ML20090J485

From kanterella
Jump to navigation Jump to search
Historical Data Summary of the Systematic Assessment of Licensee Performance
ML20090J485
Person / Time
Issue date: 02/29/1992
From: Allenspach F
Office of Nuclear Reactor Regulation
To:
References
NUREG-1214, NUREG-1214-R09, NUREG-1214-R9, NUDOCS 9203170266
Download: ML20090J485 (123)


Text

.

NUREG-1214 -

Revision 9 Historica Data Summary o:?

the Sys
ematic Assessment of Licensee Per:'ormance q-I i

i s

t l

U.S. Nuclear Regulatory Commission Ollice of Nuclear Reactor Regulation

,p**"'c09,

?q E

J u.

+.

, y

., -. ~

.n..

~

DA 7l

/

1 AVAILABILITY NOTICE Avauability of Reference Materials' Cited in NRC Publications Most documents cited in NRC pubbcations :will be available from one. of: the following j sources:

1 The NRC Pubbe Document Room. 2120 L Street, NW., Lower Level, _Washingtoni DC ;

20555 2.

The Superintendent of Documents. U.S. Government Printing Office, P.O. Box 37082, J

Washington, DC 20013 7082-3.

The National Technical Information Sentice, Springfield, VA 22161 Although the listing that follows represents the majority of documents cited in NRC publica.

tions, it is not intenced to be exhaustivo, Referenced documents available for inspection _ and copying for a fee from_ the _NRC Public Document Room include NRC correspondence and intemal NRC memoranda: NRC bulletins l-circulars, information notices, inspection and investigation notices; licensee event reports; vendor reports and correspondence; Commission papers; and applicant and hcensee docu-P ments and correspondence.

The following documents in the NUREG series are available for purchase from the GPO Sales Program: formal NRC staff and contractor reports, NRC sponsored conference pmceed-ings, international agreement reports, grant publications, a.nd. NRC booklets and brocnures.

Also available are regulatory guides, NRC regulations in the Coce of Fectoral Regulat/ons,.

and Nuclear Regulatory Commission Issuances.

Documents available from the Nationa! Technical information Service include NUREG-series reports and technical reports prepared by othe_r Federal agencies and reports prepared by _

the Atomic Energy Commission, forerunner agency to the Nuclear Regulatory Commission.-

Documents available from public and special techn: cal libraries include all open hierature -

items, such as books, journal articles, and trar.sactions. Fectoral Register notices, Federal:

and State legislation, and congressional reports can usually be :obtained. from these =

libraries.

Documents such as theses, dissertations,. foreign reporte and translations, and non-NRC -

conference proceedings-are available for _ purchase from the. organization sponsoring thei pubhcation cited.

- Single copies of NRC draft reports are available free, to the extent of supply, upon written -

. request to the Of fice of Administration Distnbution and Mail Services Sectioni U.S. Nuclear.

Regulatory Commission, Washingtorb DC ~ 20555.

Copies of industry codes and standards used in a substantive manner in the NRC regulatory process are, maintained at the NRC Library, 7920 Norfolk Avenue, Beth_esda, Marylandi for -

-- use by the public. Codes and standards are usually copyrighted and may be purchased -

~

from the originating organization or,-if they are American National Standards, from the

- American National Standards institute,1430 Broadway,- New York, NY.10018.

n e-u-^9 4

%-+ - - -

}

F-e-

.P e

f e-Ww 4

NUREG-1214; Revision 9 Historical Data Summary of the Systematic Assessment of Licensee Perfor.mance Manuscript Completed: February 1992 Date Published: February 1992

=

F. Allenspach Division of Licensee Perfonnance and Qual!44 Evaluation Omce of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 1

,s* **%

i l

ABSTRACT The Historical Data Sumary of the Systematic Assessment of License

  • Perform-ance (SALP) is produced periodically by the U.S. Nuclear Regulatory Comission.

This sumary provides the re'sults of t' e-assessment fer each f6cility by NRC n

region and is further divided into the following. sections:

Section 1 presents the most recent SALP report ratings for facilities in operation and under con-struction.

Section 2 presents a chronological listing of til SALP report ratings for each operating facility.

Section 3 preserts e chronolo listing of all SALP report ratings for each facilit) under construction.gir.a1 For historical purposes, past construction ratings for facilities thrt recently have been licensed also are listed in Section 3.

/

NUREG-1214 111

. -__ __ J

h TARLE CF CONTENTS fJUL' Introduction vii Section 1, SALP Surnn ary: Most Recent Ratings 1-1 Section 2, SALP History: facilities In Operation 2-1 Section 3, SALP History: f acilities Under Construction 3-1 i

l l

NUREG-1214 v

L

INTRODUCTION Organization The Historical Data Sunniary of the Systeniatic Assessment of Licensee Perf or-mance (SALP) is produced periodically by the U.S. Nuclear Regulatory Com.ission (NRC).

This suuiary provides the results of the assessnient for the period July 1,1991 through December 31, 1991.

The results are presented for each f acility in three sections and are further divided by NRC region.

Section 1 presents the most recent SALP report ratings for facilities in operation and under construction.

Section 2 presents a chronological listing of all SALP report ratings for each operating f:.cility. Section 3 presents a chronological listing of all SALP report ratings for each facility under construction.

for-historical purposes, past construction SALP ratings for facilities that recent-ly have been licensed also are listed in Section 3.

Background

The SALP program is an integrated NRC staff effort to collect and evaluate observations and data to assess and better understand the reasons for a licen-see's performance.

The program is described in Manual Chapter 0516, which was revised in June 1988, in August 1989, anc again in September 1990.

The purpose of the program is to assess licensee performance in selected functional areas.

Prior to the June 1988 revision tv the Manual Chapter, )the areas for f acilities in operation generally included plant operation (OPS, radiological controls (RADCON), maintenance (MAINT), surveillance (SURV), energency preparedness (EP), fire protection (FP), security (SEC), outa and adoiinistrative controls affecting quality (QP)ges (0UTG), quality programs

, licensing activitiet (LIC),

and training and qualification effectiveness (TRG).

These functional areas were revised in nua.ber and scope in the June 1988 revision. For facilities in operation that have been evaluated since the June 1988 revision to the Manual Ch apter, the areas generally include plant operations (OPS), radiological controls (RADCON), maintenance / surveillance (M/S)(ET),

emergency preparedness (EP),

security (SEC), engineering / technical support and safety assessment /

quality verification (SQ).

