ML20091E495
| ML20091E495 | |
| Person / Time | |
|---|---|
| Site: | Washington Public Power Supply System |
| Issue date: | 04/03/1992 |
| From: | Reynolds N WASHINGTON PUBLIC POWER SUPPLY SYSTEM, WINSTON & STRAWN |
| To: | Bloch P, Bright G, Schink D Atomic Safety and Licensing Board Panel |
| References | |
| CON-#292-12779 OL, NUDOCS 9204140219 | |
| Download: ML20091E495 (1) | |
Text
.
+
92.779 WINSTON & STIMWN
- s. AWreu J
ckcA n essca 1400 L STRMT N W-FHfD6R Cw N Wd*vPD*# 005316461 n wm wcun Dan 1 SLAs 4 rnA*% non me, y,4ssw mon en peons 350 F'^m" "*am~
'92 APR -6 P 1 :
(202) 3?t-5?CO wtw vtes otrcg nesmi aca vi sm J: m: _- : _ a y. r-3,nm
...,s.sc.a,va e en.
y,c y.,4,, ;,,,,
~% t.nw mem t+=
April 3, 1992 Peter B.
Bloch, Esquire David R. Schink Chairman, Atomic Saf ecy and Department of Oceanography
' Licensing Board Texas-A&M University U.S. Nuclear Regulatory College Station, Texas 77843 Coranission Washington, D.C.
20555 Mr. Glenn O.
Bright Atomic Safety and Licensing Board U.S.
Nuclear Regulatory Cora:tission Washington, D.C.
205fC Subj:
Washif.gton Public Power Supply System (WPPSS Nuclear Project No. 1) Docket No. 50-460-OL _
Gentlemen:
In accordance with the October 14, 1983, Memorandum and Order in_the captioned proceeding, the Washington Public Power Supply System hereby submits its quarterly status report regarding construction activities at WNP-1.
During~the first quarter of 1992, no significant safety-related construction activities were performed at WNP-1, although a limited engineering effort was continuing.
We do not anticipate'any change in this level of activity during the next several months.
Since e y l
$1
{-
/
ynolds Nichola S./
1 Counsel or*A plicant V
f.
cc:
Service List 1
ij 9204140219 920403 PDR ADOCK 05000460 l
G PDR h S 03 l
!