ML20091G430

From kanterella
Jump to navigation Jump to search
Application for Amend to License DPR-56.Amend Revises Tech Specs by Permitting Operation W/Increased Core Flows
ML20091G430
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 05/30/1984
From: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20091G429 List:
References
NUDOCS 8406040274
Download: ML20091G430 (6)


Text

1

. p.

l BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION In the Matter of  :

PHILADELPHIA ELECTRIC COMPANY APPLICATION FOR AMENDMENT OF FACILITY OPERATING LICENSE

, DPR-56 f

Edward G. Bauer, Jr.

Eugene J. Bradley 2301 Market Street Philadelphia, Pennsylvania 19101 Attorneys for Philadelphia Electric Company f

8406040274 840530 PDR ADOCK 05000278 '

- ; 9 PDR

... e e

BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION In the Matter of  :

Docket No. 50-278 PHILADELPHIA ELECTRIC COMPANY APPLICATION FOR AMENDMENT OF FACILITY OPERATING LICENSE DPR-56 Philadelphia Electric Company, Licensee under Facility Operating License DPR-56 for Peach Bottom Atomic Power Station Unit No. 3, hereby requests that the Technical Specifications in Appendix A of the Operating Lic'ense be amended by revising certain sections as indicated by a vertical bar in the margin of attached pages 133d, 133e,-and 142a.

I

-l

.i l

1

~

.- \

1

, 1 l

The changes to the Technical Specifications are being '

requested to allow operation of Peach Bottom Unit 3 in the increased core flow region of 100% Rated to 105% Rated. An

. analysis of the safety considerations involved is set forth in a document titled " Safety Review of Peach Bottom Atomic Power Station, Unit No. 3, at Core Flow Conditions Above Rated Flow Throughout Cycle 6", General Electric NEDC-30519, March 1984, which is filed herewith and incorporated herein by reference.

The safety analysis supports the operation of the Peach Bottom Atomic Power Station, Unit 3, at increased core flow, provided the MCPR is increased by 0.01 for the P8x8R and PTA fuel during ,

the period from 2000 MWD /t before EOC to EOC of Cycle 6.

Accordingly, Licensee requests an increase in the MCPR limit as shown on Technical Specification Pages 133d, 133e, and 14?a.

Licensee requests that a license amendment incorporating the proposed changes be issued on or before September 11, 1984, to maintain the conservatism of the technical specifications during operation at increased core flow in the period between 2000 MWD /t before EOC and EOC of Cycle 6.

The results of the safety analysis show that adherence l

l to the technical specifications with the~ proposed MCPR limits incorporated will: preclude violation of any safety limits during

. operation of Peach Bottom, Unit 3, at increased core flow. The proposed changes.to.the MCPR-limit wi31 preclude: (1) an increase in the probability or consequences of an accident previously evaluated, (2) the. possibility of a.new or different kind of. '!

1

~

accident from any accident previously evaluated, and (3) a reduction in the margin of safety. For these reasons, the proposed changes do not constitute a significant hazards consideration.

l Pursuant to 10 CFR Section 170.22, Philadelphia Electric Company, for fee purposes, proposes that the Application for Amendment be considered a Class III Amendment since the proposed changes involve a single safety issue and are deemed not to involve a significant hazards consideration.

The Plant Operation Review Committee and the Nuclear Review Board have reviewed these proposed changes to the Technical Specifications, and have concluded that they do not involve any unreviewed safety question or a significant hazards consideration and will not endanger the health and safety of the public.

Respectfully submitted, PHILADELPHIA ELECTRIC COMPANY

/

~ ~

VIc'e PresIden

_3

COMMONWEALTH OF PENNSYLVANIA  :

ss.

COUNTY OF PHILADELPHIA  :

S. L. Daltroff, being first duly sworn, deposes and says:

That he is Vice President of Philadelphia Electric Company, the Applicant herein; that he has read the foregoing Amendment to Application for Amendment of Facility Operating Licenses and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, inf ormation and belief.

1, A

f s r / / Y

/4 Subscribed and sworn to before me this hkb day of M y /998/

afGua:6 Notary Public Atat

' ~ PATRICIA}D. SCHOLE

( Notary Public, Philadebbia. Philaddphis Co.

- _ Ny Commission Expires february 10,1986 N

, ' q

, ,,e l

_ , . . , . , -, - - ~ , .

~

CERTIFICATE OF SERVICE I certify that service of the forogoing Application was made upon the Commonwealth of Pennsylvania,.by mailing a copy thereof; via first-class mail, to Thoman R. Gerusky, Director, Bureau of Radiological Protection, P. O. Box 2063, Harrisburg, PA 17120; all this 30th day of May, 1984.

4 ,

g s 5 f S At, Euge chJ. B radl'e y Attorney for

. Philadelphia Electric Company t

G 0

I i

l I

- - ~ ~ ,