ML20091A668
| ML20091A668 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 05/15/1984 |
| From: | Jens W DETROIT EDISON CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML19269A167 | List: |
| References | |
| EF2-68542, NUDOCS 8405300055 | |
| Download: ML20091A668 (1) | |
Text
.
' 2.790 (d) Material W;yne H. J;ns
%Sf3@"L,.
Withhold from Public Disclosure Delicit 2000 Second Avenue
$b EE5fNII8""*'
May 15, 1984 EF2-68542 Mr. James G.
Keppler 4
Regional Administrator Region III U.
S.
Nuclear Regulat'ory Commission 799-Roosevelt Road Glen Ellyn, Illinois 60137
- ~
Dear Mr. Keppler:
Reference:
Fermi 2 NRC Docket No. 50-341
Subject:
Detroit Edison's Response to Inspection Report No. 50-341/84-08.
With this letter, we~are providing the information you requested _in your letter of April 6, 19 84, transmitting
-V Inspection Report No. 50-341/84-08.
This inspection report describes the result's of a routine preoperational safeguards inspection conducted by Messrs. [C. J.-Madeda and B.
W.
Stapleton at Fermi 2 during the period of March 12-16, and 28, 1984.
O The enclosed response describes the steps taken or intended to be taken to address the matter relating to'the testing and maintenance of installed security related equipment and the matter relating to records mnintenance.
The responses are arrangco to correspond to the sequence of-items listed 1
in the bcdy,of your report.
WeD trust this response will satisfactorily address your request.,
If you,have questions ~concerning this matter, please contact,Mr. Lewis P.
Bregni (313) 5G6-5083.
Sincerely, 9405300055 840523
~
b PDR ADOCK 05000341 75
/
u PDR m
cc:
M'r.
P.
M.
Bybm
'Mr.
R.
C.
DeYouag
.- Mr.
R.
C.
Knor WHEN SEPARATED FROM ENCLOSURES, HAND I 2.790 (d), Material THIS DOCUMENT ASzDEC0HIROLLED Withhold from Public Disclosuw MAY 181984 n