Requests Addl Info Re Allegations of Data Falsification of Welder Qualification & Welds Produced by Unqualified Welders
ML20090M609
Person / Time
Site: Zimmer
Issue date: 09/15/1982
From: Udall M
HOUSE OF REP., INTERIOR & INSULAR AFFAIRS
To: Palladino N
NRC COMMISSION (OCM)
Shared Package
ML20090M535 List:
References
FOIA-82-206, FOIA-82-A-11 NUDOCS 8405290095
Download: ML20090M609 (12)


Text

--

cenom

& .; ? ';'::: "% ".".' t'n't*,.' . xi-ia " ~

  • c'aa i

' ,I'. ' '.*. *e". .'.l."..*  % U.UlI.'.k-. ==,.. CCMMITTEC CN INitR'CR AN3 INSL.4R AFrAIR5

' I.. A * ' ,","O ."" . .'." "E*Ci'".'.a . . U.D. Hou;:C cF ntenc tt.7ATIvcs "g',,,y,$'" ,,,

$ *.*udel s I. N oI.'. *I.S am pas. W ACHItv37CN. o.C. MSt 8 , , , , , , , , , ,

=',.".u".:t.'o'"'-  :""'.".'.".f' '."" '.". ." ' * * * " " * * ' " '
r.'.?c'= '.7 C'."it.':::", . /

20':"".".'. *7.t , .

';;:7".='.;',:f-

""Mt ::. O."i, *

'::::::~t"l"t.% ,,.

"!::";.O.:"%

. ('/

(

.j

="0.0 C E'
*t."2 September 15, 1982
  • .'. n u.. ::.l";;".."'

4 The Honorablo Nunzio Palladino l l Chairman V United States Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Chairman:

I am writin'g to request additional information concerning, quality assurance at the Zimmer project. Where information I

I is not available, please provide existing data and an estimate of the date when complete data will be available.

. Please tabulate the following: documentation doficiencias vis-a-vis woldor. qualifications wolds produced by wolders whose qualifications can not be establishods wolds that may

' be defectivo because of use of impropor wolding m torials i wolds not produced in accordance with procedures that l complied with the ASME codos; piping systems with heat l '

number deficiencies; materials purchased from unqualified l vondors; documents considorod invalid becauna of invalid l signatures, whitoouts or missing informations dineropancias betwoon drawings and "as-built" systems; and, nonconformance

reports not handled as required by regulations.

l Pleano describe corroctive actions (and the magnitudo of

! work implicit theroin) with respect to the forogoing.

Wore liRC regulations viointed by virtue of the mannne in l

which Henry J. Yainer or Cincinnati Gas & Electric monitored

! the qualification of weld proceduros and/or notified the Commission of the apparent falsification of data? '

l Do NRC Region III staff believe the findings of the wolder qualification review as pronanted to NRC on July 9, 1982 .

wore an accurate reflection of information than ponnonned by ,

l Ilonry J. Mainor and CGr.E Quality Assuranco managers? ,

Thank you for your annistance. , ,

u Dincoral ,

5Sg9]95e403294* '* *' " &gfAL Mgg Chairman i '%

m- 1

.% V -

\ .

n ...

  • Dam:ncun, l'uryland /

Cctober 20, 198 /M .4 The Honorablo Morrin K. Udall

'" Chairman

}V g

/)

1 Committoo on Interior and Insular Affaira U.S. Ilouse of Reprenantativen Wachington, D.C. 20515 hI Dhar Chairman Udall: ,

/

In responne to your October 6,1982, letter, encicined are a npsbor * .

of documento reinting to a U.S. Nucionr Roguintoryr Co=mioniod (NRC) investigation of the Willinn II. Ziczor Nucion! Porer Station. The following information may anniet you in understandling thuf oncloned documento. / e In December 1980 the Government Accountability Prodect (OAP), on bohn1f of Thoman Applegato, roquestod an investignition of *(nmong other thingo) the inndequacion of NRC Region III'm previoun inventication of Applegate 's allegatiohn concernints Zimmer. At that timo I wan an inventicator with the NRC Officio of Inspector and Auditor (OIA); another 01A investigator and I more nanigned to inventicate thin matter, to include the identifiba' tion-of any -

deficiencien in the NRC'n overall investigativo priogram. Our field invectigation commenced January 13, 1981, and cone.*1uded March 6,1981, with the interview of Terry Harpater, a for:or Rog; ion III innpoctor

  • for Ziemor. The fiant OIA report of inventi6stiom was innued August 7,1981, and in entitled "Adoquacy of IE Imventication 50-358/80-9 at the William H. Zimmer Nucionr ponor Station."