The functional areas for f acilities unCer construction, prior to the June 1988 revision to Manual Chapter 0516, are soils and foundations (SF); containment, safety-related structures, and wiajor steel supports (CONT); piping systems and supports (PIPE); kafety-related coniponents (SRC); auxiliary systems (AUX);

electrical equipment and cables (ELEC); instrumentation (INST); design engi-neering (DSN); quality assurance and adniinistrative controls affecting quality (QA); and licensicu activities (LIC).

The functional areas under the June 1988 revised Manual Chapter 0516 are soils and foundations; containment, major structures and niajor steel supports; piping systems and supports; NUREG-1214 vii

mechanical c omponents auxiliary systems elec trical equipment and cables instrumentation engineering / technical support; and safety assessment / quality verification.

However, no SALPs of f acilities under ' construction have been cortpleted under the reviseo Manual Chapter.

I Based on a review of the consolidated information, each evaluated functional area is placed into one of three performance categories.

A Category 1 rating designates a superior level of performance where reduced NRC attention may be appropriate.

A Category 2 rating designates a good leve) of performance where NRC attention should be maintained at normal lev els.

A Category 3 rating designates an acceptable level of performance where NRC will consider increased levels of inspection effort.

An

  • N" indicates that no rating was given for that category because of lack of meaningful data or the functional area is not appropriate for this SALP cycJe.

An "X" in place of a category rating indi-cates that a rating was not given for a reason other than that corresponding to an "N. " The reason for an "X" is provided with a footnote in the SALP liistory and explained in detail in the SALP report.

i NUREG-1214 viii

Section 1 SALP Summary: Most Recent Ratings I

l l

NUREG-1214 1

l-

. = _.

SALP-

SUMMARY

REGION 1 REACTORS IN OPERATION PLWT N/J:E RPT OPS RAD 00N M/S EP SEC ET SO

____________________;_________!___l____.__

..__l___; _l___l PEAVER VALLEY 1/2 05/03/91 1

2 1

1 1

2 1

CALVERT CLIFFS 1/2 06/11/91 2

2 2

2 1

2 2

FITZPATRICK 07/24/91 2

3 2

1 1

2 3

GINNA 12/11/90 2

2 2

1 2

2 2

HAD0AM NECK 11/29/91 1

1 2

1 1

1 l '-

HOPE CREEK 1 11/29/90 1

1 2

1 1

1 1

INDIAN FOINT 3 10/16/91 2

1 2

1 2

2 2

INDIAN POINT 2 09/20/91 1

2 2

2 1

2 2

LIMERICK 1/2 02/08/91 1

1 1

2 1

2 1

MAINE YANKEE 06/24/91.

1 2

1 2

2 2

2 MILLSKtE 2 05/28/91 1

2 2

1 1

2 2

MILLSKtE 1 05/28/91 1

2 1

1 1

2 2

MILLSK4E 3 05/28/91 2

2 1

1 1

2 2

NINE MILE POINT 1/2 08/02/91 2

2 2

1 1

2 2

OYSTER CREEK 08/26/91 2

2 2

1 2

2 2

PEACH IKTPICM 2/3 12/11/91 2

2 2

1 ~ 1 2

2 PIIGRIM 1 12/26/91 2

1 2

1 1

2 2

SALDI 1/2 11/29/90 2

2 2

1 1

2 2

SEABROOK 1 01/31/91 2

2 2

1 1

2 2

SUSQUEHANNA 1/2 03/21/91 1

2 1

1 1

2 1

THREE MILE ISLAND 1 10/09/90 1

1 1

1 1

1-1 VEftKNT YANKEE 1 07/03/91 1

2 1

1 2

1 1

YANKEE-RG E 1 05/20/91 2

1 2

1 1

2 1

NUREG-1214 1-1

REACTORS UNDER CONSTRUCTION PLAlU HAME RPT SF C0tc PIPE SRC AUX ELEC INST DSN QA LIC

_________;___;____l____;___;____g

___g____;___l___;___

NURB3-1214 1-2 1

- - - ~. -. -. -

SALP

SUMMARY

REGION 2 REACTORS IN OPERATION ILA!U tWIE RPT OPS RADCCN N/S EP SEC ET SQ

____________________;_________;___g______;_____;____;___l___l___l BRCWNS FERRY 1/2/3 08/20/90 2

1 3

2 2

2 3

BRUNSWICK 1/2 01/24/91 2

2 2

2 1

3 2

CATAWBA 1/2 05/31/91 2

2 2

1 1

2 2

CRYSTAL RIVER 3 07/31/91 1

1 2

1 2

2 2

FARLEY 1/2 05/10/91 1

1 1

2 2

2 1

GRAND GULF 1 05/31/91 1

1 1

1 1

1 2

RARRIS 1 09/19/91 1

1 2

1 1

1 1

HATCH 1/2 07/12/91 1

2 2

1 2

2 1

M0GUIRE 1/2 05/02/91 2

1 2

1 1

1 1

NORTH ANNA 1/2 12/21/90 1

2 2-1 2

1 1

000 NEE 1/2/3 11/30/90 1

1 2

1 2

1 2

ROBItGON 2 07/22/91 2

1 2

2 1

2 2

S MUOYAH 1/2 10/03/91 2

2 2

1 1

2 2

ST LUCIE 1/2 01/11/91 1

1 2

1 1

1 1

SLMiER 1 11/05/91 1

1 1

2 1

2 1

SURRY 1/2 07/02/91 2

1 2

1 1

2 2

TURKEY POI!E 3/4 12/12/91 1

2 2

1 1

2 1

V0GTLE 1/2 11/25/91 2

1 2

2 2

2 2

t NURB1-1214 1-3

t REACTORS UNDER CONSTRUCTION PLA!E !UEE RPT SF 00tR PIPE SRC AUX ELEC INST IEN QA LIC

___l_. _;-__ :...:..__:...;

...l...;

