Monthly Operating Repts for Mar 1992 for Beaver Valley Power Station,Units 1 & 2
ML20091D776
Person / Time
Site: Beaver Valley
Issue date: 03/31/1992
From: David Jones, Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9204130019
Download: ML20091D776 (9)


Text

..

e .

. )Vg T4@

Telephone i412 343 6000 Nuclear Group P O Boa 4 Shg,pingeort PA 15077-0004 April 10, 1992 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operatim Report f-U. S. Nuclear Regulatory Ctattnission Document Control Desk Washington,' D.C. 20555 Gentlemen:

In accordance with Appendix A, Technical Specifications, the Monthly Operating Report is subnitted for Unit 1 and Unit 2 for the month of M1rch, 1992.

Very truly yours, Ch J. D. Sieber Vice President V Nuclear Group DTJ/nurg Enclosures cc: NRC Regional Office King of Prussia, PA 1001E0 9204130019 920331 PDR ADOCK 05000334 PDR

[62%

R

'// .j-

NARRATIVE

SUMMARY

OF l

MotmILY OPERATING EXPERIDICE UN1r 1 MARQi 1992 March 1 'Ihe Unit operated at a ncninal value of 100% output durirg through the entire report period.

March 31 e

- AVERAGE DAILY INIT F04ER LEVEL DOCKET 10. J0-334 LMIT BVPS Unit 1 DATE April 3. 1992 CD4PLEI'ED BY David T. Jones-TELEP110NL (412) 393-7612

!CIIH March 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY IU4ER LEVEL (54e-Net) (Mie-Net) __

1 825 17 817 2 821 13 821 3 825 19 825 4 819 20 821 5 813 11 821 6 817 22 821 7 813 23 829 8 821 24 821 9 817 25 813

~

10 817 26 821 11 821 27 __

816 12- 825 28 825 13 825 29 816 14 829 30 817 15 817 31 817 16 829 INSTIULTIONS On this format, list the average daily unit power level Mie-Net for each day in the repcrting renth. Campute to the nearest whole megawatt.

OPERATING DATA REPORT DOCKET NO.. 50 334 REPORT DATE: 04/03/92 COMPLETED BY: Di.VID T. JONES TELEPHONE: (412) 393 7612 OPERATING STATjlS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
2. REPORTING PERIOD: MARCH 1992
3. LICENSED THERMAL POWER (MWt): 2652
4. NAMEPIATE RATING (Gross MWe): 923
5. DESIGN ELECTRICAL RATING (Net MVe): 835
6. MAX. DEPENDABLE CAPACITY (Gross MWe): 860
7. MAX. DEPENDABLE CAPACITY (Net MWe): 810
3. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO k'HICH RESTRICTED, IF ANY (Net MUe): None
10. REASONS FOR RESTRICTIONS, IF ANY: N/A THIS MONTH YEAR TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD: 744.0 2184.0 139536.0
12. NO. OF HRS. REACTOR VAS CRITICAL: 744.0 2184.0 87507.6
13. REACTOR RESERVE SHUTDOWN HOURS: 0,0 0.0 4402.8
14. HOURS GENERATOR k'AS ON LINE: 744.0 2184.0 85615.2
15. UNIT RESERVE SHUTD0kT HOURS: 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GEN. (MWH): 1966962.0 5775391.0 204287563.5
17. GROSS ELECT ENERGY GEN. (MWH): 646500.0 1907380,0 65705783.0
18. NET ELECTRICAL ENERGY GEN. (MWH): 610330.0 1803230.0 61370780.0
19. UNIT SERVICE FACTOR: (PERCENT) 100.0 100.0 63.4 20, UNIT AVAIIABILITY FACTOR:(PERCENT) 100.0 100.0 60.4
21. UNIT CAPACITY FACTOR (MDC): PCT 101.3 101.9 57.0
22. UNIT CAPACITY FACTOR (DER): PCT 98.2 98.9 55.3 ,,
23. UNIT FORCED OUTAGE RATE: ( PERCET) 0.0 0.0 16.4  !
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE DATE,AND DURATION OF EACH):
25. IF SHUT DOWN AT SND OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): ,

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A

l !l!ll!j i' l ll l jI

'l l ii i!1i 1i) e l

i

2 F _

2 a 16 s _

1 9

  1. 9 c- F e

v ec t )

eR _

1 J - i n eE _

t 3, t e hL _

- i 3

T 3 9 cor et r r S( _

. 4 M L r u oyt _

- 3 3

t Si id 2

) rnc ooe f rr t o

- F e v 1 CiR snp .

