 2 MONTHLY 40 34 j

UNIT 2 YTD.

40 74 PLANT MONTHLY 110 71 l

PLANTYTD 110 181 I

TOTAL MANHOURS MONTHLY 410.0 480.0 TOTAL MANHOURS YTD 410.0 890.0

}

I 7

PREDICTIVE MAINT. TASKS NOT COMPLETED WITHIN ALLOWABLEINTERVAL UNIT 1 MONTHLY 35 39 i

UNIT 1 OUARTERLY 35 74 i

I UNIT 2 MONTHLY 35 42 UNIT 2 OUARTERLY 35 77 PLANT MONTHLY 70 81 i

I PLANT OUARTERLY 70 151

)

t 8.

UNSCHEDULED PREDICTIVE MAINTENANCE COMPLETED (MANHOURS) i

)

PLANT MONTHLY 120.0 120.0 i

i PLANT YTD 120.0 240.0 1

9.

PERIODIC MWO'S COMPLETED l

4 UNIT 1 MONTHLY 95 79 i

UNIT 1 YTD 95 174 UNIT 2 MONTHLY 37 44

{

f 4

UNIT 2 YTD '

37 81 PLANT MONTHLY 132 123 PLANT YTD 132 255 1

4 l

I i

TOTAL MANHOURS MONTHLY 700.0 819.7 l

TOTAL MANHOURS YTD 709.0 1528.7 J

PLANT PERFORMANCE INDICATORS JANUARY FEBRUARY MARCH 10.

PERIODIC MWO'S NOT COMPLETED WITHIN ALLOWABLEINTERVAL UNIT 1 MONTHLY 0.

1 UNIT 1 QUARTERLY 0

1 UNIT 2 MONTHLY 0

0 UNIT 2 OUARTERLY 0

0 PLANT MONTHLY 0

1 PLANT QUARTERLY 0

1 I

11.

PLANNED MAINTENANCE COMPLETED MANHOURS PLANT MONTHLY 847.0 1469.5 PLANT YTD 847.0 2316.5 12.

MWO'S ON-HOLD FOR SPARE PARTS UNIT 1 MONTHLY 79 56 UNIT 1 YTD AVG.

79 68 UNTT 2 MONTHLY 30 26 l

i UNIT 2 YTD AVG.

30 28 PLANT MONTHLY 109 82 PLANTYTD AVG.

109 96 13.

TECH SPEC SURVEILLANCES COMPLETED UNIT 1 MONTHLY 439 399 UNIT 1 YTD 439 838 UNIT 2 MONTHLY 311 253 UNIT 2 YTD 311 564 PLANT MONTHLY 750 963 PLANT YTD 750 1713 a

TOTAL MANHOURS MONTHLY 6896.2 3478.8 TOTAL MANHOURS YTD 6896.2 10374.9 14.

CONTROL ROOM INSTRUMENTS OUT OF SERVICE UNIT 1 MONTHLY 38 34 UNIT 2 MONTHLY 28 28

PLANT PERFORMANCE INDICATORS JANUARY FEBRUARY MARC 1 D.

RADIOLOGICAL SAFETY 1.

PERSONNEL RADIATION EXPOSURE (MANREM)

a. DOSIMETER MONTHLY 1.84 47.717
b. DOSIMETERYTD 1.84 49.56
c. TLD MONTHLY 1.64 NOTAVAIL
d. TLD YTD 1.64 1.64 NOTE: DECEMBER 89 ACTUAL TLD = 0.196 2.

SiON/ CLOTHING CONTAMINATION i.

a. MONTHLY 1

15 l

P b.YTD 1

16 3.

BODY COUNTS > REPORTING LVL 1

a. MON 1HL'/

0 0

I b.YTD 0

0 4

BODY COUNTS > REPORTING LVL 2 l

a. W.JNTHLY 0

0

b. Y D 0

0 5.

EXPOSURE GREATER THAN 5 REM / YEAR

a. UTIUTY PERSONNEL MONTHLY 0

0 YTD 0

0

b. CONTRACTPERSONNEL,

MONTHLY 0

0 YTD 0

0 6.

SOLIDS SHIPPED (CU-M) a DRY ACTIVEWASTE 10.45 0.00

b. RESIN, SLUDGE. BOTTOMS & OTHERS 5.72 3.75
c. TOTAL RADIOACTIVE WASTE MONTHLY 16.17 3.75 i
d. TOTAL RADIOACTIVE WASTE YTD 16.17 -

19.92 i

4 1

i 1

PLANT PERFORMANCE INDICATORS JANUARY FEBRUARY MARC:'

7.'

SOLIDS GENERATED (CU-M)

a. DRY ACTIVEWASTE 0.00 0.00 1987+1988+1989 = 101.76
b. RESIN. SLUDGE, BOTTOMS & CTHERS 0.00 0.00 1987+1088+1989 - 63.18
c. TOTAL RADIOACTIVE WASTE MONTHLY 0.00 0.00
d. TOTAL RADIDACTiVEWASTEYTD 0.00 0.00 1987+1988+1989 - 164.88 8.

