Submits Addl Info Re SER Proposed Licensing Conditions 8,9,10 & 12,concerning Emergency Svc Water Sys,Rhr Sys Water Sys,Control Structure Chilled Water Sys & Control Room & Structure Ventilation Sys
ML20091A719
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 05/25/1984
From: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Schwencer A
Office of Nuclear Reactor Regulation
References
NUDOCS 8405300069
Download: ML20091A719 (4)


Text

....

PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHIA, PA.19101 MAY 251984 m sie ~ s m V IC E-PR ESI D E N T 50eG0ME E RefeG AND RESE AMC64 Mr. A.

Schwencer, Chief Docket Nos.:

50-352 Licensing Branch No. 2 50-353 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Limerick Generating Station, Units 1&2 Additional Information for Auxiliary Systems Branch (ASB) Regarding SER Proposed Licensing Conditions 8, 9,

10 and 12.

References:

1.

Telecon between J. H. Arhar (PECO) and J.

Ridgely (NRC/ASB) on 5/11/84 2.

Letter, E. J. Bradley to H.

R. Denton, 5/18/84 (Amendment No. 65 to License Application).

File:

GOVT 1-1 (NRC)

Dear Mr. Schwencer:

We are pleased to offer the following additional information, discussed in the reference telecon, in support of the resolution of the subject proposed license conditions.

SER proposed license conditions 8,

9, 10 - and 12 require two common conditions for operation of shared systems (i.e.,

systems that are common to the two reactor units) during the interim period between Unit 1 operation and Unit 2 construction.

These shared systems include the emergency ' service water (ESW) system (license condition

  1. 8), residual heat removal service water (RHRSW) system (license condition #9), control structure chilled water (CSCW)- system (license condition #10), and control room and control structure ventilation (CRCSV) systems (license ccindition #12).

The two common conditions for operation of shared systems include onsite stand-by power and security conditions.

"~

8405300069 840525 PDR ADOCK 05000352 E

PDR I

t O'

Onsite Stand-by Power The subject license conditions require that each shared system be powered from only the Unit 1 diesel generators during Unit 1 Operation / Unit 2 construction.

The following system design aspects provide our proposed compliance with regard to this condition.

1.

During two unit operation, ESW pumps A and B are powered from Unit 1 diesels A and B, while pumps C and D are powered from Unit 2 diesels C and D.

However, during Unit 1

operation / Unit 2

construction, pumps C and D will be powered from Unit 1 diesels C and D (FSAR Section 9.2.2.6).

2.

During two unit operation, RHRSW pumps A and B are powered from Unit 1 diesels A and B, while pumps C and D are powered from Unit 2 diesels A and B.

However, during Unit 1 operation / Unit 2 construction, pumps C and D will be powered from offsite power sources only (FSAR Section 9.2.3.2).

Because each RHRSW pump provides 100% heat removal capabili ty, complete redundancy is provided even in the unlikely event of total loss of offsite power.

3.

During both Unit 1 operation / Unit 2 construction and two unit operation schemes, safety related components of the CRCSV and CSCW systems are powehed from only Unit 1 diesels C and D.

Security The subject license conditions require that components and related piping of each shared system be included as part of the Unit 1 security boundary during Unit 1 operation / Unit 2 construction.

The Unit 1 security boundary is defined in the Limerick Physical Security Plan.

The following system design aspects provide our proposed compliance with regard to this condition.

1.

During Unit 1 operation / Unit 2 construction, ESW and RHRSW supplies and returns to Unit 2 onclosures are valved or flanged off.

ESW and RHRSW pumps are located within the Unit 1 security boundary.

ESW and RHRSW piping and isolation valves that are located outside of the Unit 1 security boundary enclosures are protected by special security measures as described ir Chapter-10 of the Physical-Security Plan.

Chapter.10 was transmitted in reference (2).

L

F-2.

CRCSV system components are located within the Unit 1 security boundary.

Related system IIVAC ducts which penetrate the Unit I security boundary are protected by special security measures as described in Chapter 10 of the Physical Security Plan.

3.

All CSCW system pumps, related piping, and isolation valves are located within the Unit 1 security boundary.

Should any additional information be required, please do not hesitate to contact us.

Sincerely, JIIA/gra/0514841105 cc:

See Attached Service List

cc: Judge Iawrence Brenner Judge Richard F. Cole Troy B. Conner, Jr., Esq.

Ann P. Ilodgdon, Esq.

Mr. Frank R. Rcrnno Mr. Robert L. Anthony Charles W. Elliot, Esq.

Zori G. Ferkin, Esq.

Mr. Thanas Gerusky Director, Penna. Emergency Management Agency Angus R. Love, Esq.

David Wersan, Esq.

Robert J. Sugarman, Esq.

Spence W. Perry, Erq.

Jay M. Gutierrez, Esq.

Atanic Safety & Licensing Appeal Board Atanic Safety & Licensing Board Panel Docket & Service Section Martha W. Bush, Esq.

Mr. James Wiggins Mr. Timothy R. S. Campbell Ms. Phyllis Zitzer Judge Peter A. Morris t..

_ _