ML20091F040
| ML20091F040 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 10/31/1991 |
| From: | Feigenbaum T, Mardone P PUBLIC SERVICE CO. OF NEW HAMPSHIRE |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NYN-91185, NUDOCS 9111220234 | |
| Download: ML20091F040 (6) | |
Text
--
e New Hampshire Ted C. Felgenbaum h.h h
Presdent and Chief Entcutsve Ol'icer NYN 91185 November 15, 1991 United States Mucicar Regulatory Commission Washington, DC 20555 Attention:
Document Control Desk
Reference:
Facility Operating License NPF 86, Docket No. 50 443
Subject:
Monthly Operating Report Gentlernen:
Enclosed please find Monthly Operating Report 9110. This report addresses the operating and shntdown experience relating to Scabiook Station Unit i for the month of October,1991 und is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5.
Very truly yours,
,ffgSI 4**
Ted C. Feig nbaum Enclosure (s)
TCF:WJT/ tad cc:
Mi. Thomas T. Martir:
Regional Administrator United States Nuclear Regalatory Commission Region 1 475 Allendale Road King of Prussia, PA 19406 Mr. Gordon E. Edison, Sr. Project Manager Project Directorate 1-3 Division of Reactor Projects U.S, Nuclear Regulatory Commission Washington. DC 20555 Mr, Noel Dudley NRC Senior Residerit inspector P.O. Bot 1149 Seabrook, Nil 03874 1
l n934 911031 t
3311^,3[)dCK0500pg,3 DR
'* *g n 0 0 *I/ New H mpshii Yonkee DivWon of Public Service Company of New Hampshire j
er *O P.O. Box 300
- Seabrook, NH 03874
- Telephone (603) 474 9521 l-1
4-.
Nr.w llampshire Yankee November 15, 1991 h
L i
ENCLOSURP 1 TO NYN 911gi 1
P I
1 f
J 4
l k
l l
t T
I i
l ',
l..
dm
....~.-.
e
01'ERATING DATA REPORT DOCKET NO.
50-443 UNIT _,E,eabrook 1 DATE 11/15/91 COMPLETED BY P. Na-done TELEPHONE,L603 ),,414-9521 (Ext. 4074)
,QPERATING },TATVS l '. Unit Name:
Seab*ook $tation Unit 1 2.
Reporting' Period OC'IOBER 1991
- 3..-Licensed Thermal Power (MWt):
3411
-4. Nameplate Rating (Gross MWe):
1197 5.
Design Electrical Rating (Net HVe)4 1148 6.
Maximum Dependable Capacity (Gross MWe):
1200 7.
Maxi'num Dependable Capacity (Net MVe).
1150 8.
If Changes occur in capacity Ratings !. Items Number 1 Through 7)
Since 1.ast Report. Give Reasons:
Not Ap,qlicable 9.
Power Level To Which Restricted, If Any:
None 10, Reasons For Ret.trictions, If-Anyt
,,_,,,,,,,,,,Jp_t_ A pp l 1 c a bl e This Month Yr..to-Date Cumulative
- 11. Hours In Reporting Period 745.0 7296.0 44185.,0,
- 12. Number Of Hours. Reactor Was Critical 532.1 510 2. 2,,,,
10901.5 11.-Reactor Reserve Shutdown Hours 0.0 0.0
'953d i-
- 14. Hours Gener ator On-1.ine 3 5 7. ?,,,,_
4932.6 9060.0
- 15. Unit Reser're Shutdown Hours 0.0 0,d)_,,,,_
0.0
- 15. Gross Therinal Energy Generated (MWH) 80?,592 15570322
,_28170QiZ,
- 17. Gros.t Elec. Energy Generated-(MWH) 289785 5396946 9 6 68 86,J, _
- 18. Het Electrical Energy Generated (MWH) 274 60_L,
5178732 _
92727},0 0
- 10 Unit Service Factor 67.9 67.6 73.1
- 20. Unit.Avai!,abil1+.y Factor
-47.9 67.6
-73.1 l _,
- 21~.-Unit capa<:ity Factor (Using MDC Net) 32.1 61.7 6 8.,J.
-*22. Unit Capa:ity Factor (Using DER Net) 32.1 61.8 68.2
- 23.-Unit Forced Outage Rate 0.0 7.4 10.1
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration-of.Each):
,,,,,, one Scht duled N
251 If Shut 3 wn At End Of Report Period. Estimated Date Of Startup: Not Applicable L-L* NOTE: Valuea based on accumulated hours starting 08/19/90.- date Regular Full Powes* Operation began.
