Special Rept:On 910714,stack high-range Radiation Monitor Declared Inoperable Due to Intermitten Failures Caused by Fluctuations in Output of Power Supply.Guidance Provided Re Resetting Monitor to Operating Status
ML20091C341
Person / Time
Site: Millstone 
Issue date: 07/29/1991
From: Scace S
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
MP-91-618, NUDOCS 9108060239
Download: ML20091C341 (1)


Text

.

pggg gygg General Offices'Selden Street, Berhn Connecticut 5 l NE.InNSIeDnett SrYcNah P.O. Box 270 OtYe*a I[$t.

INoany HARTFORD, CONNECTICUT 06414-0270

(

erv Norte. east meiear Ersgy company (203)665-5000 July 29, 1991 MP-91-618 Re: Milistone Unit 2 Technical Specification 3.3.3.1.b Table 3.3-6 Action 17 U.S. Nuclear Regulatory Commission Document Control Desk Washincton, D.C. 20555

Reference:

Facility Operating License No. DPR-65 Docket No. 50-336

Dear Sir:

This lette. provides information required by Millstone Unit 2 Technical Specification 3.3.3.1.b, Table 3.3-6, Action 17 and constitutes a Special Report required by that specifica ion.

At 1430 on July 14,1991, the Unit 2 stack high rance radiation monitor RM 8168 was declared inoperable. Intermittent failures caused by fluctuations in the output of its power supply had been observed to cause the monitor to automatically halt its operation.

These interruptions occurred at a frequency of approximately once per day. This monitor is microprocessor based and is designed to detect fluctuations in its power supply's performance and save its programming information prior to a total loss of power supply output.

Guidance had been provided to operations personnel on how to reset the monitor to operating status. This allows the monitor to be immediately restored to service during the period that preparations are being made for the repair of the spare power supply.

Th: necessary repair parts were ordered on July 16 and iepairs are currentl underway to 3

rebuild and install a spare power supply with an adequately stab!c output to maintain long term continuous operation. These repairs and subsequent testing are expected to be completed by July 31, 1991.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY l

7 lStephe l

cacc/

E. 'cace Director, Millstone Station SES/JB:ljs ec:

T. T. Martin, Region I Administrator W. J. Raymond, Senior Resident inspector, Millstone Unit Nos.1. 2 and 3 C. S. Vissing NRC Project Manager, Millstone Unit No. 2 gg l'

9108060239 910729 f

7

- **g

,.o 9,

i