ML20090L710
| ML20090L710 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 12/10/1975 |
| From: | Mayer L NORTHERN STATES POWER CO. |
| To: | Ziemann D Office of Nuclear Reactor Regulation |
| References | |
| 13859, NUDOCS 9102120552 | |
| Download: ML20090L710 (3) | |
Text
.*
NSX2 3
NORTHERN STATES POWER COMPANY M I N N E A P o l.l e. M I N N E S O T A 88401 December 10, 1975 ea g
Q.,'
y/p/g
~
g, V.:
.[Y k
't
- 7 M r.
D.
L.
Ziemann, Chicf Ope rat ing Reac tors liranch # 2
/').
V Division of Reactor Licensing
q,,
g U.S. Nuclear Regulatory Conraission 4
Washington, DC 20555 e
Dear Mr. Ziemann:
MONTICELLO NUCLEAR GENEPATING PIANT Docket No. 50-263 License No. DPR-22 Status of Modifications Ileing Made to Mitigate the Consequences o f In te rio r F'. coding a t tit Monticello Nuclear Generating Plant in correspondence dated September 28, 1972, August 24, 1973, and September 10, 1973, Northern Ststes Power Company responded to an inquiry f rom the Commission to evaluate tio potential for interior flooding at the Monticello Nuclear Generating Plant.
The conclus-ions of this evaluation were that* no single pipe failure with re-sultant water flooding will prevent safe reactor shutdown or cause the loss of redundant engineered safety systems.
Two modifica-sC Q,'7 G
tiens were identified, however, which were desirable, to enhance engineered safety system redundancy.
These modifications were:
ti,g.
CN a.
Flood probes in the condenser hotwell area and in q' g g the circulating water pump bay with alarms in the
,O control room and automatic trip of circulating gi va p
water pumps on high 1cvel in either acca.
A
-n I
b.
Upgrading of the c 7ndensate transfer lines in
/y the Reactor 11uilding basement and HPCI Room to seismic category I equivalent.
These modifications were completed during the Autumn 1975 refueling outage with the exception of the automatic circulating water pump trip.
Ilecause of delays in the equipment procurement process, nec-essary material was not available to complete this portion of the 13859 9102120552 751210 PDR ADOCK 05000263 p
d NORTHERN OTATED POWER COMPANY l
Mr.
D.
1,. 7,lemann 2
Th?cember 10, 1975 planned modifications.
1,evel ala nns were installed in the con-denser hotwell area and in the circulating water pump bay and will annunciate in the Control Room in the event of flooding to pennit a Control Room Operator to manually trip the circulating water pumps.
The necessary material to complete work on the a:*nmatic trip feature is now available at the plant.
This portion of the modi-fication will be completed during the next scheduled plant out-age of seven days or longer duration.
In addition, a thorough inspection of all rubber expansion joints used in the circulat-ing water system was conducted during the Autumn 1975 refueling outage.
Very t ruly yours, L.
O.
Mayer, PE Manager, huclear Support Services int /ItN/ deb cc:
- 1. G. )*cppler G. Charnoff tipCA Attn:
J. W.
Fe nnan I
s r
A
. NRC DISTRIBU TION FOR PART 50 DOCKET MATERI AL
' (TEMPORARY f ORM)
CONTROL NO: / 3 G ', L FILE:
FROM: Nortnetn states Power Co DATE OF DOC DATE REC'D LT R TWX RPT OTHER Minneaputas, Mn L Q._Mayn ll-LR- />
2
._ _ g - t -j.) _,,
XL TO:
ORIG CC OTHER SENT NRC POR _
xx Mr ziemann one signeo SENT LOCAL PDR.
xx CLASS UNC L ASS PROPINFO INPUT NO CYS REC'D DOCKET NO:
xxxxxx i
50-20J DFSCRIPTION:
ENCLOSURES:
Ltr te (nert lors utu y-28-72, 8-24-/J,
/-10-/3........tusnasnsng into con:erning status of modifications being made to mitigate the con-sequences of interior flooding at tponticello....
PL ANT NAME: Monticello
~
~
FOR ACTION /l((FC R'MATlON 12-13-75 ehf DUTLE R (tJ SCHWENCE R (L) ZIEff ANN (L)
REG AN (E)
REID(L)
W/ Copies W/ Copics
/ WCCopies W/ Copies W/ COPIES CLARK (L)
STOl 7 (1 )
DICKFR (F)
LE AR (I.)
W/ Copies W/ Copies W/ Copies W/ Copics PAR R (L)
VASSAL LO (L)
KNIGHTON (E) spits W/ Copies W/ Copies W/ Copics -
W/ Copies KNIEL (L)
PURPLE (L)
YOUNGBLOOD (E)
Lpjt W/ Copics W/ Copies W/ Copics W/ T3iiiss INTERNAL DISTRIBUTION M
TECH REVIEW DENTON LIC / SST A/l IND gNBC PDR SCHRUEDER GRIMES p R. DIGGS (L)
B R AI f M AN
',X)GC, ROOM P 506A MACCARY GAMMILL H. GE ARIN (L)
SAL T7M AN COSSICK/ST AT F KNICitT K ASTN E R E; GOULBOURNE (L)
MELTZ CASE PAWLICit t BALLARD P. KREUTZER (E)
GI AMBUSSO SHAO SPANGLER J. LEE (L)
PLANS BOYD ST E L t.O M. nvy,innoo;-(L)
MCDONALD MOORE (L)
HOUSTON
. E N V I R.O.
S. REED (E)
CHAPMAN DEYOUNG (L)
NOVAK Mut LER M. SERVICE (L)
DUBE (Ltr)
SKOVHOLT (L)
ROSS DICK E R S. SHEPPARD (L)
E. COUPE GOLLE R (L) (Ltr)
IPPOLITO KNIGHTON M. SLATER (E)
PETERSON P. CO L LINS TEDESCO YOUNGBLOOD H. SMITil (L)
HARTFIELD (2)
DENISL J. COLLINS REGAN S. TE ETS (L)
KLECKER
. REG.OPfl.
L AIN AS OJE DR G. Wil LI AMS (E)
EISENHUT
/ flLE & HEGION (2)
BE N AROYA k~
V WILSON (L)
WIGGIN10N 1Dic VOLLMER W SS R. INGR ' 4 (L)
}{. DVDC AN (f)_
EXTEr<N AL DISTRIBUTION 1
9 h +.D
/ - LOCAL PDR]7).on cc!1)(2)(10) - N ATtONAL LAGS 1 - PDR SAN /L A/NY 1 - TIC (ABE RN ATHY) 4 - NSIC (BUCHANAN) 1 - W. PENNINGlON, Ani E 201 GT 1 - DROOKHAVEN NAT LAB 1 - ASLB 1 - CONSU LT AN1 S 1 - G. ULRIKSON ORNL 1 - Newton Anderson NEWM ARK /BLUME/AG B ABI AN
-# - ACRS HetAMNO7 BENT hv
-rc. a b y s f,
/