..;-..l BELLEF0tRE 1/2 09/17/85 N

2 1

N 2

2 2

N 2

N GRAND GULF 2 0.7/23/85 N

N N

N N

N N

N 3

3 WAITS 1%R 1/2 11/15/85. N N

2 N

N 2

N N

2 3

NUREG-1214 3-4

\\

SALP

SUMMARY

REGION 3 REACTORS IN OPERATION PLRTT HAME IFT OPS RAD 00N M/S EP SEC ET GQ BIG ROCK FOI!U 1 12/27/91 2

2 2

1 2

2 2

BRAIDWOOD 1/2 07/19/91 2

2 1

1 1

2 2-BYRON 1/2 11/10/91 1

1 1

1 1

2 1

CAILAWAY 1 05/01/90 1

1 1

1 1

1 1

CLItfKU 1 06/13/91 2

2 2

1 2

2 2

CXM 1/2 12/12/90 1

2 3

1 1

3 2

DAVIS-BESSE 1 11/09/90 2

2 2

1 1

2 2

DRESDEN 2/3 11/04/91 2

2 2

1 1

2 2

M1ANE ARNOLD 08/01/91 2

2 2

1 2

3 3

FERMI 2 05/22/91 2

1 2

2 1

2 2

KEWA11 NEE 04/06/91 1

1 1

1 2

2 2

IASALLE 1/2 02/01/91 1

2 2

2 2

2 2

MOtRICELLO 09/14/90 1

2 1

1 2

2 1

PALISADES 04/23/91 1

2 1

2 1

2 2

PERRY 1 12/19/91 2

2 2

l' 1

2 2

~OItfr BEACH 1/2 01/08/91 1

2 1

2 2-2 2

PRAIRIE ISLAND 1/2 08/07/91 1

1 1

1 2

2 1

Q11AD CITIES 1/2 06/19/91 3

2 2

1 1

2 2

ZICti 1/2 03/05/91 3

2 3

2 2

3 2

NUREG-1214 1-5

R Eufi C T O R S UNDER CONSTRUCTION

/

PL M NAME MT SF 00 tit PIPE SRC AUX ELEC INST DGH Qt. LIC b

d RSEG-1214 1-6

SALP SLTMMARY REGION 4 REACTORS IN OPERATION I4 M T NAME RPT OPS RAICON M/S EP SEC ET SQ

___3______ _____!____ ___l___

ARKANSAS 1/2 04/01/91 2

2 2

1 1

2 2

00HANCHE PEAK 1/2 05/10/91 2

2 2

1 1

2 2

CCOPER STATION 12/07/90 1

1 2

2 2

2 2

FORT Call 100N 1 11/20/01 2

1 2

2 1

1 1

FORT ST VRAIN 04/07/89 2

2 3

2 1

2 2

RIVER BEND 1 08/15/91 1

2 2

1 2

2 2

SCUni TEXAS 1/2 09/06/91 2

3 2

2 1

2 1

WATERFORD 3 08/28/91 1

1 2

1 1

2 2

WOLF CREEK 1 10/26/90 2

2 2

1 1

2 2

NUREG-1214 1-7

O REACTORS UNDER CONSTRUCTION PLA!E NAME RPT SF CCtU PIPE SRC AUX FLEC INST D3N QA LIC


.----l---------l--


l----l-.......l...-

...l... ---l NUREG-1214 1-8 I

_a

I l

l SALP

SUMMARY

REGION 5 REACTORS IN OPERATION PLA!U HAME RPT OPS RADCXN M/S EP SEC ET SO

....................j........j...j......j.....j....j...j...j...j DIABID CANYON 1/2 09/05/91 1

1 2

2 2

1 1

PAID VERDE 1/2/3 03/29/91 2

2 2

1 2

2 2

RANCHO SECO 1 07/21/89 2

2 2

2 2

2 2

SAN OtOFFE 1/2/3 11/05/91 2

1 2

1 1

2 2

TRCOAN 08/08/91 1

2 3

2 2

2 2

WASHItGKN NUCLEAR 2 12/26/90 1

2 2

2 2

2 1

NUREG-1214 1-9

REACTORS UNDER CONSTRUCTION PLMU HA!E RPT SF 00tn PIPE SRC AUX ELEC INST DGH QA LIC

....................l.........l...l....l....]...l....l....l....]...l..

l...;

/

NUREG-1214 1-10

1 t

Section 2 SALP History: facilities in Operation i

e NUREG-1214

i

(

SALP HISTORY (REACTORS IN OPERATION)

PLA!C IME PEAVER VAL!El TeBICth 1

UtilT IPT ASS!fT. PFBIOD OPS PADXti H/S EP SEC lit EQ i

=! ::::!::::================!===li. ::::l=== :!====l===l :=l===1 1 1/2 05/91 09/01/89 - 12/31/90 1

P 1

1 1

2 1

.....p....l...................g.

.g..........;....

..l

  • 1/2 02/90 06/01/88 - 08/31/89 2

2 2

1 1

2 2

p.. p.... p...

p... p.. p.. p..

.....p.... p.......

8 1 11/88 03/16/87 - 05/31/88 1

2 1

1 2

2

.....p....p....................p..p.....p....p...p..p..l...[

t ET - Improving I TBAlt4110 rated Catepory 2 8 TBAltG 3: Ull1T 2: PREOP & STAT (TUP-1 PIA!R I M E:

BEAVEB VALLEY FW10H:

1 Uti1T RIT ASStif. PERIOD OPd BAD 00tiidAINT SURV FP EP Sisc CU19 QP LIC TfC

! :::=i:::=================l::=!
=l=:::! ::l ::1:::l ::: p::l:: !===!

1 12/87 10/01/85 - 03/15/87 2

2 2

2 2

1 1

2 2

2 2

...... p.... p................... p. p..... p... p... p.. p.. p. p... p. p.. p.. !

1 05/86 04/01/84 - 09/30/85 2

2 1

2 1

1 1

3 H

1 N

..... p.... p................... j... p..... p.... p... p.. p.. p. p... p.. p.. p.. ;

1 08/84 12/01/82 - 03/31/84 2

1 1

2 2

1 1

2 H

1 H

..... p.... p......

......... p.. p..... p.... p... p... p. p.. p... p.. p.. p.. )

1 06/83 12/01/81 - 11/30/82 2

1 2

2 2

2 1

2 H

1 ti

.... p.... p..........

p.. p..

. p.... p... p j... p..l... p.. p..t l

1 05/82 09/01/80 - 08/31/81 2

1 3

2 2

2 3

2 H

2 N

..... p..... p............... p.. p..... p.... p... p. p.. p. p.. p.. p.. p.. !

1 02/81 09/01n9 - 08/31/80 3

2 3

3 3

2 3

2 3

11 H

.... p.... p................... p. p.... p'... p.. p.. p. p.. p... p. p.. p. g HUFm-1214 2-1

--e..

y%,

,-,-.c,,

,_4...,.s

___we,

-+

SALP HISTORY (REACTORS IN OPERATION) 14Alfr HAME: CALVEI(T CLIFFS IE ION:

1 UNIT RI'r M M r. PERIOD OPS RADCott M/S EP SEC ET SQ

===== 1 ::== t======r. :::::::::::: 1 := t====== :::::.= ! =::: :::= i::: ! =n= l t 1/2 06/91 01/01/90 - 03/31/01 2

2 2

2 1

2 2

.....l.....l..

l....l.....g.....l

...:.. j

..g...]

t 1/2 06/90 12/01/88 - 12/31/89 3

2 3

2 1

2 3

.t....

l..