Our draft report of investigation was sub:itted tcn CIA managonent who ronrote como portionn and deleted other portiorno entirely. The nu=nry of the report wan ronritten no that it no 2oncer doncribed the ncopo of OIA's invoutigation an including a resview of overall -

wenknocnon in the URC inventigativo progrant the rionritten nummary of the finni report londs the ronder to believe that 01A hid only performed a limited inventication of ineptnoon by lNRC craployoon, when the scope had actually boon broader. The resulto rof our interview of Harpster (in which he outlined problems he encount orod while nanigned to innpoet Zimmer) were deleted fron the finn 1 repiort entiroly.

pinally ny nuperfinor (OIA's Acting Ancietant Diro ctor for Inventigntions')

and I were nont back to Region III to revier the "'finni draf t" report with the very :nemborn of the Region III ntaf f whom we were investigating.

The numanry and como of the interviers rote then c:hnne,od to accomodate.

Region III'n coemento.

The above noquenco in important, not only for what; it anano about tho, integrity of OI A's' finni report, but nico as t he back-drop ncninut which to conni, der CI A's responne to a nubsioquent Troodos of Information Act ()0IA) requent. lAto in 1981 UAP requented that DIA y,h 6

, ., u- ,---- . ,

. ,_z .

b t- .- 1., .

re' lease all draf ts of the report in question, especially any caterial that. was deleted from the final report (the exact date and language of the FOIA request can easily be determined through OIA's records).

Upon receipt of the GAP request, my supervisor asked me if I had any

., records subject to the request--other than the records filed in OIA's

" front files" -(i.e. , the files stored in OIA 's safes). Tihen I replied that the file cabinet in my office contained a number of draf ts and material that had been deleted from the final report, I was directed 4 to remnsut_these documents from OIA offices _ OIA's response to GAP's '4 4

POJA request made no mention of these documents.

  • ?

The all the appendixdocuments to this that letter, were inentitled OIA files " Documents at the time GAP'e-FOIA in OIA Files ," lists ' / 4 '

request was received. Many of these documents were already in, or ~

[

were subsequently added to, OIA's " front files".; I do not pave copies of any such documents. . The r,emaining- documents were kept 'by f OIA

' investigators in filing cabinets in their of fices. The enelosed" documents were' stored in the filing cabinet in my office because they were not authorized to be filed in the " front files." Thes,e are the same documents which I was directed to remove from OIA offices after OIA had received GAP's FOIA request. I have maintained possession of these documents since that time, although I recently provided copies to th'e IGC Office of the General Counsel at its request.

If you have any questions concerning this matter, I can be reached at 274-1373. .

Sincerely, t-David H. Gamble Appendix: Documents in OIA Files Enclosures (letter designations correspond to those used on the Appendix):

N , U , Y , Z , AA , BB, ( 2 v ersio ns ) , CC ,

~

DD, EE, GG, HU., II, 00, PP, QQ,- RR, ss SS, TT, UU, VV, s WW, XX, YY, ZZ, and AAA s .

  • g e

'I N

.g ' s ,- , 's 1 '

=

t t

e

x ~ m, L -

^b h,., , u s- e,c ,, m , , , . , , _,,,,_,4 . _ _ , _ _ _ , , , , _ _ , , , , , , , _ , , _ , , . , , _ , __,_,,,,,_,,en'

+ -

a,-

m., -
. , i .

i* .

A. File Transfer Record to Terry Harpster, IE fm Dave Gamble, OIA, dated 3/9/81, transmitting Harpster's personal file re Zimmer.

1. Memo G. Gower fm J. Keppler, re Zinmer - Report of Investigation into Licensee Statements at ACRS Subcommittee Meeting, dated

- - a- 7/31/79. Attachmer..: a.. Letter Borgmann fm Keppler, dtd 7/31/79,

- 're investigation by IE re accuracy of statements re staffing of Zimmer made by licensee during meeting with ACRS. w/ attach.

Region III Report No. 50-358/79-21, for Investigation May 21-24, 1979.

. *e*

6 e

4 e

0 e e

  1. e 9

0 9

S

  • N o

0 9

, e # **

  • e y .

