Discusses Status of Mods Being Made to Mitigate Consequences of Interior Flooding at Plant
ML20090L710
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 12/10/1975
From: Mayer L
NORTHERN STATES POWER CO.
To: Ziemann D
Office of Nuclear Reactor Regulation
References
13859, NUDOCS 9102120552
Download: ML20090L710 (3)


Text

.*

NSX2 3

NORTHERN STATES POWER COMPANY M I N N E A P o l.l e. M I N N E S O T A 88401 December 10, 1975 ea g

Q.,'

y/p/g

~

g, V.:

.[Y k

't

7 M r.

D.

L.

Ziemann, Chicf Ope rat ing Reac tors liranch # 2

/').

V Division of Reactor Licensing

q,,

g U.S. Nuclear Regulatory Conraission 4

Washington, DC 20555 e

Dear Mr. Ziemann:

MONTICELLO NUCLEAR GENEPATING PIANT Docket No. 50-263 License No. DPR-22 Status of Modifications Ileing Made to Mitigate the Consequences o f In te rio r F'. coding a t tit Monticello Nuclear Generating Plant in correspondence dated September 28, 1972, August 24, 1973, and September 10, 1973, Northern Ststes Power Company responded to an inquiry f rom the Commission to evaluate tio potential for interior flooding at the Monticello Nuclear Generating Plant.

The conclus-ions of this evaluation were that* no single pipe failure with re-sultant water flooding will prevent safe reactor shutdown or cause the loss of redundant engineered safety systems.

Two modifica-sC Q,'7 G

tiens were identified, however, which were desirable, to enhance engineered safety system redundancy.

These modifications were:

ti,g.

CN a.

Flood probes in the condenser hotwell area and in q' g g the circulating water pump bay with alarms in the

,O control room and automatic trip of circulating gi va p

water pumps on high 1cvel in either acca.

A

-n I

b.

Upgrading of the c 7ndensate transfer lines in

/y the Reactor 11uilding basement and HPCI Room to seismic category I equivalent.

These modifications were completed during the Autumn 1975 refueling outage with the exception of the automatic circulating water pump trip.

Ilecause of delays in the equipment procurement process, nec-essary material was not available to complete this portion of the 13859 9102120552 751210 PDR ADOCK 05000263 p

PDR

d NORTHERN OTATED POWER COMPANY l

Mr.

D.

1,. 7,lemann 2

Th?cember 10, 1975 planned modifications.

1,evel ala nns were installed in the con-denser hotwell area and in the circulating water pump bay and will annunciate in the Control Room in the event of flooding to pennit a Control Room Operator to manually trip the circulating water pumps.

The necessary material to complete work on the a:*nmatic trip feature is now available at the plant.

This portion of the modi-fication will be completed during the next scheduled plant out-age of seven days or longer duration.

In addition, a thorough inspection of all rubber expansion joints used in the circulat-ing water system was conducted during the Autumn 1975 refueling outage.

Very t ruly yours, L.

O.

Mayer, PE Manager, huclear Support Services int /ItN/ deb cc:

1. G. )*cppler G. Charnoff tipCA Attn:

J. W.

Fe nnan I

s r

A

. NRC DISTRIBU TION FOR PART 50 DOCKET MATERI AL

' (TEMPORARY f ORM)

CONTROL NO: / 3 G ', L FILE:

FROM: Nortnetn states Power Co DATE OF DOC DATE REC'D LT R TWX RPT OTHER Minneaputas, Mn L Q._Mayn ll-LR- />

2

._ _ g - t -j.) _,,

XL TO:

ORIG CC OTHER SENT NRC POR _

xx Mr ziemann one signeo SENT LOCAL PDR.

xx CLASS UNC L ASS PROPINFO INPUT NO CYS REC'D DOCKET NO:

xxxxxx i

50-20J DFSCRIPTION:

ENCLOSURES:

Ltr te (nert lors utu y-28-72, 8-24-/J,

/-10-/3........tusnasnsng into con:erning status of modifications being made to mitigate the con-sequences of interior flooding at tponticello....

PL ANT NAME: Monticello

~

~

FOR ACTION /l((FC R'MATlON 12-13-75 ehf DUTLE R (tJ SCHWENCE R (L) ZIEff ANN (L)

REG AN (E)

REID(L)

W/ Copies W/ Copics

/ WCCopies W/ Copies W/ COPIES CLARK (L)

STOl 7 (1 )

DICKFR (F)

LE AR (I.)

W/ Copies W/ Copies W/ Copies W/ Copics PAR R (L)

VASSAL LO (L)

KNIGHTON (E) spits W/ Copies W/ Copies W/ Copics -

W/ Copies KNIEL (L)

PURPLE (L)

YOUNGBLOOD (E)

Lpjt W/ Copics W/ Copies W/ Copics W/ T3iiiss INTERNAL DISTRIBUTION M

TECH REVIEW DENTON LIC / SST A/l IND gNBC PDR SCHRUEDER GRIMES p R. DIGGS (L)

B R AI f M AN

',X)GC, ROOM P 506A MACCARY GAMMILL H. GE ARIN (L)

SAL T7M AN COSSICK/ST AT F KNICitT K ASTN E R E; GOULBOURNE (L)

MELTZ CASE PAWLICit t BALLARD P. KREUTZER (E)

GI AMBUSSO SHAO SPANGLER J. LEE (L)

PLANS BOYD ST E L t.O M. nvy,innoo;-(L)

MCDONALD MOORE (L)

HOUSTON

. E N V I R.O.

S. REED (E)

CHAPMAN DEYOUNG (L)

NOVAK Mut LER M. SERVICE (L)

DUBE (Ltr)

SKOVHOLT (L)

ROSS DICK E R S. SHEPPARD (L)

E. COUPE GOLLE R (L) (Ltr)

IPPOLITO KNIGHTON M. SLATER (E)

PETERSON P. CO L LINS TEDESCO YOUNGBLOOD H. SMITil (L)

HARTFIELD (2)

DENISL J. COLLINS REGAN S. TE ETS (L)

KLECKER

. REG.OPfl.

L AIN AS OJE DR G. Wil LI AMS (E)

EISENHUT

/ flLE & HEGION (2)

BE N AROYA k~

V WILSON (L)

WIGGIN10N 1Dic VOLLMER W SS R. INGR ' 4 (L)

}{. DVDC AN (f)_

EXTEr<N AL DISTRIBUTION 1

9 h +.D

/ - LOCAL PDR]7).on cc!1)(2)(10) - N ATtONAL LAGS 1 - PDR SAN /L A/NY 1 - TIC (ABE RN ATHY) 4 - NSIC (BUCHANAN) 1 - W. PENNINGlON, Ani E 201 GT 1 - DROOKHAVEN NAT LAB 1 - ASLB 1 - CONSU LT AN1 S 1 - G. ULRIKSON ORNL 1 - Newton Anderson NEWM ARK /BLUME/AG B ABI AN

-# - ACRS HetAMNO7 BENT hv

-rc. a b y s f,

/