....l_..j......l

....l....g.. ;..l___t 8 1/2 05/89 09/01/87 - 11/30/88 2

1 2

2 1

2 3

.....l....

l.......

..l.........l....

l_...l...l

..l.

.l 1 lbdcon & ET Iwmvirst Sec Delinirs

  • Plt Ore-!wmvirs. M/S-Irnpmvirw 8 OPS DECLIN!!Ut EP IMPROV!!U PLAfff IMME: CALVEiff CLIFFS I E ICti:

1 UNIT ICT ASStfr. PEBIOD OPS RAltXti MAltfr SURV FP EP SEC 0010 QP LIC TIG

t:1::::=t::::::::::::::====== :::::::::=t=====t====l:: l::::::=;::::l:::!:::1:::t 1 1/2 03/88 05/01/86 08/31/87 2

1 2

2 H

2 1

1 2

2 2

......t.

__l..

.j..l...j..

j....j... :.._l..;

1/2 09/8G 10/01/84 - 04/30/86 2

1 2

1 N

1 1

2 2

1 2

..l...............: __..... ;........l...l...l.

..l...l...l

..l 1/2 01/85 10/01/83 - 09/30/84 1

1 2

2 1

1 1

1 11 1

H

..g.....;

l....g...l.._;...l...;

1/2 02/84 10/01/82 - 09/30/83 2

2 3

3 1

2 1

2 N

2 N

.....l_................... ;.......l_....l....;_..l..l...l....j

...l...t 8 1/2 02/83 10/01/81 - 09/30/82 2

1 2

1 1

1 2

1 H

2 H

.l.

....l

..g. _.._j....j...l

..l...l...l....t.. j..

1/2 12/80 10/01/79 - 09/30/80 3

2 3

2 2

2 3

2 3

H H

.l.

. t...................l

..l....

l.. l___l...l

..l...j..

l...l...;

1 INC 'IT<END IN OPS. TIUni DEC TIEND IN OlfiUt Etu SUPP:3 8 to RATItOS WEIE ASSICNED IVB THE PERIOD 10/01/80-09/30/81.

NUREG-1214 22

i l

l SALP HISTORY (REACTORS IN OPERATION)

PIA!U HAME:

FITZPA11 TICK MDICH:

1 UNIT RIU AS5tfr. PERIOD OPS PAD 00H H/S EP SEC h7 SQ l

=====!=====l==================alx==l======l=====l====t===l===l===l 07/91 10/01/89 - 01/31/91 2

3 2

1 1

2 3

.....!....................l...l......l.....l....l...l...l...!

05/90 05/01/88 - 09/30/89 1

2 2

1 1

2 2

.....l.....l....................j...l.....l.....l....l...l...l...!

PLA!U HAME:' FITZPATRICK PB110ll:

1 UNIT PFr ASSMT. PEBIOD-OPS PAD 00ti MAltR SURV FP EP SEC 001G QP LIC TfG

=====l=====l====================!===i======l=====l====l===l===l===l====!===l===p:==l t

09/88 12/01/88 - 04/30/88 1

2 2

2 H

1 1

H 2

2 H-

....l.....................l...!.....:.....l....l...l...l...

...t...

...l 07/87 12/01/85 - 11/30/80 2

2 2

2 H

1 1

2 2

2 2

.....l.....l....................!...l......l.....!....l...l..

l...l....l

..l...;...l 06/86 07/01/84 - 11/30/85 2

-2 2

2 1

1 1

2 2

2 2

.....!.....l...................l...l......l.....!....l...l...l...l....l...t...:...;

12/84 01/01/83 - 06/30/84 2

2 2

2 1

1 1

1 H

2 H

.....l...................l...l

.....l.....!....l...l...l

..l....l......l...l 07/83 01/01/82 - 12/31/82 2

2 2

2 2

1 1

H H

2 H

.....l.....l....................l..l......l.....l....]...l...l...;....l...l...!...!

09/82 03/01/81 - 02/28/82 3

3 2

2 2

2 1

2 N

2 N

..l.....l.,..................l..l......l.....l....j...l...l...l....l...l...l...;

02/81 12/01/79 - 11/30/80 2

3 2

2 3

3 3

2 3

N N

.l.....l...................l...l......l.....l....[...l...l...!... l...l...l...l 1 WlU IHCL IN MAllR;E!U/ TECH SUP-2;EP DECL:LIC IMPR;QP IMPR HURB1-1214 2-3

SALP HISTORY

( RIEACTORS IN OPERATION)

PIAf T IMME: G110%

1001Ct1:

1 WIT RI'r ASStfr. PERIOD OPS IMDXt1 H/S EP SEC ET SQ

t=====l:::::::::::::::::::=j:::l:::::=i:====l::::l:::!===1:: l 1

12/90 06/01/89 - 09/30/90 2

2 2

1 2

2 2

.....j.....t_...................l_..l......l_. __l_...l...!...l.__t 11/89 12/01/87 - 05/31/89 2

2 2

1 2

2 2

.....t.

...j....................l...]......]._..l..__j...l_ _j...l 1 H/S Ierwing. EP : 1eroving PIAffr FLAME: git 0B BlBitti:

1 WIT RPr ASSiff. PERIOD OPS PADCOtt MAllir SURV FP EP SEC CUlu QP LIC TIG

= :::!===::! ::::::::::::::::::::::: :::::::::::=l:===l :=t:::1 ::1::==l ::!::=l :=1 1

05/88 06/01/86 - 11/30/87 2

2 2

1 N

1 1

N 2

1 1

_....!_....;..__............._..g...;......l.....!....[...l...l...l....t...;..-j...l 12/88 01/01/8b - 05/31/80 2

1 2

1 N

2 1

1 2

1 2

...t..........:....

...:...l. _g...

...j_.

l...!

05/85 07/01/83 - 12/31/84 2

2 1

1 1

2 1

1 3

1 N

.........l...l..

...l......;

.._j....l..l...j...!

09/03 06/01/82 - 05/31/83 2

?

2 2

1 2

1 1

N 1

N

.:.....l.................j

..:......:.....;....l...;..;...l__..j......;...t 03/83 07/01/81 - 06/30/82 1

2 1

2 2

1 1

1 N

1 N

..._.g.....

........j...t__...;.....;....g..

l...l...l...:...:...t...