TEMPORARY STORAGE (CU-M)

a. DRY ACTIVEWASTE 0.00 0.00
b. RESIN, SLUDGE, BOTTOMS & OTHERS 0.00 0.00
c. TOTAL RADIOACTIVE WASTE MONTHLY 0.00 0.00
d. TOTAL RADIOACTIVE WASTE YTD 0.00 0.00 9.

FUEL RELIABILITY (MICROCURIES/ML)

a. FUEL RELIABILITY INDICATOR 1.) LODINE - 131 UNIT 1 MONTHLY 2.138E-04 1.893E-04 UNIT 2 MONTHLY 2.222E-04 2.255E-04 2.) IODINE - 134 UNIT 1 MONTHLY 5.012E-03 5.063E-03 UNIT 2 MONTHLY 7.033E-03 7.580E-03 3.) PURIFICATION CONS (SEC-1).

UNIT 1 MONTHLY 1.762E-05 1.762E-05 4

UNIT 2 MONTHLY 1.604E-05 1.583E-05 4.) POWER LEVEL ATWHICH FRI INFORMATION WAS OBTAINED UNIT 1 MONTHLY 100 %

100 %

UNIT 2 MONTHLY 100 %

100 %

b. ESTIMATED NUMBER OF FAILED FUEL RODS (FFR)

UNIT 1 MONWLY 1

1 UNIT 2 MONTHLY 0

0

PLANT PERFORMANCE INDICATORS JANUARY FEBRUARY MARCl

c. MOST RECENT CONFIRMED NUMBER OF FFR ljNE 1 1

1 UNIT 2 0

0

d. DATE LAST POWER OPERATION w/FFR UNIT 1 1/31/90 2/23/90 UNIT 2 N/A N/A
e. TECHNIOUE THATIDENTIFIED FAILURE UNIT 1 5 (I-131A-133 RATIO) 5 (1-131A-133 RATIO)

UNIT 2 N/A N/A

f. CAUSE OF FAILURE UNIT 1 7

7 UNIT 2 N/A N/A

0. FAILED FUEL ROD CYCLE UNIT 1 1

1 UNIT 2 N/A N/A 10.

RADIATION OCCURRENCE REPORTS MC fTHLY 0

0 YTD TOTAL 0

0 E.

CHEMISTRY PARAMETERS 1.

PERFORMANCEINDEX UNIT 1 MONTHLY 0.125 0.138 UNIT 1 YTD AVG.

0.125 0.132 UNIT 2 MONTHLY 0.176 0.145 UNIT 2 YTD AVG.

0.176 0.161 2.

% OFTIME AUX COOLING OUTOF SPEC UNIT 1 MONTHLY 0.50 %

0.00 %

UNIT 1 YTD AVG.

0.50 %

0.25 %

UNIT 2 MONTHLY 0.00 %

0.00 %

UNIT 2 YTD AVG.

0.00 %

0.00 %

, PLANTPERFORMANCEINDICATORS JANUARY FEBRUARY MARC; 3.

CONDENSATE PUMP DISCHARGE

+

DISSOLVED OXYGEN (PPS)

UNTT 1 MONTHLY 2.00 2.50 UNIT 1 YTD AVG.

2.00 2.55 UNIT 2 MONTHLY 2.90 2.80 UNIT 2 YTD AVG.

2.90 2.75 i

4.

CONDENSER AIR IN-LEAKAGE (SCFM)

UNIT 1 MONTHLY 32.00 31.00 UNIT 1 YTD AVG.

32.00 31.00 i

UNIT 2 MONTHLY 19.00 17.00 UNTT 2 YTD AVG.

19.00 18.00 r

5.

STEAM GENERATOR BLOWDOWN CATION CONDUCTIVITY (MICRO S/CM)

UNIT 1 MONTHLY 0.135 0.165 UNIT 1 YTD AVG.

0.135 0.150 UNIT 2 MONTHLY 0.253 0.216 UNIT 2 YTD AVG.

0.253 0.235 l

6.

STEAM GENERATOR CHLORIDE (ppb)

UNIT 1 MONTHLY 1.30 1.30 UNIT 1 YTD AVG.

1.30 1.30 I

UNIT 2 MONTHLY 1.60 1.90 UNIT 2 YTD AVG.

1.60 1.75 4

7.'

STEAM GENERATOR SULFATE (ppb)

UNIT 1 MONTHLY 1.70 1.50 UNIT 1 YTD AVG.

1.70 1.60

[

UNIT 2 MONTHLY 1.90 1.50 i

UNrT 2 YTD AVG.

1.90 1.70 8.

STEAM GENERATOR SODIUM (ppb)

UNIT 1 MONTHLY 0.90 1.30 UNIT 1 YTD AVG.

0.90 1.10 UNIT 2 MONTHLY 2.00 0.90 i

UNIT 2 YTD AVG.

2.00 1.45

. _ _ _ _ _ _ _ _ _ _ j

~

PLANT PERFORMANCE INDICATORS J

1

' JANUARY FEBRUARY MARCI F.

ADMINISTRATIVE PARAMETERS i

1.