__ _L . _ _

  • _. L_ . . _ _ _ _ _ ____ _

_____?

p . .. ,

4 " -

2. Meino Thompson fm Keppler, re Erroneous Statements Provided By Applicant at Zimer ACRS Subcommittee Meeting ( AITS, F30488H6),

dated 4/10/79

Attachment:

Statement of Facts Re Erroneous Info Given by Applicant at l Zimmer ACRS Subcomittee Meeting.

3. Memo Keppler fm Thompscn, re Apparent False Statements by -

Applicant at Zimmer ACRS Subcommittee Meeting (AITS F30488H6),

dated 5/2/79.

Attachment:

1.tr Keppler fm Borgmann re Region III wishes to interview CGt.E re statements made to ACRS, dtd 5/18/79. . -

4. Transcript of Testimony of Mr. Schott before Mr. Bender.( ACRS")

4 pp only, undtd.

5. Transcript of Testimony of Mr. Borgmann before ACRS - 20 pp only, undtd. .
6. NRC, Region III, Press Release !79-12, dated 3/22/79.

Attachment:

Ltr Hendrie fm Carbon, re Report on William H. Zimmer Nuclear Power Station, Unit 1, dtd 3/13/79.

4 G

9 e

W O

e g . *.

1

.- . . -. _ , _ . . . _ . . . , ...-,.z,. - , . _ , . . - . . . _ , , . . _ .-

..~. . 7 ,, ~

6 . ,, ,

7. Package containing:
a. Terry L. Harpster Statement, dtd 5/22/79
b. John d. Menning Statement, dtd 5/21/79
c. One page note containing names beginning with " Monday-Peter Baci" 8.. Draft Investigation re Apparent False Statements by Cincinnati Gas & Electric Co. Investigator: Peter E. Baci. DN:50-35,8. (missing p.14). .

- - 9. Ltr Borgmann fm Keppler, re inspection conducted by T. Harpster and to discussions of'our findings with Borgman, Salay, Schott dated 8/2/78.

Attachment:

and others,'Re' Region III, port No.50-358/78-11, for inspection on May 23-26 and June 22-23, 1978, by Inspector T. Harpster, dated -

7/31/78.

10. Ltr Borgman fm Fiorelli re inspection conducted by T. Harpster February 28 & March 1-3,1978, dated March 22, 1978.

Attachment:

Region III Report 50-358/78-06 at Wm. H. Zimmer Site, conducted

,. by T. L. Herpster on Feb. 28 and March 1-3, 1978.

11. Attachment 13A, Table of Contents" e m 4

e O

e e

e e

p . e.

^

, e e M

_.W:_- __- ' - - - -

l-

. f b

. .~ -

B. Draf t Investigation re Apparent False Statements by Cinci,nnati Gas '

- >- and Electric Co. , Investigator Peter E. Baci, No. DN: 50-358.

/:enelu;icas).

(w/c v onetssw.s C. Ltr Borgmann fm Keppler, re investigation conducted by P. Baci on -

May 21-24, 1979, at Zimmer Plant, dated August 3,1979

Attachment:

Region III, Report No. 50-358/79-21, Investigation on May 21-24, 1979 at Zimmer (w/ conclusions deleted). - ~

w/ attachments: Statements by T. Harpster; J. Menning; J. Schott and letter Borgmann to Keppler, dated May 18, 1979. .

. D. Affidavit of James C. Huwel.1. dtd 6/22/80. .

E. Witness List, Government Accountability Project, Zimmer, July 1980.

F. . Memo Clark fm Tom Devine, dtd 7/2/80, re 7/2/80 conversation with

~

~

Pat Dinsler on Zimmer Plant.

G. Memo Eastwood fm Government Accountability Project, dtd 10/30/80, re Suggested Checklist of Items to Evaluate Whether Reports Submitted

~

under 5 USC 1206(b)(3) Include Info Required by 5 USC 1206(b)(4).

+ H. Note to Commission fm Cummings, dtd 12/10/80, re T. Applegate's letter which was submitted by Government Accountability Project for review.

I. Memo Cummings fm Ahearne, dtd 12/15/80 re T. W. Applegate Allegations-

.rgst DIA conduct investigation to see if IE conducted adequate investigation re Zimmer. (w/ handwritten notations).

e M

1 j

i A

t -

s,

( )

I J. Ltr Ahearne fm Eastwood,-dtd 12/29/80, enclosing info transraitted l pursuant to 5 USC 1206(b)(2).