03/82 07/01/00 - 06/30/81 1

2 1

2 2

2 2

1 2

N N

...._j....l....................j...t__...l... j.

..l.

l...l

..;....j...j_..t...l 07/80 01/01/79 - 05/02/80 2

2 2

2 2

2 2

2 2

N N

.....:.....:........._..........:...!_.....l.....:....l...l_..l...l....l...:...l--_:

1 EtUrrECH SUPP:2: HAltfr IMPIOVItU a

NUBfD-1214 2-4

w SALP HISTORY (REACTORS IN OPERATION)

PlW U HAME: !!ADDAM NECK RB3101:

1 Uti1T R1'r ASSiff. PERIOD OPS RAD 00t1 M/S EP SEC ET EQ

l::::=l::==================l:::l::::::1:::::l====1===! :=l===l 1

11/91 02/16/90 - 07/13/91 1

1 2

1 1

1 1

...__l

....l..___.............._;. _l......l

__l...;

07/90 08/01/88 - 02/15/90 1

1 1

1 1

1 1

..__.;__...:................___.;.._l.

.._l_..__1

.__l.._l___;__.g 12/88 04/01/87 - 07/31/88 1

1 2

1 1

1 1

g.....j....................j. _l......l_____l_..;__ l.._l_

.l 1 OPS & SA/QV N iining P!W E NAME: HADDAM HECK BB31Cti:

1 IINIT IU'r ASSMT. PERIOD OPS RAD 00N MAltfr SURV FP EP SEC OtJIU QF LIC TfG

=l======l=====;:::=l===l::=j:::i====l:::::::l===l 1

09/87 03/01/86 - 03/31/87 2

2

. 2 2

3 2

1 2

2 2

2

.l.......

....!.._l......l____ ;..__j___j...l...;____l___;___j

.j 08/86 03/01/85 - 02/28/86 1

2 2

2 N

2 1

2 2

2 2

._...t..

.....j..__l.__;

__:...;.. _l.._t..: __;

09/85 09/01/83 - 02/28/85 1

2 1

2 2

2 1

1 2

1 N

.....l.....l.....____...........l_..l_...__l.....l__

...l.__l...g..__l

.__l_..l 01/83 09/01/81 - 08/31/82 1

1 1

1 1

1 1

1 N

1 N

_;...._l

.......___......._;.__.. __.:.....l l.......l

. ;. _l __;

07/82 07/01/80 - 08/30/81 1

1 1

2 1

2 1

1 1

N N

-__.g.._;___j.__j____ ___;...._

10/80 06/01/79 - 06/01/80 2

2 2

2-2-

2 2

2 2

N N

.._l_..... _.; ____:...

g...;.._.__:....j.. ;___;.

1 EIGINEEFitu SUFFORT BATED 2 NUREG-1214 2-5

.. - - - _- ~ - -.-.. - -

N SALP HISTORY l

( R E A C T O L'rovirs

~

  • PPEOP & STAICUP TEST 110 8 Uti1T 2 PBEOPEFATIOllAL/STARTUP TESTItU l

I P!WU IMME:

LIMERICK IG110ti:

1 UNIT RPT ASSR. PEBIOD OPS PAirJJtt HAltU SUfW FP EP SEC OIIIU QP LIC TfC

====.l=====l====================l===!======l=====l====t===l===l===l====!===l===t===l t1 09/87 02/01/86 - 01/31/87 1

1 1-1 li 1

2 11 1

2 1

... l..

.l.

..............j...l......l.....l....l...l...l

..;....j..

l...l...l 1

12/86 12/01/84 01/31/86 1

2 2

2 ti 1

3 11 1

1 2

...l.....l...........

...l

..j...........l

...l...l...j..

l....l...l...j...;

1 ElCIN SUPIUU RATED 1 1

tMIE3-1214 2-9

SALP HISTORY (REACTORS IN OPERATION) 11Mfr IMME: MINE YANKEE idDInti:

1 0111T IG'r ASEMr. PERIOD OPS 1%D00H M/S EP SEC ET C4

===l ::::i====================!===l======l::==rl====l===t===l::

1 1

00/91 11/01/89 - 02/28/91 1

2 1

2 2

2 2

.....j.....j

..................l...j......l_....l....l..t...l..

1 a

05/90 08/01/88 - 10/31/89 1

2 1

2 2

2 2

.....l....t___

l...l

.....l.....l...

l...l...j

..t 8

01/80 02/01/87 - 07/31/88 1

3 1

1 2

2 2

.....l.....[.._................l..l_... _l.........t...l...l...l 1 OPS declining: SEC iw roving 8 EP Imrovirur 8 !%DCDti-ItflOVIlf)

PIhfr IMME: MAINE YANKEE FIMIOti:

1 Ut11T IU'r AS9fr. PEl<IOD OPS HAD00H MAltfr SURV FP EP SEC OCTIU QP LIC TIC

=- 12:::: l :::::::::======= = = = =. ;::= l = = = = = = l = = = = = 1=== = ! === 1 === 1 ::= l==== l== = j=== l e== l 1

08/87 11/01/85 - 01/31/87 1

2 2

1 H

1 1

-H 2

2 1

.....l.

........:...t......t.....l......t...;..:......l......l 04/88 07/01/84 - 10/31/85 2

2 2

1 1

1 1

2 H

2 H

..._.........................j................. l..l...;.......t.

.g...

01/85 07/01/83 - 06/30/84 3

2 2

2 2

1 1

1 H

2 H

.....l_....:....___............:..i.....:____.j....:...:...g

..l.......g...i. _l 10/83 07/01/82 - 06/30/83 3

2 2

2 1

2 2

1 2

2 H

.....l.....l....................;...l......t.....j..

..:_..l.

...l...l...

01/83 08/01/01 - 07/J1/82 3

2 2

2 1

2 2

H 3

2 H

.....t....:...................:....... :....

...l...;...!...i.._g

__l...:...:

04/82 07/01/80 - 06/30/81 2

2 2

1 1

1 3

1 2

H 2

.....:.....l...................:...

......g.:...

....l_.....:

..g....t...t...j...

11/80 09/01/79 - 08/31/80 2

2 2

2 2

2 2

3 3

H H

.l_...l.................._j..l.

.:...._l....l

.l....g..

l....g.. g.. g...j 1 QP TRtU IMPBOVitU HUREG-1214 2-10

SALP HISTORY CREACTORS IN OPERATION)

PLAtU NAME: MIILSME IE ION:

1 UNIT RPT ASSift. PERIOD OPS RAD 00N M/S EP SEC ET SQ

=!=====l====================l::=l======l:::::l=======l::=1===!

