Responds to NRC Re Violations Noted in Insp Repts 50-327/92-02 & 50-328/92-02.Corrective Actions:Number of Satellite Drawing Locations Drastically Reduced & self-audit of Files Completed
ML20090M507
Person / Time
Site: Sequoyah  
Issue date: 03/19/1992
From: Joshua Wilson
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9203240277
Download: ML20090M507 (5)


Text

.

k n.ong,. m. 2

,, n wo n < -

.,,s,,

ou Jt h3n n.s

,mn

,4

, _e r..

March 19, 1992 U.S. Nuclear Regulatory Coteission ATTN:

Document Control Desk Washington, D.C. 20555 centlemen:

In the Matter of

)

Docket Nos. 50-327 Tennessee Valley Authority

)

50-328 SEQUOYAH NUCLEAR PLANT (SQN) - NRC INSPECTION REPORT NOS. 50-327, 328/92 RESPONSE TO NOTICE OF VIOLATION (NOV) 50-327, 328/92-02-01 contains TVA's response to Bruce A. Wilson's letter to Dan A. Nauman dated February 18, 1992, which transmitted the subject NOV.

This violation concerned a lack of control of drawings available for use by operators in the turbine and auxiliary buildings. TVA's response includes actions taken to ensure that the drawings available for operator use in the plant are appropriately controlled to ensure their accuracy in reflecting plant configurations. contains a summary of commitments made in this submittal.

If you have any questions concerning this submittal, please telephone M. A, Cooper at (615) 843-8924 Sincerely,

_m

[V -

llL. Wilson

/JL/

Enclosutes cc:

See page 2 I

[

9203240277 920319

)@

t l

DR ADOCK 05000327 PDR

U.S. Nuclear Regulatory. Commission-Page 2 March 19, 1992 Enclosures cc (Enclosures):

Mr.1D. E. LaBarge, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North

-11555 Rockville Pike Rockville, Maryland 20852 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379 Mr. B. A. Wilson, Project Chief U.S. Nuclear Regulatory. Commission Region II

.101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 9

%_ _..~~,

-,_c.

- -, -h -

+,

-+f-

ENCLOSURE 1 RESPONSE TO NRC INSPECTION REPORT 4

NOS. 50-327/92-02 AND 50-328/92-02

-BRUCE A. WILSON'S LETTER TO DAN A. NAUMAN DATED FEBRUARY 18, 1992 Violation 50-327. 328/92-02-01

" Technical Specification 6.8.1 requires that procedures recommended in

-Appendix A of Regulatory Guide 1.33. Revision 2, be established, implemented and maintained. This includes procedures for operation and control of safety-related systems. The requirements of TS 6.8.1 are implemented, in part, by the following procedure:

" Site Standard Practice (SSP) 10.1, Controlling Drawings, Revision 0, details the licensee's administrative controls for drawing updates and maintenance.

Section-3.4.D requires, in part, that controlled drawing holders ensure that controlled drawings are received, properly filed, receipt acknowledged, and maintained in a current state.

Section 3.7.B additionally requires the Document Control and Records Management manager-to ensure the proper stamp (labeled as controlled) is placed in red ink on the drawings.

" Contrary to the above, numerous examples of improperly filed drawings (interfiling of same drawing with different revisions), examples of uncontrolled drawings, and examples of improperly labeled drawings were identified at controlled drawing stations in the Auxiliary Turbine, and other buildings and were available for use by operators.

"This is a Severity Level IV violation (Supplement I)."

Admission TVA admits the'violati n.

I i

Reason for the Violation The Document Control and Records Management (DCRM) organization is responsible for distributing new and revised drawings.. Distribution is accomplished in two ways: 'The first way is for DCRM personnel to personally insert the new or

. revised drawings in the drawing holders and remove the outdated drawings; the second way is.through' distribution to the responsible line. organization for-filing. -DCRM personnel are trained and cognizant of their duties;-it was L

determined thst the recipients of: the distributed drawings-of ten delegate the l

. filing-to clerks who are not trained and are not cognizant of the-importance l

of having.apdated drawings filed correctly and'in a timely manner.

The l

drawings located on-Elevation 669 of the auxiliary building were normally i

updated by clerks who had not received any training or instructions as to the importance of correctly filing drawings in a' timely manner. As a result.

drawings in the-auxiliary building were not always-filed in a proper and timely-manner. Through further review, it_was determined!that drawing locations in other. buildings not maintained by DCRM personnel-were;also affected by the same-problem.

r-n

    • T$

mee e

. - -. -. -.. _ -.. -. _ -. ~ ~ _..

O

_2 Corrective Steps That Have Been Taken and Results Achieved i

Operations requested that only flow and-logic diagrams necessary for plant operations be assigned to the drawing locations in the auxiliary and turbine buildings. As requested, a complete new set of controlled drawings was placed in each location.

The Site Quality organirstion was requested to perform an audit on several

. drawing locations to identify any other drawing discrepancies. This resulted in DCRM initiating a problem evaluation report to correct and document the discrepancies pointed out by Site Quality.

DCRM transmitted a request to drawing location owners to perform an audit of

-the files and request replacement drawings for any damaged, outdated, or missing drawings.-_ This self-audit has been completed with only minor discrepancies noted. These discrepancies have been corrected.

DCRM will perform a confirmatory audit of-the satellite drawing locations.

Corrective Action Taken to Prevent Recurrence The number of_ satellite drawing locations has been drastically reduced and DCRM has been assigned the responsibility to file and maintain all but one controlled drawing location onsite at Sequoyah. The responsible owner of the one drawing location still on a mailing distribution is now procedurally-required to return outdated drawings with the receipt acknowledgement.

Organization personnel have been trained and are cognizant of their responsibility for maintaining up-to-date drawings.

Site Quality will_ periodically monitor the control of drawings.

Date When Full Compliance Will I>e Achieved DCRM will perform a confirmatory audit by April 13, 1992, of the satellite drawing locations to verify compliance.

4 i

ENCLOSURE 2

+

o Commitment Document Control and Records Management will perform an audit of the satellite drawing locations by April

'J.

1992.