Attachments:

Ltr Eastwood fm Clark, 12/10/80 re GAP represanting T. Applegate 1.

in request for investigation re Zimmer

2. Ltr Eastwood fm Clark, dtd 12/15/80 re Applegate author-ized GAP to disclose his name to anyone-within Government. .
3. GAP Petition before the Office of Special Counsel of Merit Systems Protection Board-Request for an Investigation pursuant -

to 5 USC 1206(b)(7) on. behalf of Thomas Applegate.

. Exhibits! ..

il Region III, Report o.f Investigation No. 50-358/80-09 for the period April 7-9 and 30, and May 1-2 and 20, 1980 re Ziirnmer.

D e

e e

en e'

O C

9 O

e ,

e o

e e

e e

e f

L - _ _ . _. - __ -:

,c t.

g .) (*,

, 1

., .y ,

. ~g .

0 #2.. Ltr Cox.fm Al'temueble dtd 12/5/79, re CG&E checking ' possibility i of misconduct re construction at Zimer.

.p !3. Affidavit of Thomas W. Applegate, Jr. , dtd 6/6/80.

4 Reports and Sumaries (4) re Under Cover Investigative

  1. 4. Investiga at Zimer Plant, submitted by Major W. Cox.

i, "

Activitie s

-j #5.

Toll calls of Harry V. Means thru 3/10/80.

  1. 6. Ltr Applegate fm Phillip, dtd 3/11/80 re meeting on 3/3/80. ~-

G.c - #7. Portions of GA0 Report END-79-16 dtd 1/26/79.

fB. Portions of GAO Report EMD-78-80 dtd 9/7/78.

g

g. ' " #10. Transcription, Conversation between Appleg ,

elt. FBI Shifts Charges to NRC.

i 4 ,

  1. 12. Memo Clark fm Devine, dtd 6/13/80 re Verification of Allegations in Applegate's 6/6/80 Affidavit: Riga Giordano.

$ #13. Memo Clark fm Devine, dtd 6/12/80 re Verification of Allegations Joan Means.

y in T. Applegate's 6/6/80 Affidavit:

v e

9 e e e

9 4

e 9

S. ,

I

  1. a t

4 f . .

i- .

, , _ .- - _ ._.._-._,...._._.._,-.-._...._..,..._......____...-._,..s

P , . ..

.,'c

  • K '. Memo Ahearne fm Cummings, dated 1/5/81, re Thomas W. Applegate Allegations.

. C. Memo Cummings fm Ahearne dated 1/7/81, re Office of Special Counsel.

Letter of 12/29/80 rqsts NRC report by early March.

'"M. Memo Phillip fm Stello, dtd 1/16/81, re Merit System Protection Board Charges by IPS

. N. Report. of Meeting between OIA & IE, Region III (draft dtd 1/19)

0. Memo Keppler.fm Fortuna, dated 1/29/81, re Confidentiality and -

Restriction of Info forwarded by OIA P.- Memo Schnebelen & Sinclair fm Devine, dtd 2/4/81 re Witness List from January 28-31 Cincinnati Visit

~

Attachments:

- 1. Affidavit Jeffrey J. Hyde dtd 1/31/81 -

2. Affidavit - Stephen D. Harris, dtd 1/31/81
3. Affidavit - Edwin P. Hofstadter, dtd 1/29/81
4. Affidavit - Thomas Dean Martin, dtd 4/28/79
5. Affidavit - Gorman L. Reynolds, dtd 5/21/79
6. Affidavit - Robert Anderson, dtd 5/22/79 ,

7.Zimmsda90ppression Pool Problems, dtd 1/?5/81, as related by Donald O' Daniel.

8.Ltr Anders fm Hofstadter, dfd 8/18/78 reporting nonconformance to

- 10CFR50 requirements & specifications at Zimmer.

9. Statement of Edwin Hofstadter, undtd.
10. Report of Findings at Husky Product, INc. on 10/30/74 submitted by Lee Spievack.
11. Husky - Sequence of Events, dtd 10/26/78.

' 12. Affidavit - Donald Blanch, dtd 6/26/79.. ~

' 13. Ltr Borgmann im Heishman, dtd 12/21/78, re investiaation conducted by IE, Shp- 12-22 & 22 29, 1978 at Z{Irmer Attachments: Appendix A - Notice of Violation ~ ~

Region III Report of Investigation No. 50-358/78-21.

9 S

4 o

  • I l i j

I I ,

. - . ...o . . . - . .. ,

) __

- e -

7.. . ,.s..