1 05/91 06/16/89 - 12/16/90 1

2 1

1 1

2 2

_____l_....l _...____..____....;..l______;_____l ___l___l___l...!

3 05/91 10/16/89 - 12/15/90 2

2 1

1 1

2 2

I

____.l_____:.._______________

_l__ l______l....;____l..l___l. _l 12 05/91 06/16/89 - 12/15/90 1

2 2

1 1

2 2

___l_______

...!.__l

_____ ___.!___!___l..:
  • 3 04/90 06/01/88 - 10/15/89 2

1 1

1 1

2 1

. ___l_... l.... __ _.._ ____..l___l_____

.____;.___l___;..;___j l

2 04/90 01/01/88 - 06/15/89 1

1 2

1.

1 1

2

..___l..___l....

_l...l...___;.__._l....;.._!___l___l 1

04/90 01/01/88 - 06/15/89 1

2 1

1 1

2 1

. ___l...__! ___________________;..

l______;...__;...

l __;...;.. l t OIS-declining 2 in IMPBOVltG PLA!TT HAME: MILLS M E IE10H-1 UNIT RPT ASSift. PERIOD OPS RAD 00H MAI!TT SURV FP EP SEC OLTIU QP LIC TfG

=====!====:l:=================== ::=l======l=====;====;::=l

=l===;::== ::=!==:!===l 13 11/88 03/01/87 - 05/31/88 2

1 1

2 H

1 2

1 1

1 1

__. _._.._j.... _..______._____;___l______;.

___l____;___j.__j___l_. _l___l.__l__

l l

  • 1/2 07/88 06/01/86 - 12/31/87 1

2 1

2 N

1 2

1 2

2 1

_l__.._;_______..

__;______;__. _l.__l__

g...l___l__..;___l

..;___l

3 09/87 09/01/85 - 02/28/87 2

2 1

2 H

1 1

1 1

1 2

..l_..__;.......___..._.....

l __;___.__l_____l-__.l___;_

_l___l____l...l___g.

.j 4 1/2 12/88 03/01/85 - 05/31/86 1

3 1

1 H

1 1

1 2

1 2

_ _ _ _ ;. _ _ l..... _ _ _ __ _ _ _ _ _ _... l.. j...._ l _ _ __ l _ _. ; _.. l.. ; _ _. l.. __ j _.. l. _ _ j. _, ;

3 03/86 09/01/84 - 08/31/85 2

2 2

3 1

2 1

N N

2 N

____ l...:___....__________

______l____.;____l

_.i.__l___l....;___._ !.._l 1/2 08/85 09/01/83 - 02/28/85 1

2 1

1 1

1 1

2 N

1 H

._~..l.............___

...[.._l_ ____:....l_. _l.._l___l __l__

l.

l_..;___g 1/2 03/84 09/01/82 - 08/31/83 2

1 1

2 1

2 1

1 N

1 N

.... g.__. l __ _ __ _ _.. _ _........ :.. l __ _ _

___ __ ; _ _ _ _ j _ _ l _ __ ;... l.._ l

_ l. _ ; _ _. g 1/2 01/83 09/01/81 - 08/31/82 1

1 1

1 1

1 1

1 N

1 N

.._.l_____l..

...[_.. __!.....j

__j__.l___:

__;....l.

l___l___;

1/2 07/82 07/01/80 - 06/30/81 1

2 1

1 1

1 2

1 1

N N

_____l.____l........____. __ 1. _l_...

l....j..__l___; __l___l..__l.__j...;___l NUP10-1214 2-11

)

SALP HISTORY

( Ril:ACTons IN OPERATION)

IVAlfr IV.ME: MILitm6E (continued)

IS3 ION:

1 UNIT 10 7

/fEMf. ITRIOD OfS BAD 00N MAllTT SUIN FP EP SEC WIU QP I IC TG

=====l=====l====================l===l======l=====l====l===l===l===l===ai===l===l===l 1/2 10/00 07/01/79 - 07/01/80 2

2 2

2 2

2 3

2 2

N N

.....l.....l...................l...l......l.....l...l...l...l...l....l...l...l

..l 1 9 0 SUPP-2 8 90 SUP-2: UNIT 2 DIFFEIGCE. SUIN-2 8 D UlHEEBIlO SUfiOIC !%TED 2 4 MAlltf MO QP NERE ASSIGNED 1 MO 2 IESP, (UNIT 2) l NUBM -1214 2-12

SALP IIISTORY

( REACTOIRG IN OPERATION)

ITAlfr HAME: HINE HILE IVIlfr RIDICH:

1 UNIT IU'r APEMr. PERIOD OPS RAD 00H H/S EP SEC ET SQ

l=====l:::::::::::=========!===l:::::=l=====l====l:: l:::les l 1/2 08/91 03/01/90 - 03/31/91 2

2 2

1 1

2 2

. _ _.. l _.... l................... l.. t..... t..... t.... t... t... [... t 1 1/2 08/90 03/01/89 - 02/28/90 3

2 3

1 1

2 3

...._l.....l.

..l...t....._l..___t

...t.. t.._l

..t 8 1/2 07/89 03/01/88 - 02/28/89 3

2 3

1 1

3 3

..... l _.... l...... m............ t... l.._.... [..... l.... l.. l... l.-. t 1 SQ Improving 8 EQ:IMPitOVI!U PLAlfr IBME: HItE MILE FOIlfr RFDICH:

1 UNIT FPr ASStfr. PEBIOD OPS f%D00H MAltfr SURV FP EP SEC CUIU QP LIC TfD

=====1 ::::l :::::::::::========l :- :::::=!=====l====!===l:::1:::l====l===l===l:::l 1 1 07/88 11/01/88 - 02/29/88 2

2 2

2 H

1 1

N 3

2 2

_....t.....j

...[......t.__..t....t...t___t...!..

.(...[...t.

.l t2 07/28 02/01/87 - 02/29/88 2

2 2

2 H

1 1

H 3

2 2

.......... l.................. !.. _ l.... _ _ t... _ t.... [.. t.. l... t _ _.. t... t.. t.... ;

  • 2 08/87 02/01/86 - 01/31/87 2

2 N

2 H

1 1

H 2

3 2

.....l.....l....

_l...l....._l.....l.

l...t...t..

l.._l___;..g

..l 1

07/87 06/01/85 - 10/31/86 2

2 3

2 H

1 1

2 3

1 2

. _..j...

l..