NRC VIOLATIONS i

a.LEVELI O

O

b. LEVEL 11 0

0 l

j

c. LEVELlil 0

0-

\\

d. LEVELIV 1

2

e. LEVELV 0

0

f. TOTAL VIOLATIONS MONTHLY 1

2

g. TOTAL VIOLATIONS OPEN 49 45 3
2. '

UCENSEE EVENT REPORTS

a. PERSONNELERRORS 1

UNIT 1 1

0 UNIT 2 0

0

b. DESIGN ERRORS i

4 UNIT 1 0

0 UNIT 2 0

0

c. EXTERNAL CAUSES UNIT 1 0

0 UNIT 2 0

0

d. DEFECTIVE PROCEDURES UNIT 1 0

1 UNIT 2 0

0

e. MANAGEMENT /QA DEFICIENCY

)

UNIT 1 0

0 UNIT 2 0

0

f. OTHER UNIT 1 0

0 UNIT 2 0

0 g.. TOTAL LER'S UNT1 1

1 UNIT 2 0

0

=

...... -. ~ - -.... -

1 PLANT PERFORMANCEINDICATORS

.p JANUARY.

FEBRUARY

-MARCt

. 3.

SAFETY LOSTTIME ACCIDENTS

)

4

a. MONTHLY 0

0-I b.YTD, O.

0-j WORK RELATED FATALITIES I

i i

a MONTHLY 0

0 l

4 i

b.tTD 0

0 RESTRICTEDWOFe( ACCIDENTS

s. MONTHLY-0 0

s b.YTD 0

0

- TOTAL MANHOURS WORKED.'

f

a. UNIT 1 ST i

i MONTHLY 43551.75 51679.00 YTD 43551.75 95230.75

)

f

b. UNIT 1 OT MONTHLY 3399.25 8837.00 YTD 3399.25 12296.25 i

i-

c. UNIT 2 ST MONTHLY 20044.25 27702.00 Y1D 20044.25 47746.25
d. UNIT 2 OT i

MONTHLY 2150.75 2184.00

.YTD 2150.75 4334.75

e. GENERAL ST MONTHLY -

102808.00 94233.00 YTD' 102698.00 198031.00 y

f. GENERAL OT MONTHLY 5800.50 8362.00

.YTD 5800.50 14242.50 i

f

c-_.

PLANT PERFORMANCE INDlCATORS JANUARY FEBRUARY MARCI' 4.

MEDICAL ATTENTIONS MEDICAL ATTENTIONS MONTHLY 1

1 MEDICAL ATTENTIONS YTD 1

2 5.

ABSENTEBSM I

a. SICK HOURS SICK HRS / PERSON MONTHLY 2.84 2.3 SICK HRS / PERSON YTD AVG 2.84 2.58
b. PERSONAL HOURS PERSONAL HOURS MONTHLY 1.67 1.09 PERSONAL HRS / PERSON YTD AVG.

1.67 1.38 l

2 l

l i

i I

i' a

i i

l l

$,*ioj,e$*Cs$

GPC EXHIBIT -

waynetooro. Georgia 30s30 ALEDENKAMPE R Telephone 404 724 8114 404 554 9961 Georgia Power 1 e m.tv, e r u.ve--

i DATE:

January 11, 1990-

,e

~

RE:

VNS-AP-19 Perfonnance Monitoring Log: NOTS-00252.

FROM:

G. Bockhold, Jr.

2

.TO:

C. K. McCoy-

'The attached tabulation is in response to your request for performance data input from VEGP for the month of December, 1989.

If you have any questions, please contact J. C. Williams at extension 4279.

[M h d5 CW/GB/chd Attachment xc:

W. F. Kitchens W. L. Burmeister J. C. Williams M. D. Barker i

C. C. Tynan N. O. Superintendents N. O. Managers NORMS i

g a

w

6 e

a PIANT P15GGMhNCE INDICMCEE

. AVI!VYTD Oct-89 Nov-89 Dec-89 A.OPERATICNS 1.

AD7USTED NIIT ll22CTRICAL 12GIR3Y (1981)

UNIT 1 8,726,069

'681,140 768,940 822,960 UNIT 2 5,561,283 659,096 762,869 766,136 2.

EQUIVAIJINF AVAIIABILTIT FACItR (%)

UNIT 1 M2fDILY NA 83.87 98.33 100.00 UNIT 1 YEAR'IO-DME NA 90.51 91.21 91.96 UNIT 1 ROEING AVERAGE NA 82.58 90.56 91.96 (12 M2fDI)

UNIT 2 M2fDILY NA 79.72 95.92 91.59 UNIT 2 YEAR 'IO-DME NA 92.53 93.05 92.85 UNIT 2 '30EDC AVERAGE NA 92.53 93.05 92.85 PIANT M2fDILY NA 81.80 97.13 95.80 PIANT YEAR-40-DME NA 91.22 91.89 92.30 PIANT ROLUNG AVERAGE NA 85.68 91.43 92.30 e

3.

EQUIVAUNT FtECED 00DGE FACIIR (%)

UNIT 1 M2fDILY NA 14.06 0.00 0.00 l

UNIT 1 YEAR 'IO-DA2E NA 6.62 6.02 5.51 I

UNIT 1 ICLUNG AVERAGE NA 6.53 6.52 5.51 i

(12 M2fDI)

UNIT 2 M2fIHLY NA 3.16 2.50 7.44 l

UNIT 2 YTO-GO-DME NA 2.34 2.36 3.06 UNIT 210EDG AVERAGE NA 2.34 2.36 3.06 PIANT M2fDILY NA 8.61 1.25 3.72 PIANT YEAR 'IO-DME NA 5.11 4.67 4.57 e

PIANT ROEDU AVI! RAGE NA 5.22 5.07 4.57 i

i l

L r

e '

?