0 V c e 4 S A t nee o R e

c 5

f( &et e

n e

i a t t t r

u s v can o eye u e uDe v S r

7wtBn a NDdh 3 C a r P tfE so e

m t ep n I ne)

e. S a

et t e ki el - os1 -

cn l e Fi n6 W oU pT t e1 m t ac3 t D' o iriG i C bale i p I i b _

M _

hert h xr ou x _

EPft E t _

i & 5 a5 ie o

C

+d C h .

t n _

m :o.

) .

% e 'e s 0

2

's yo d o u -

t SC i

( v e

s u

l mr aP O r I

T 2 e

e

  1. ecm eS o C 9 stt r r U

D 9

1 nnr eeo ccf n Si o E cvp t .i R H iE e lt adt

aem R

E R

A C L R donnt u undh o 't cr ue W '4 h aauoet O tMmACdO P N 3 e- - - -

T r M123459 D N f o N O ogt 3 A M nc dia S T ote M R htR -

- O t u C P ehn D E MSw m T R o a U D x M E S

) e ) .

T n s n I 2 i n i M n a e a I

L o l p

c l p

s ni a x oL x e E i E R ( t t& (

s c

.ee rT i g rn o r) r n u ti o) t r snern i s l o eivEi t r a t ai a su F e rtll re c yt aap uM t ngr nanort oE rnx D(

enit osi(

met ati t

pt el anar ninuurire ouif gemeh l s q a e e pd pt e

p aEMRRoAOO e- - - -

y RABCDEFGH T

2 e d t e a l D du ed ce rh

. E oc o N FS 4 O - -

N F S

- 1 j ,i' j i' 1

  • ^

IIARPMIVE SU4WIY OF

!D/n1LY OPD7ATI!G EXPDuDJCE -

UllIT 2 MAROI 1992 lbrch 1 20 Unit continuod to operate at appnacimtoly 80% output through for cr4 of life fuel coastdown prior to the Unit's thinA lurch ' refuelirn outago.

!brch 6 At 2330 hours0.027 days <br />0.647 hours <br />0.00385 weeks <br />8.86565e-4 months <br /> the Unit commencod a poAir roduction to approxim tely 50% output for end of life fuel coastdown I

prior to the Unit's third refueling outage.

!brch 7 At 1440 hours0.0167 days <br />0.4 hours <br />0.00238 weeks <br />5.4792e-4 months <br /> the Unit achieved approxim tely 50% output.

March 8 he Unit continued to operate at approximtaly 50% output ,

through for eJd of life fuel coastdown prior to the Unit's third March 12 refueling outages.

!brch 13 At 2200 bcurs the Unit commenood station shutdown for the third refueling cutage. 2e Unit was taken off-line at 2239 hcurs when-.the min generator output breakers were opened. We Unit entered Wdo 2 at 2247 hours0.026 days <br />0.624 hours <br />0.00372 weeks <br />8.549835e-4 months <br />. 20 Unit entered Mode 3 at 2305 hours0.0267 days <br />0.64 hours <br />0.00381 weeks <br />8.770525e-4 months <br />.

!brch 14 Wo Unit entered Modo 4 at 0709 hours0.00821 days <br />0.197 hours <br />0.00117 weeks <br />2.697745e-4 months <br />. 2 0 Unit entered riodo 5 at 2030 hours0.0235 days <br />0.564 hours <br />0.00336 weeks <br />7.72415e-4 months <br />.

i March 15- 20 Unit remined in Mode 5 in preparation for entering through ' Mode 6.

March 20 March 21 t o Unit entered Modo 6 at 1510 hours0.0175 days <br />0.419 hours <br />0.0025 weeks <br />5.74555e-4 months <br />.

March 22 to Unit nmainod in Mode 6 for the remairder of the report through period.

March 31 l

,, . , _ . , . . _ , . . , _ . _ . . , , . . . __ , _ . , . - _ . . . , , _ , , _ . . . - . ,,.-,_...m.., . , _ , . , , _ , - . ,

AVERAGE MILY Ui1T 3WER LLVII D00TI' 1D. _50-412 GIIT __INPS Unit 2 DATE _fL7til 3. 1992 CrHPLUIID BY _Dayjst T. Jones .

TiLIT1KX1E _ f 412) 393-7612-

!DIT111 Ibrah 1992

DAY AVIR/GE DAILY IWlR IJNIL DAY AVERICE DAILY IWER LLVIL

(!No-lict) (!M2-11ct) .

1 634 17 0 2 fD2 18 0 3 635- _ ,_ 19 _

0 4 625 _ 20 0 5 _

621 21 0 6 621 22 0 7 452 23 0 8 345 24 0 9 341 25 0 10 341 26 0 11 352 27 0 12 351 28 0 13 311 29 0 14 0 30 0 15 0 31 0 .

