ML20091A831
| ML20091A831 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 07/02/1975 |
| From: | Wachter L NORTHERN STATES POWER CO. |
| To: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20091A828 | List: |
| References | |
| NUDOCS 9105200410 | |
| Download: ML20091A831 (1) | |
Text
- _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ - - - - - - _ _ _ _ _ _ _ - _ _ _ - _. - _ _
!f i
6 e
t r
NORTHERN STATES POWEM COMPANY
(
wtN N s A pot.s e. M c H N a s ot A esmot l
July 2, 1.973 l
i 4
.f i
\\
Mr Gaston Fiore111, Chief l
Reactor Operations Branch j
Region III Nuclear Regulatory Com:nission l
4 799 Roosevelt Road l
Clan Ellyn, IL 60137
Dear Mr Fiore111:
HONTICELLO NUCIIAR CEMERATING PLMTT l
Docket No. 50 263 License No. DPn 22 I
Response to Item llueber 1 Listed on 10, 1975 Enclosare to letter Dated June 10, 1975
'this letter is written in response to an item in your letter of JuneYour letter, ad concerninR It inspection 1:o. 75-09.
Wachter, Vice President Power Production & System Operation, referred to an h
activity which appeared to be in viointion of JiRC requirettents and for whic a reply was required. The activity was:
reviewed 6.2.B.4.h, Operating Procedure B.7.3, Solid nadwaste Systetn, was not within the two year interval required by the Technical $pecification".
At the tirne of the inspection Operations Manual Section D.7.3, Solid Esdw Systern, was undergoing a taajor revision.as part of the first bi-annual review of 25, 1975, operations Cocnittee on JuneFuture revisions of operating procedurcs are expected to operating procedures.
likely.
be less extensive, therefore, a recurrence of this deficiency is not The status of operatitig procedures will be reviewed periodically by plant management to assure that Operations Cormittec reviews are conducted as required.
l Should you have any questions concerning our actions, please comunicate directly with the plant management.-
t Yours very truly, N$
L J %(Qachter, Vice President Power Production & System Operatic,n f
WW/ma 9105200410 750714 PDR ADOCK 05000263 O
PDR cc A Glat:.busso G Charnoff Minnesota Pollution Control Agency Attn: J W Fennan I
.. _ _,, _ _ -.. _.. _.. _ _ _ _ _ _ _.... _ _ ~... _.. _. _ _. _ _.
_ _. _ _., _ _. _. _ _ _ _ _. ~ _ _ _ _
.