PIANT PERPGOOMCL INDICk1MS i

i AVI!/ YID Oct-89 Nov-89 Dec-89 4.

REACER GITICAL (IGRS)

INIT 1 lefDEX 8412.98 658.05 720.00 744.00 l

IMIT 2 PENDEX 5211.61 629.52 708.10 721.70 5.

GENERMGt W-IZNE ()tXES)

~

l' IMIT 1 PCtfDEX 8277.17 640.24 720.00-744.00 UNIT 2')E3f2HLY 5106.24 609.65 702.00 688.60 l

6. - UNhVAIIABIE GENERATICE - (HRS) a.

FCECED CUIME IMIT 1 PENDEX 482.83 104.76 0.00 0.00 atLT 2 )E2fDEX 165.94 23.57 17.98 55.37 l 1

b.

NN UNIT 1 DEIfDEX 0.00 0.00 0.00 0.00 IMIT 2 PCIf!HIX 0.00 0.00 0.00 0.00 c.

PIANNED CC7MGE (BASIC)

LEIT 1 PCIMEX 0.00 0.00 0.00 0.00 UNIT 2 PE2fDEX 141.54 100.55 0.00 0.00 d.

PIANNED OUDGE (EXH!NIED)

UNIT 1 PCIf!HIX 0.00 0.00 0.00 0.00 IMIT 2 BCtfDEX 11.23 11.23 0.00 0.00

'7.

EMIRATED GENERATICE (IGRS)

. a.- nacED 1

l UNIT 13CIfDE2 938.44 0.00 45.10 0.00!

IMIT 2 PCIfDEX 168.06-0.00 2.57 0.00 9

i PIANT PEMUSEN3 INDICA 20RS AVE / YID Oct-89 Nov-89 Dec-89 l

~

b.

MAINIDENCE j

IN1T 1 M2f!HIX 0.00 0.00 0.00 0.00 UNIT 2 M2f!HLY 88.37' O.00 88.37 0.00 c.

PIANNED INIT 1 M2 m EX 160.02 52.24 19.93 0.00 INIT 2 PONIHLY 97.73 38.88 39.40 19.45 8.

DERATED GENERATION (M61) a.

EmCED INIT 1 PCNIHIX 196,578.76 0.00 10,642.36 0.00 INIT 2 M2 m EX 37,863.11 0.00 107.45 0.00 b.

MAINTENANCE UNIT 1 M2m!IX 0.00 0.00 0.00 0.00 INIT 2 M2mHX 2,819.44 0.00 2,819.44 0.00 c.

PIANNED INIT 1 M2 m HX 44,953.92 16,618.10 2,391.80 0.00 UNIT 2 PCNIHIX 34,244.38 17,086.10 9,429.70 7,728.58 9.

EQU1VAI2NT IERATED GENERATICE (100RS) a.

EmCED UNIT 1 M2m EX 179.84 0.00 9.83 0.00 INIT 2 M2 m HX 34.96 0.00 0.10 0.00 b.

MAINIDEN3 UNIT 1 PCNIMIX 0.00 0.00 0.00 0.00 INET 2 M2mEX 2.60 0.00 2.60 0.00

4 PIANT Pl!RPGMANCE INDICA 2WS AVI!/ YID Oct-89 Nov-89 Dec-89 c.

PIAltG!D hours UNIT 1 )C3f!HLY 41.51 15.34 2.21 0.00 IBi1T 2 M3fDILY 31.63 15.78 8.71 7.14

10. REAClut ' DIE 3MhL DGIRN GENERATED (B1U)

UNIT 1 M2fDILY 9.41E+13 7.31E+12 8.16E+12 6.65E+12 UNIT 2 PCtfDILY 5.87E+13 6.94E+12 8.02E+12 7.97E+12

- 11. REACIUR 'DIEIMAL ENERGY GDERATED (mig {}

UNIT 1 PEIfDILY 27,557,754.0 2,142,954.0 2,391,716.0 2,535,607.00 IIf1T 2 PEtfDILY 17,207,113.0 2,034,639.0 2,350,213.0 2,335,572.00

12. GIESS ELECIRICAL GENERATICE (196!)

l-UNIT 1 IENDILY 9,161,520.0 714,730 805,480 860,950 UNIT 2 PEIfIHLY 5,813,966.0 689,256 798,539 801,186 l

13. STATICH SERVICE (19M) i l-UNIT 1 )DfIHLY 450,910 38,640 36,540 36,760 UNIT 2 )CtfDILY 265,590 35,770 36,480 36,440
14. OPERATICHAL HEAT RAIE (BIU/NGI)

GnoSS IIEAT RAM UNIT 1 NA 10232.5 10,134.2 10047.0 12 PCtf!H R3 LUNG AVERAGE NA 10163.2 10,160.8 10163.7 UNIT 2 NA 10074.0 10,044.9 9947.8 ICLUNG AVERAGE NA 10066.6 10,063.5 10,049.00 i

15. AU109EIC REACIGt 'IRIPS i'

IRi1T 1 PCIfDILY 2.