16 0 I!UIRUCTIOt1S On this formt, list the average daily unit pwer level IUe-tiet for each day in the reporting month. Campute to the nearest whole magawatt.

CPERATING DATA REPORT DOCKET NO. 50 412 REPORT DATE: 0/J96/92 COMPLETED BY: DAVID T. JONES TELEPil0NE: (412) 393 7612 3PERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
2. REPORTING PERIOD: MARCll 1992
3. 'ICENSED TilERMAL POWER (MWt): 2652
4. NAMEPLATE RATING (Gross MWe): 923
5. DESIGN ELECTRICAL RATING (Net MWe): 836 6, MAX. DEPENDABLE CAPACITY (Gross MWe): 870
7. MAX, DEPENDABLE CAPACITY _(Net MWe): 820
8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO VllICll RESTRICTED, IF ANY (liet MWe): None
10. REASONS FOR RESTRICTIONS, IF ANY: N/A ..

THIS MONTil YEAR *IO DATE CUMULATIVE

11. Il0URS IN REPORTING PERIOD: 744,0 2184.0 38319.0 L 12. NO. OF llRS. REACTOR WAS CRITICAL: 311,1 1751.1 32831.3 l 13. REACTOR RESERVE SilUTDOWN ll0U*tS: 0.0 0.0 0.0 l 14. Il0URS CENERATOR WAS ON LINE: 310.7 1750.7 32632.7 l 15. UNIT DESERVE SHUTDOWN 110URS: 0.0 0.0 0.0 l 16. CROSS *.llERMA1. 5:NERGY GEN. (MWil) : 509755.0 4176762.0 79536509.4
17. GROSS ELECT. ENERGY GEN. (MWH): 161793.0 1346432.0 25521013.0
18. NET ELECTRICAL ENERCY GEN. (MWil) : 147703.0 1271207.0 24076692.0
19. UNIT SERVICE FACTOR
(PERCENT) 41.8 80.2 85.2 l 20. UNIT AVAILABILITY FACTOR:(PERCENT) 41.8 80.2 85.2 l 21. UNIT CAPACITY FACTOR (MDC): PCT 24.2 71.0 75.9 l 22. UNIT CAPACITY FACTOR (DER): PCT 23.7 69.6 75.2 t 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 3.7
24. SHUTDOWNS SCMEDULED OVER NEXT SIX MONTilS (TYPE,DATE.AND DURATION OF EACH):

! THE UNIT'S TillRD REFUELING OUTAGE IS CURRENTLY IN PROGRESS.

l l 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 5/23/92 l

26, UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACllIEVED l INITIAL CRITICALITY N/A __tUA l INITIAL ELECTRICITY N/f N/A COMMERCIAL OPERATION N/A N/A.,__

Docket No. 50-412 -

UNIT SMUTDOVWS A 9 POWER REDUCT10ms (t20%) Unit base BVPS Unit 82 Date April 3. 1992 Completed By David T. Jents Telephone (412) 393-7612 REPORT WOWTR MartM 1992 Licensee Cause & Corrective Method of Action to Shutting Event Srstem Component Duration Code 4 Code 5 Prevent Recurrence Reason 2 Down Reactor 3 Report #

No. Date Trpet (Hours) 4 m/A ZZ ZZZZZZ Units output reduced f rom 100% to 0 a 6 920301 5 801 for end of life fuel coastdown prior to the Unit's third ref ueling outage.

l m/A ZZ ZZZZZZ units output reduced f rom 80% to 0 N 5 7 920307 5 50% for end of life fuet coastdewn prior to the Unit's third refueting outage.

w/A 22 ZZZZZZ Ramped power dowa prior to 920313 5 0 m 5 beginning the Unit's third 8

refueling outage.

RC FUELNX Unit shutdewn for third refueling 433.1 C 1 m/A 9 920313 S outage.

i 3 4 1 2 flethod: Exhibit F-Instructions f or F-Ferced Reason:

1-Manuel Preparation of Data Entty $ beets S-scheduled A-Equipment Failure (Esplalp) f or Licensee Event Report (LER) File S-Maintenance or Test 2-Manual Scree 3- Aut omatic Scram (EUREC0161).

C-Refueling D-Regulatory Restriction 4-Cont'd. from Previous Month 5-R educ ti on 5 E-Operator Training & License Emas Exhibit R-Same Source.

F-Administrative 9-Other G-Operational Error (Explain)

H-Other (Explain)

. _ - _