..l.._j....__!....

l...

l

_l.._l.. l_..l...

l...l 1

09/85 05/01/84 - 05/31/85 1

1 2

1 1

1 1

N N

1 N

__...t.

l..................j...;_..

.j...._!____...l.

l

..l....l...j...l...j 1

09/84 05/01/83 - 04/30/84 3

2 2

2 1

1 1

1 H

1 N

__}....j_ __. _...... __

l...l......t.

._j...l. _t..[...j....;___!...t...I 1

08/83 06/01/82 - 04/30/83 2

2 1

N 1

N 1

1 N

1 N

...._l_.._l

.....______.......l...l......[....;._

[...[...t...[...j...t..t..

t 1

09/02 05/01/81 - 04/30/82 2

3 2

2 2

2 1

1 H

1 N

..j.....l.._....___...... _l...j...__j.....j...l-.

l..l__

l_..j

..l

..t...l 1

05/81 02/01/80 - 01/31/01 2

3 2

2 3

2 2

2 N

N

... t....:.. __. ___....___

.}...l.... ;... l_.2..l. _l..l...l....j..

l. _j..l 1 ElO SUPP:2; RAD 00H DECLINItU a E!U SUPP:2; OPS IMPROVItG; RAD 00N. LICENSItU DECLINItU
  • CONSTRUCTION WicrIONAL AREA RATI!U WAS 2 HURID-1214 2-13

B A ra P HISTOIRY

( RIEACTORS IN OPIIIRATION )

PIMU IMME: OYSTEli CREIK IdIIICH:

1 lHIT IU'r ASCMr. ITSIOD OPS IMD00H H/S EP SEC ET SQ

l=====l:::::===============p==l======lc::==l====l===l::=l===!

1 08/91 03/10/90 - 04/13/91 2

2 2

1 2

2 2

..... p..... p _.................. p.. p.... p.. _. p.. p. p.. p. l 09/90 02/01/89 - 03/10/90 2

3 2

2 2

2 2

---.p.... p................. p. p.... p.... p... p._j.. p..l 8

09/89 10/01/87 - 01/31/89 3

3 2

2 2

2 2

..... p.... p............... p.. p..... p _.. p.. p _. p.. p.. l 1 ots. ET inerwirs I OIT>:ItiPIGVItB I'! WIT IWiE: OYSTER CI M 10010t1:

1 (UIT IU'T IfEMr. PEftIOD OPS IMD00ti !%ItR SUIN FP EP SBC 001U QP LIC TIG

= = p: = = = l====== = = = = ===== = = = = = p:= h:::: = p ::= p: = = p:= >==

==l

=l===l=r p==l 1

05/88 10/16/80 - 09/30/87 3

2 2

2 H

2 1

H 2

2 2

... p.. p...._ _............ p..

p.._. p.... p. p.. p. p.. p.. p.

p._ p _ !

06/87 07/01/85 - 10/15/86 2

2 2

1 H

1 1

2 2

2 1

..... p _ _ _ p...........__.. _ _ p.. p_.... p... p..

p-- p. p _ p... p.. p._ p._ l 03/80 05/01/84 - 06/30/85 2

1 3

2 H

1 2

2 H

2 N

..... p.... p.._........... p._ p..... p _.. p.. p._ p _ p.. p... p.. p.. p.. l 10/84 02/01/83 - 04/30/84 1

1 2

1 2

2 2

2 N

2 H

.... p.. p................_ _ p._ p..... p.... l... p._ p.. p _ p... p_. p. p. ;

00/83 02/01/82 - 01/31/83 2

2 2

2 2

2 1

2 N

2 H

..... p.. _ p _. _ _ _ _ _ _ _....... p.. p.._ _ _ p._ _ _ l.... p.. p. p _ p... p.. p.

p._ l 06/82 11/01/00 - 10/31/81 2

2 3

3 2

2 2

2 H

2 H

..... p.... p........... _.... p _ _ l..... p... p _.. p.. p._ p.. p _.. p.. l... p.. l 03/81 08/01/80 - 01/31/81 2

2

'2 2

2 2

3 2

2 H

H

.... p._.. p......_ _ _ _ __ _ _ __ _ p.. p..... p.._ _ p... p.. p. p.. p.. p.. p p. l 10/80 08/01/79 - 07/31/80 2

3 2

3 2

2 2

2 3

H H

.... p _.. p......._......... p.. p _ _.. p.... p _ _ p.. l _.. p.

p... p _ p,.. p. l 1 E!O SUPP:3i LICENSItU ItiP!10VltU HURID-1214 2-14

~_.

GALP HISTORY (REACTORS IN OPERATION)

ILA!G IMME: PEAQI KrPKH REGI0ti:

1 UNIT IUT ASST #. IERIOD OPS RATOtti H/S EP SEC ET SQ

=====l=====l=======e============l===l======l=====l=======l===l===j 2/3 12/91 00/01/90 - 08/03/91 2

2 2

1 1

2 2

_l____.l.......__

._...... l

..l......l.....l

..... l

..l...l 2/3 10/90 07/01/89 - 05/31/90 2

2 2

1 1

2 2

_l,.....l..____

...!.__...l____

l....l...g...l

..l l

1 2/3 02/90 08/01/88 - 00/30/89 2

2 2

1 2

2 2

_l....

....................l.....____l.....l..._l...

...l...!

8 2/3 12/88 06/01/87 - 07/31/88 2

2 2

2 3

1 2

.....l...

l...g.... l

....l_...j...!

..l...(

i.

1 OPS & SEC IS IMPTW ItU 2 t%I!EEtMICE/SURVEILLAICE-IMP!GI!G PLA!E IMME:

PEACil KfrKH P!GION:

1 UNIT RIT ASSin. PEDIOD OIG 1%DCXU t%ItC SURV FP EP SEC OVIG QP LIC TIG

=====!=====l====================l===!======!=== =l====j===l======l====l===!===l===l 1 2/3 12/87 02/01/86 - 05/31/87 N

2 2

2 3

2 2

11 N

2 N

..___l.....

...l...l

.....l.......l...l

..l

...l..

.....l 2/3 12/86 04/01/85 - 01/31/86 2

2 2

2 2

2 3

1 3

2 2

.... l_.__...................l...

___..l.

...l

.... _l

..l...l....l_..l...l___l 2/3 08/85 01/01/84 - 03/31/85 2

3 1

2 2

2 3

1 N

1 N

.....l_....l,..... ___....__.__l.....

l

..._l....l...l.__l___l...l__

l.. l_.l 2/3 05/84 03/01/83 - 12/31/83 2

2 2

2 2

2 1

2 N

1 N

_....l..