1.

0 0

j IMIT 2 )DfDILY 4-1.

0 1'

i i

i i

PIANP P5trG00@lCE INDICn2tES AVF/ YID Oct-89 Nov-89 Dec-89

16. UNPIJORED MnNunL REnCP3t TRIPS INIT 1 DE3f!HLY 3

0 0

0, UNIT 2 )ENDILY 1

0 1

-0

17. UNPIANNED SAFEIT STJHIM ACIUnTICRIS

.(Del 3GENCY CIItB CDOLING SYSIDES)

UNIT 1.

0 0

0 0

INIT 2 0

0 0

0

'18. UNPIANNED SAFEIY SYSTEM ACIUATIC2iS

(!!NERGENCY ICHER) j UNIT 1 0

0 0.

0 1 1REIT 2 2

1 0

0

.19. SAP 112T SYSTEM UNhVAIIABILITY EST/ ENOW ICURS CUIMF-SIIRVIG

a. HIGI PRESSURE I2UECTICH SYSTEM (RHR,SI,CCP) l UNIT 1 (ICURS)/PIANNED 166.89 43.43 0.10 33.93 l (ICURS)/UNPIANNED O.00 0.00 0.00 0.0 UNIT 1 (SSPI) 0.0050 0.0165 0.00 0.0114 ]

r i

UNIT 2 (ICURS)/PIANNED 24.32 1.66 6.07 3.17 ;

(ICURS)/UIEANNED 0.00 0.00 0.C60 0.0 1 UNIT 2 (SSPI) 0.0012 0.0007 0.0021 0.0011 '

i

b. AUXILIARY FEED 02ER SYSTEM l

UNIT 1 (ICURS)/PIANNED 147.24 0.00 28.40 4.44 (ICURS)/UNPIANNED 102.38 0.00 0.00 0.0 l

UNIT 1 (SSPI) 0.0099 0.0000 0.0131 0.0020 UNIT 2 (IOURS)/PIANNIID 9.17 0.43 0.80 1,81 (IE15tS)/UNPIANNIiD 9.04 9.04

-0.00 0.01

l UNIT 2 (SSPI).

0.0012 0.0050 0.0004 0.0008 i i

20. CCRfDCL BOCM INSHUEINIS OUT OF SERVICE

[

UNIT 1 33 36 38 48 4 i

IMIT 2 27' 28 29 41

~..

+,

PIANT PERIGMhNCE INDICA 2t3S AVEnf!D Oct-89 New-89 Dec-89 ;

G. ENGINEERING 1

l 1.

AGIVE IESIGN QinNGE REQUESTS (EACH)

(AM)

UNIT 1 234 249 255 206 ;

UNIT 2 42 55 63 44

2.. CLf!SBNDING AS-RJILT NOTIGS (AW)

UNIT 1 800.

1075 1125 1140 UNIT 2 87 112 122 117 3.

NPRDS FAIIDRE REPCRTS i

UNIT 1 107 8

4 6

UNIT 2 32 10 3

0l 4.

IEFICIENCY REPGES UNIT 1 83 6

6 81 l

UNIT 2 85 4-6 1

t C.MAINTINANCE 1.

CCRRECITVE PMD'S CNPIETED UNIT 1 3,596 253 253 220,

UNIT 2 1344 232 144 172

[

PIANT 4,940 485 397 392 3

'IUIAL MANEEURS 51,735.0 4902.0 4453.0 3335.0 !

i 2.

OtJIAGE W:RK CKMPrRT5n s.

UNIT 1 250 48 16 1l i

UNIT 2 110 84 2-5)

PIANT 360 132 18 6

2~

'IDIAL MAIGEXES 4,299 1582 378 29.0' i

3,.

4 k-A 1

---~,e

PIANT PERREMANCE DECA 2GtS AVI!VYID Oct-89 Nov-89 Dec-89 3.

HIGHEST PRIGCIY CCERECTIVE 210'S CI2fPrrryn UNIT 1 3

1 0

0 UNIT 2 1

0 0

0 PIANT 4-1 0

0

'IUML MANEEURS 66 12 0

0 4.

IM-G7DGE CIERECTIVE M40'S CUTSTANDING (AW)

UNIT 1 604 507 441 519 UNIT 2 2087 332 350 365 PIANT 778 839 791 884 5.

CUDGE CCERECTIVE M60'S CUISTANDING (AW)

UNIT 1 356 344 438 511 UNIT 2 1471 171 225 233 PIANT 479 515 663 744 6.

OCERECTIVE Mir)'S OUISDNDDE IZES 'IHAN 'IHREE M2GHS OID (AW)

I

)

UNIT 1 301 298 257 300 f

UNIT 2 1459 232 240 240 PIANT 422 530 497 540 7.

PREVDirIVE & PREDICTIVE M40'S CI2GPIIIED UNIT 1 M2fIHLY 2,079 152 186 132 UNIT 2 M2flHLY 580 67 100 52 PIANP M2GHLY 2,659 219 286 184

'IUIAL MANIEURS 26,872.6 1664.5 2136.0 1118.5 f',

o

O t

PIANT PERPORMANCE INDICA'1WS AVE /1CID Oct-89 Nov-89 Dec-89 8.