1 of 4 l
L a-a.
x-.=..
1 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.,,, 50-443 UNIT _,Spj,1 rook 1 DATE,,_11/15/91 COMPLETED BY P. Nardone TELEPHONE (603) 474-9521 (Ext. 4074)
MONTH OCTOBER. 1991 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL x
(MWe-Net)
(MWe-Net) 1 0
16 J
2 0
17 165 3
0 13 239 4
_?
19 2s9 5
0 20 483 6
,0 21 482 7
0
'd 484 0
0
.3
$$8 9
0 2
100.3 10 0
2$
1040 11 0
26 1068 12 0
27 1066 13 0
28 1070 14 0
29 1145 15 0
30 1146 31 lit 7 INSTRUCTIONS On this format, list the average daily unit power. evel in MWe-Net for each day in the reporting month. Compute to the nearast whole negswatt.
2 of 4
v
~
UNIT. SHUTDOWS 'A2D-PIdEE REDUCTNOKS DOCIET.' NO.
50-643 i).
UNIT Seabrook 1
.DATE 11/15/91 i '
Ft MhtT MONTH 'OCTOBERe 1991 COFLETED BY P. Nardnne.
TM MHONE (603) 474-9521 seat. 4074) l.
No..
.Date
. Typ Duration kcasent 2
Method of.
Licensee Cause & Corrective (Hours)
Shutting Event Action to l
3 Down Reacter Report i, Prevent Recurrence l
Page :L of 1
?
91-08 10101/91 S
383.6 C
4 N/A' Scheduled refueling outage (extended).
i; i
' 91 10/17/91 S'
4.4 B
9.
N/A Performed turbine over* peed tra.p surveillance. Turbine load reduced z
from 210 M'.Te.
Generater breaker cpened. Reactor rovst being held i
at 112.
4 p.
s t
i l'
i i
i 2
3 F: Forced Reason:
Method:
S: Scheduled.
A-Equipment Failure (Explain) 1-Mano.t1 B-Maintenance or Tent
?-Manual Scram C-kefueling 3-Automatic Scram 3-Regulatory Restriction
'-Continued from l
E-Operator ' raining-& License Examination previous month F-Administrative 5-Fower Reduction G-Operational' Error (Explain)
(Durat'an = 0)
H-Other (Explain)
,9 'Jther (Exp.ain) 3 of 4 4
4
.2 J
DOCKET No.
50-443 UNIT Seabrook 1
~
DATE 11/15/91 COMPLETED BY P. Nardone 1~
TELEPHONE (603) 474-95/1 0
(Exc. 4074)
REFUELING INFOR$ :0N REQUEST 3eabrook Unit 1 a
for ne't s+
'1(ng shutdown:
09/19/92 2
a 6
.t4.-
y 1%.
Po for roitart.
$ reing refuelinct 11/14/92 r %1ng or resumption of operation thereafter require a technical y -
?
y
,,; i enange or other license emendmenc?
,c
~3,
- Yes, cactor Coulant S tem Narrow Range RTD Bypass Elimination
?
'N
- 5. ScM N1ed date(s for submit. ting licensing action and supporting j
inrotmation:
Decamber 12, 1991 Inportant liceps: tg considerations associated with refueling, e.g.,
n e+t or different fuel design or sugplier, unreviewed design or performance analysis methods, significant changes in fuel design, net operating procedures; Next refueling will be the initial start of the 18 month fuel cycle schedule.
- 7. The number of fuel as.semblies (a) in ti.e core and (b) in the opent fuel storage pools (a) In Core:
193 (b),,
>0
- 8. The present licensed Opent fuel pool stotage capacity and the size of any increase in licensed storage capacity that has been requested or is planned. in number of fue~i
,semblies:
. city:
12 '.,6 Present licensed 4
No increase in storage capacity requested or planned.
- 9. The projected date of the last refueling that can be discharged to the spent fuel poci assuming the present licensed capacity:
Licensed capacity of 2.236 fuel assemblies based on fac.rteen annual refuelings and full core offload capabil3ty.
The current licensed capacity is adequata until at least the year 2010.
}
4 of 4 g
p.
's, L
.