Text
-
O.
LOUISIANA 242 OeunONOe sineer POWER & L1G HT P o box 6008 = NEW OnLEANS. LOUISIANA 70174. (504) 366-2345 UEuS$svsY$
May 24, 1984 W3K84-1247 Q-3-A35.07.111 3 FM @[2 0V/Lijf Mr. John T. Collins
)
Regional Administrator, Region IV MAY 2 91984 U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 J
Arlington, Texas 76012
REFERENCE:
- 1) Telecon C. N. Hooper (LP&L) and W. Crossman (NRC IV) dated April 17, 1984
- 2) Telecon C. N. Hooper (LP&L) and J. Jaudon (NRC IV) dated May 16, 1984
Dear Mr. Collins:
SUBJECT:
Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 111
" Diesel Generator "A" Fuel Oil Pump" Final Report In accordance with requirements of 10CFR50.55(e), we are hereby providing two copies of the Final Report for Significant Construction Deficiency No. 111,
" Diesel Generator "A" Fuel Oil Pump".
(
This item was previously reported as PRD No. 167.
If you have any questions, please advise.
Very truly yours, Y
im $
l T. F. Cerrets l
Corporate Quality Assurance Manager TFG:CNH:VBR 1
Attachment cc: Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.
20555 (15 copies) 8406050172 840524 fS-37 PDR ADOCK 05000382
/
(
S PDR j
...., kA 1I e
Mr. John T. Collins May 24, 1984 W3K84-1247 Page 2 cc: Director.
Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Mr. E. L. Blake Shaw, Pittman, Potts & Trowbridge 1800 M Street, N.W.
Washington, D.C.
20036 Mr. W. M. Stevenson Monroe & Lemann 1424 Whitney Building New Orleans, Louisiana 70130 Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 Mr. W. A. Cross 7910 Woodmont Avenue Suite 1200 Bethesda,~ Maryland 20814 i
Af-
,y FINAL REPORT OF SIGNIFICANT CONSTRUCTION DEFICIENCY NO. 111
'" DIESEL GENERATOR."A" FUEL OIL PUMP" INTRODUCTION This report is submittal pursuant to 10CFR50.55(e), the report describes the
' failure of a fuel oil pump which subsequently caused a shutdown of the 3A-S Diesel Generator.
This deficiency is not considered reportable pursuant to 10CFR21.
DESCRIPTION On April 6, 1983, while troubleshooting governor problems associated with Emergency Diesel Generator (EDG) 3A-S, the engine fuel oil pump bearing failed. The failure was sudden and was witnessed by personnel monitoring the EDG. The cause of the failure has.been investigated but could not be ascertained. The deficiency was initially evaluated as not reportable.
During a Joint Test Group review of the "EDG" Reliability Report" the deficiency was reevaluated as reportable.
-SAFETY IMPLICATIONS Had the deficiency gone uncorrected the failure of the fuel oil pump could have prevented the "A" EDG from carrying out its design function during a loss of offsite power.-
!J CORRECTIVE ACTION The fuel oil pump was immediately replaced with a spare and tested satisfactorily. No other fuel oil pump failures on either engine have occurred since the time of this occurrence.
The vendor was contacted to determine if other failures had occurred. The vendor indicated that no other failures of KSV fuel oil pumps have been identified on nuclear grade equipment and the occurrence is isolated to
. aterford-3.
W To ensure that deficiencies are properly evaluated when first identified, the Nuclear operations QA Group has conducted training and upgraded the approved program for deficiency evaluation.
if This report is submitted as the Final Report.