PREVENTIVE 210'S NCTI CGIPIEIED WI' DUN AIIDHMEE INIERVAL (AW)

IEIT 1 )ENDEX 15 5

0 1

l IMIT 2 2CNDEX 5

0 1

2 PIANT )ENDHE 16 5

1.

3 9.

!WO'S ON-HOID FtR SPARE PARIS (AW)

INIT 1 )ENDEX 72 59 54 56 INIT 2 PEND!IX 283 39 44 33 PIANT PENDHE 96 98 98 89

10. TECH SPEC SURVEIIIANCES OCMPIEEED INIT 1 PENIfHX 4,089 425 334 378 INIT 2 PENHHX 2,259 328 269 289 PIANT PENDEX 6,348 753 603 667

'IUIAL MANIEURS 32,608.53 6,000.90 4,546.19 4,032.66

11. CNDUCI OF HAINTENANCE a.

NCRMAL HOURS REFER 'Io ATDGMENT 1 b.

OVEREIME IOURS REFER 'IO ATDGMENT 1 c.

RADIATICH EXPOSURE, DOSIMETER (MAN-REM)

REFER 'IO ATDGMENT 2 d.

RADIATICH EXPOSURE, TID (MAN-RIM)

REFER 'Io ATDGMENT 2 e.

IOST TIME N REFER 'IO ITEM E. 4

1

)

PUNY PEMUO9WCE DOICARES AVF/ YID Oct-89 Nov-89 Dec-89

12. DIESEL GENERAER REU[ABH2rf (PUNT SSPI) 0.0052 0.0003 0.0076 0.0175 a.

nTywr GDGRAER 2A (SSPI) KR 2A 0.0058 0.0000 0.0280 0.0009 S'DGtr G!MANDS 21 1

1 1

S' Intr FAIIllRES 0

0 0

0 IDAIH W IEMANDS 18 1

1 1

IDAIMM FAIIURES 0

0 0

0 !

PIANNED HRS CLFIM)F-SERVI 3 49.68 0.00 20.15 0.68 UNPIANNED HRS G7P-OP-SVC.

0.00 0.00 0.00 0.00

}EURS OF OPERATICE 34.91 2.78 1.70 2.05 FAIIURE DA3ES NA NA NA NA i

i b.

DIESEL GENERAER 1B (SSPI) KR 1B 0.0131 0.0000 0.0010 0.0538 S'Dutr GINANDS 19 1

1 1

SINtr FAIIURES 0

0 0

0 i-IDAD-RUN DEMANDS 18 1

1 1

3 l

IDAD-RUN FAIIURES 1

0 0

0 PIANNED HRS G7f-OF-SERVIG 99.82.

0.00 0.70 40.00 UNPIANNED HRS G7P-OF-SVC 35.32 0.00 0.00 0.00 j

ICURS OF OPERATICN 32.30 1.57 2.05 2.22 l

FAIIURE LA3ES NA NA NA NA 1

T\\

3 i

d j

i f

f 4'

PIANT PERPCROMCE INDICA 2tES i.

AVF/YTD Oct-89 Nov-89 Dec-89 r c.

nTyner. GENERA 2tR 2A (SSPI) PGt 2A 0.0015 0.0022 0.0014 0.0026 STME MMANCE 11 2

2 1

STME FAIIURES 0

0 0

0.

IQhD-RN EEMANDS 10 1.

2 1

IOh!>MM FAIIIIRES O

O O

0 1

PIANNED HRS 0[7P OF-SERVI 3 12.73 1.63 1.00 1.93

]

UNPIANNED HRS OlJP-OF-SVC.

0.00 0.00 0.00 0.00 IEURS OF OPERATION 25.65 2.58 4.57 2.00 FAIIURE Dh2EE NA NA NA NA ;

d.

DIESEL GENERA 2Gt 2B (SSPI) FtR 2B 0.0019 0.0010 0.0015 0.0153 l SDGE MMANDS 10 1

1 2

I SDGE FAIIURES 0

0 0

C IDAD-RN N20MIE 9

1 1

1 IDM>RN FAIIURES 0

0 0

C PIANNED HRS CCTP-OF-SERVIG 6.95 0.77 1.05 1.80 l UNPIANNED HRS ONF-SVC 9.62-0.00 0.00 9.62 ICURS OF OPERATICN 16.59 2.25 1.93 2.23,

FAIIURE DATES NA NA NA lO I D.RADIOIDGICAL SAFEIY 1.

PERSCNNEL RADIATICE EXECSURE (MhNREM) a.

DOSIME3ER 39.524 7.785 1.925 1.05 b.

TID (PREVIOUS PENIH) 30.811 3.479 6.653 1.34:

2.

SKIN /CIDIHING CINEhMINATICH 72 11 5

3l 3.

BotN CCIMIS > REP 3EING LVL 1 0

0 0

C 4.

BODY CDLMIS > REEGEING LVL 2 0

0 0

C

. =.. _ _

i i

PIANT PERPGW9WCE INDICATCES i

AVE / YID LOct-89 Nov-89 Dec-89

^

1

{

5.

SOLIDS SHIPPED (C1J-M) **

TUIhL a.

IRY ACTIVE WASIE 70.04 18.31 4.88 0.45 b.

RESIN, SIDDGE & BUFICMS 30.17 9.47 0.00 0.00 c.