7 Q. Ltr Clark fm Cumnings, dtd 2/4/81, re confirming meeting between GAP & OIA.

R. Memo Stello fm Cummings, dtd 2/10/81, re Transfer of Documentation Provided by Government Accountability Project (2/9/81). -

~

S. Me:..o Clark fm Devine, dtd 2/11/81, re Summary of 2/1/81 Telephone Interview w/Vic Griffin.

T. Memo Clark fm Devine, dtd 2/11/81, re Summary of 2/1/81 Conversation w/ Tom Martin.

U, Report of Interview - James F. Donahue. (Draft dtd 2/23)

V .' Memo Stello fm Keppler, dtd 3/17/81, re Investigation of Applegate Allegations Related to Zimmer, w/ handwritten notationsbhy .

~ "

Davis & Cummings.

Memo Commission fm Fitzgerald, dtd 3/18/81, re jurisdiction of Merit W.

Systems Prorection Board over Applegate Allegations:

Attachment:

Justice Dept. Opinion.

X. Note to Art fm Dave, dtd 3/24 re Cumings asked for breakdown of GAP /Applegate allegations to show which being handled by IE & which '

. by 01A.

Note to Dave fm Art, no date, no further action necessary.

Draft-Allegations Raised in GAP Documents.

Y. Interview of Terry Harpster (draft, dtd 3/30/81.)

Z. ' Draft Report of Investigation, dtd 4/6.

~

AA. ~ Master Copy .of Summary, dtd 4/7/81

-- BB. Draft Master Copy of Report, dtd 7/7/81. (2. venhn3 [d b t "

-- CC. Pages 38-46 of report with handwritten notation to eliminate them from report.

- DD. Listing of Welding Documentation (Draft dtd 7/14/8T)

  • O e

D G

e e

t 4

+ = -- -,-.,m m,m, -, e , , - ,,. . . , , , _ , , . ,

c.

. \

)a

. > s.

_ ... j

- EE. Note Jim and Art from John, dated 7/16/81, attaching for their review " Review of Welding Records" Report re Zimmer (draft section of report).. _

FF. Ltr Cummings fm Tracey, dtd 7/20/81 re Tracey AUSA conducting

- Zimmer investigation & wishes to be advised of status & completion date.

-GG. Review of Welding Records (draft section of report), dtd 7/22,w/ notations.

, y HH. Review of IE Inspector's Manual (draft seciton of report), dtd 7/22 w/ notation

- II. Marked Up Copy (Gamble's) of Final Report re Special Inquiry of Adequacy of IE Investigation 50-358/80-9 at the William H. Zimmer Nuclear Power Station. , undtd. w/ interviewee's comments on reinterview noted in margins. y JJ. . Memo Commission fm Cummings, dtd 8/6/81 re Cummings personal response to allegation about him.

KK. Memo Commission fm Cummings, dtd 8/7/81 w/ enclosed final report of investigation re Adequacy of JE Investigation 50-358/80-09 at the William H. Zimmer Nuclear Power Station also dtd 8/7/81.

LL. Note to Dave fm John, dtd 8/10/81, discussed annotations with George & explained purpose. CE". -

1. .

MM. Ltr Tracey fm Cummings, dtd 8/17/81 enclosing copy OIA's report of investigation re Zimmer.

NN. Note to Thompson fm Schnebelen, dtd 8/19/81, attaching copy OIA's report of investigation re allegations by Applegate re Zimmer.

--- 0 0. Draft E : mary of Report, undated w/ nota tions.

- FP. Draf t Review of Weld Docunientation Package for i.' tid Cy 606, undtd

- QQ. Draft Paragraph for report re OIA review of weld packages . .

- RR. Review of Welding Records d af t section of report) undtd.

- SS. Draf t report, - ~7 hf/r eport undtd w/ notations.

TT. Draft of Details section o

>- UU . Draft - Summary of Report

- VV. Draft - Summary of Report

- WW. Draft'- Summary of Report w/ portions marked that were later deleted from final. ,

noN N'%

.. - xy. %ff f e p) a d Tre wdibl m wra.~}v. -- a- bk e

- yy WA /2q t ~< /<M "Arke @}  : ,

- 2 z. %kA g Gy (susde2s). od FL( (&(~&, JM,

~(: %.'ese 's c-< .h e- rotkn & ; ,.,

Ahh. LLA f~yy k by J. G s, 2 l l

O s .l u-- -

-.s s. , , ,m 4 _