OIL AND O!HER 0.00 0.00 0.00 0.00 d.

FII2ERS 0.00 0.00 0.00 0.00 e.

TOIhL RADIQAcr1VE WhSTE 100.21 27.78 4.88 0.45 SOLIDS GENERATED (CU-M) **

'IUIAL a.

IRY Acr1VE WhSTE 101.70 18.31 4.88 0.45 3-1987+1988 = 78.06 i

b.

RESIN, SIUDGE & BorICMS 55.79 5.72 0.00 0.00.

1987+1988 = 36.92 c.

OIL AND OIHER 0.00 0.00 0.00 0.00 i-1987+1988 = 0.00 i

d.

FILTERS 7.39 0.00 0.00 0.00 4

1987+1988 = 7.39 e.

'IUIAL RADIQhCTIVE WhSIE 164.88 24.03 4.88 0.45 1987+1988 =122.37 l

TMPORARY SICRAGE (CU-M) **

TUIAL a.

[RY ACTIVE WASIE 47.00 0.00 0.00 0.00 '

![

b.

RESIN, SIUDGE & BOFICMS 25.73 0.00 0.00 0.00 c.

OIL AND OIHER 0.00 0.00 0.00 0.00 l d.

FILTERS 7.22 0.00 0.00 0.00.

e.

TothL RADIOACTIVE WhSTE 79.95 0.00 0.00 0.00 PER PCNIH 6.

GASES REIEASED (CURIES)

UNIT l' }CHIHIX 199.68 17.44 14.50 15.27,

UNIT 2 BCNIHIX 75.16 15.65 3.68 27.22

7. - LIQUID WASIE DISCHARGED (WRIES)

INIT 1 Inf!HIX 2.64E-01 3.63E-02 3.53E-02 1.28E-02 IMIT 2 ICNIHIX 5.03E-02 1.93E-02 7.56E-03 1.63E-02

~

Prmr mummNcE nanaams AVI!VYID Oct-89 Nov-89 Dec-89 8.

FUEL RELTABILITY (MEQCC1] RIES /ML)

(AVERAGE) '

a.

ICEXINE - 131 IBIIT 1 1.7 2-04 1.9E-04 1.9 E-04 1.97E-04 IREIT 2 1.85E-04 2.48E-04 2.08E-04 2.11E-04 b.

IODINE - 134 IRi1T 1 4.11E-03 4.79E-03 4.34E-03 4.50E-03 tai 1T 2 5.16E-03 6.52E-43 6.35E-03 6.74E-03

c. RRIFICATICN CK2iS. (SEC-1).

tRET 1 1.77E-05 1.7 E-05 1.76E-05 1.76E-05 IEET 2 1.54E-05 1.52-05 1.59E-05 1.61E-05 9.

OEMLTIRE PARAME3ERS a.

PEREMMANCE INGDC (AVERAGE) tRET 1 0.18 0.17 0.22 0.11 i IMIT 2 0.23 0.21 0.18 0.15l b.

AUX COOLING CUP OF SPEC (AVERAGE) i i

l IMIT 1 1.98 0.00 0.80 0.80 t

IRET 2 2.27 1.40 3.50 0.00 ;

c.

OttitENSA2E REP DISQRRGE DISSOLVED 000fGEN (PPB)

(AVERAGE)

I j

1 RET 1 4.53 4.10 6.30 2.20 l

IRET 2 3.61 3.80 3.30 3.50 i i

d.

CI210ENSER AIR IN-IEAKAGE (SCEM)

(AVERAGE) l j

LMIT 1 23.56 27.00 28.00 30.00l l

1RGT 2 14.11 14.00 18.00 19.0' 1

w PIANT PEIGUMANCE INDICATORS AVF/YTD Oct-89 Nov-89 Dec-89 e.

SIEAM GENERATtR BIIMDOWN CATICH CI3EDUCTIVITY (MIGO S/CN)

(AVERAGE)

UNIT 1 0.160 0.140 0.144 0.120 tMIT 2 0.352 0.262 0.234 0.197 f.

STEAM GENERA 2tR OHIRIIE (ppb)

(AVERAGE)

UNIT 1 2.26 1.7 2.2 1.40 UNIT 2 2.71 2.40 1.80 1.20 g.

STEAM GENERAITR SUIEATE (ppb)

(AVERAGE)

UNIT 1 1.42 1.30 1.70 1.40 i

UNIT 2 2.43 1.70 1.50 1.10 h.

S EAM GENERAltR SODIUM (ppb)

(AVERAGE)

UNIT 1 1.42 1.90 1.90 0.6C UNIT 2 2.26 2.70 2.10 0.70

10. RADIATION OCGRREN3 REPORIS 16 1

2 0

E.AEHINISIRATIVE PARAMETERS 1.

NRC VIOIATICNS a.

IEVEL I O^

0 0

C b.

U. "EL II O

O O

C c.

IEVEL III O

O O

C d.

IEVEL IV 28 1

2 1

e.

IEVEL V 1

0 0

C f.

TMlhL VIOIATICNS 29 1

2 3

2.

NIC OPEN II1!MS (AVERAGE) a.

TOTAL OPEN 58 52 56 54 b.

OPENED THIS M2fIH

-6 1

14 d

p PIANT PERPG89H2 INDIC3GURS AVE / YID Oct-89 Nov-89 Dec-89 c.

CIDSED THIS M2CH 8

0 11 4-d.

IN PROGRESS (10 CIDSE) 39 31 26 35 e.

MANAGEMENT ATIENTICE O

O 2

0 k

3.

LICENSEE EVENT REEUUS a.

PERSCNNEL ERRES IMIT 1 12 0

0 1

UNIT 2 10 1

0 2

\\

b.

IISIGN IRRES

\\

UNIT 1 11 1

0 0 j i

UNIT 2 12 0

2 1

c.

EXIERNAL CAUSES UNIT 1 0

0 0

0 UNIT 2 0

0 0

0 d.

DEETCTIVE PROCEDURES UNIT 1 4

0 1

0 UNIT 2 8

0 0

1 e.

MANAENENT/QA IEFICIENCY UNIT 1 1

0 0

0 UNIT 2 0

0 0

0 f.

OTHER UNIT 1 4

0 1

0 UNIT 2 2..

0 0

0 g.

TUDLL IIR'S IMIT 1 32 1.

2 1

IMIT 2 32 1

2 4

p*

PIANT PERPGW9MCE INDICA 2MS AVE /YTD Oct-89 Nov-89 Dec-89 4.

IDErPTDEC ACCIMNIS u

a.

'IUML ICErP TDEC AOCIENTS O

O O

0 1

J b.

'IUEhL MMECURS WCEEED

1) UNIT 1 ST 942,278 47,232 42,218 57,492 l
2) UNIT 1 0F 41,950 2,962 2,623 4,891
3) UNIT 2 ST 789,858 38,274 35,009-43,360 1
4) UNIT 2 or 48,607 6,644 2,748 4,385
5) GENERAL Sr 709,018 93,567 95,866 168,677
6) GENERAL Or 46,950 4,651 7,190 15,166 k

5.

MEDICAL ATTl!NICCES 17 1

2 1

6.. ABSENTEEISM (AVERAGE)

SICK HRS / PERSON 2.87 2.21 1.99 3.03 PERSONAL HRS rzacKW 1.42 1.40 1.44 1.81

/

i f

4 P

j I

l s

1 4

,s

  • 1 4

i PIANT PERPGDENCE INDICA 2WS I

j (ATDOMENTI) partcominos Indicator onta "Maintenanos m of operatione" aga nAu wg=

StraightTimeStraightTimeStraigitTiml j

1) MBCMANICS AND FGti! MAN 15,930 15,207 20,921 !

]

2) EEECIRICIANS AND FUtEMAN 11,830 11,195 13,817 3)

DEfBUGINT AND CCImCIS Tf!DINICIANS 10,694 10,535 13,417 i

i

4) SUPERVISCRS AND MANAGERS 273 331 350
5) NCN-STA2TW CCMPANY IMPIMEES O

O O,

6) OCNIRACT Pl!RSONNEL 13,827 13,590 19,401l l

l

7) MAINTENANCE OIHER 2,893 2,929 3,578 l I

55,447 53,787 71,484 i

8) 'IUEAL MAINrl! NANCE 1

OCIDBER NWEMBER M lC D E E R "B"

"B" "A"

Overtina Overtina overtime l.

1) MBCMANICS AND FOREMAN 2,836 364 1,202
2) MAICIANS AND FOREMAN 1,126 762 374 L

3)

INEmDO2fr AND CCNDOIS TECHNICIANS 1,639 872 2,292

4) SUPERVISCRS AND MANAGERS 2

1 2

i

5) NW-STATICN CDEPANY IMPIMEES 0

0 0,

6) O WIRACT PERSG MEL 2,436 585 715
7) MAINNNANCE CHHER 103 165 36
8) 'IUIlAL OVERTIME MAINTENANCE 8,142 2,749 4,621l t

~_

(I 4

1 1

1 a

i l

PIANT PERRHGH2 2NDICEES (ATDOBEINT 2).

l RADIATICW EXPOSURE PCR ROUTINE PIANT MAINHl20H2 (RIIM)

JOB CIASSIFICXrICN 1

OCTOBER NOVI!MBER IEC2MBER (REVISED)

(1l STIMATE) j

].

1) MBCHANICS AND PGtEMAN 0.831 0.019 0.022
2) EIECIRICIAIEl AND PGtEMAN 0.016 0.000 0.033
3) INBHUE!NT AND CCHIB00!i TEC51NICIANS 0.226 0.079 0.037

)

4) SUPERVISGtS AND MANA3ERS 0.209 0.000 0.001 i

I

5) NGHBDEICE CIMPANY 1lMPIMEES 0.000 0.002 0.000
6) (22f5 TACT PERSCNNEL 1.359 0.126 0.034

~

7) HElE2H PHYSICS 0.966 0.021 0.018 I
8) OPEh0EIGEi 0.140 0.027 0.029 1

l TUML (REM) 3.747 0.274 0.174 NO.0F MiGNI1l NANCE UTIIITY 0

0 0

PERSCMEL > SREM/ EAR NO.0F MAINI!! NANCE CCNIRAcr 0

0 0

PliRSCHEL > SRDyYEAR i

t i

1 i.

i t

-