...l.........l

..._l..._j...l...l...

...l.._l....._l 2/3 09/83 03/01/82 - 02/28/83 2

3 2

3 3

1 1

2 N

2 N

___..l...._l_............... l

..l......l__

.l_...l

...l

..l....l...l...j...j l

2/3 10/82 07/01/81 - 06/30/82 2

3 2

2 3

2 2

2 N

1 N

...i..._l..____...._.......__l...l..____l_....l._..l l...l...l....l.

l...l..

2/3 09/81 07/01/80 - 06/30/81 2

2 2

1 3

2 2

1 2

N N

......l_....l

.........l_..l_.....l.

..l_..l...l_..l...l.. _l...l

..g...l 2/3 07/80 05/01/79 - 05/01/80 2

N 3

2 2

2 3

2 3

N N

.l.. _.t

...__.....l.

.l

....l ___l__.l...l...l.

l...l....l...j 1 OPS,QP UlMCCEP TEQi GUIT=2 IMPROVI!Ut IMItC FP IMPBOVItG 1

l NURIM-1214 2-15

--.._ - - - - - -. - - -. _ _ _ ~.

i i

i N

i, SALP HISTO 1W i

( R E A C T OIT S IN O PIC17A T I O N )

l 11MU 14AliE PIIDRIM leBIDH:

1 1

UtilT RI'T ASSMT, PERIOD OPS HAD00t1 H/S EP SEC ET SQ

====l====================l===l======l::::ml====l::=l :=l::=l

+

1 1 12/91 08/10/90 - 09/28/91 2

1 2

1 1

2 2

l.._

__.....___..........l.._l......l_...l_...l___l...l...!

  • 1 11/90 07/01/89 - 08/15/90 2

1 2

2 1

1 2

.....l.....l.............______.l...l......l..

..l...-l.._l___l_..l

  • 1 12/89 05/10/88 - 06/30/89 2

2 2

2 1

1 2

.....l.....!___.......

.g...j....__l__...l..._!...

_.l...

t OfS ieroving

  • DPS : 1eroving. EP = Ituproving 8 EP IS IMPTOVItU N

i i

ftM U 14AME: Pl!DRIM 4

RB110N:

1 i

j Util? PFr ASSift. PERIOD OFS BADOCti MAltU SURV FP EP SEC WIU QP LIC TIG

l:::: l e::::::::::::::::::::=== !::::== l===:: ::::..== l :::::= l::::l::= l::= l=== l i1 12/88 02/01/87 - 0$/10/88 2

3 2

2 2

2 2

ti 2

2 2

t

..... l..... l.................. l.. - l

_ _ _ _ l... _. l... _ l

_ l..- l... l.... l. _ l... l _.. l i

  • 1 06/87 11/01/85 - 01/31/87 2

3 2

3 2

3 1

3 2

2

.....l.____l-........._........; __...

..l.__.j. 3..l___l___:...:

.l...l...!

1 05/86 10/01/84 - 10/31/85 3

3 2

2 N

3 2

1 1:

i N

.....l__.._l_._..._______.. __..l__

l.....l.....!....l...l.__l...l

...t_.....l...

1 06/85 07/01/83 - 09/30/84 2

3 1

1 2

3 2

N 1

N

...._l.....!............________l___l....__l___.

....l

_l___l_..l..1 1

_ g... l.. l.._ l.

1 01/84 07/01/82 - 06/30/83 2

2 2

1 1

1 2

N N

1 N

.... l

....l....

___l.__l......l....l.__.;___;...;_..j-__.g.__;-__l___l 1

11/82 09/01/81 - 06/30/82 3

2

,2 2

3 1

2 2

N 2

N

.....l.....l..........______..__l___l......l.....

.__:-__g... -___!__.g.._l_..

1 10/81 09/01/80 - 08/31/81 3

2 3

2 2

1 2

2 3

N N

l.....

. _____..___________l___l_...__l_____l....l.__1...:.......l___l...j_

.l 1

04/81 01/01/80 - 12/31/80 k

3 2

2 2

3 3

3 N

N l

___..l.....!.___.....

l...l. ____g...

___l...l...l.2._l.

l.._l__..._l t WlU ItRIER ItCO UTHERIEtO/ TECH SUPP-1tRAD00N-IMPRtEP-1MPR MUST EtEER 00RRE7f RENRT IeTES.

}

t HURID-1214 2-18

SALP HISTORY (BEACTORS IN OPERATION)

M Wir IWiE: SALD1 REDICH:

1 UllIT WT ASSMT. PERIOD OPS BAICON H/S EP SEC h'T SQ

====:!:::: l::::::::r.:===:======l :=!::::==l=====l::==l ::l:::l===l 1 1/2 11/90 0$/01/89 - 07/31/90 2

2 2

1 1

2 2

l.....l_................___l.__l......

.....l....l...l...!...l t 1/2 09/89 01/01/88 - 04/30/89 3

2 2

2 1

2 2

l.....l.......__....____...l...l

.....l....l....l...!...l...l 1 H/S : Delining 8 h7 IMPI(//It0 PIMff !{AME: SALEM FB3IOth 1

UNIT RPT ASSMT. PERIOD OPS RAD 00N MAltfr SUEN FP EP SEC OtJIG QP LIC TFG

! ::::l:::::::::::::::::::====l======l=====!====j:::l===l::=l====l:::l===l===l l

1 1/2 06/88 10/01/88 - 12/31/87 2

2 1

2 N

1 1

1 1

2 2

.....l-__--l...................l...l......l.....l....!......l...l--.-!-l.._l...l l

1/2 02/87 10/01/8F - 09/30/80 2

1 1

2 N

1 1

2 2

2 2

.....j..

..l........

.......l.........l..

...!...l...l...l....l___j...j.__l 1/2 02/80 09/01/d4 - 09/30/85 2

1 2

2 2

2 1

2 N

2 H

...__l

_________l...

..l.____l_...l_..l...g_..l....l...l.._j

..t 1/2 02/85 10/01/83 - 08/31/84 3

2 2

2 3

2_

1 2

N 2

N

....l.....I_.......

...l......l....

l....l......l... __..!...!...I...l 1/2 01/84 10/01/82 - 09/30/83 3

2 2

2 2

1-2 1

N 2

N

_....l.....l...................!...l.

.....l....!.._j...l..

l..._;._

!...l...;

l 1/2 01/83 09/01/81 - 08/31/82 2

1 1

1 2-2 3

1 N

2 N

...l_

_!._..l....l_..;...t...l.._ l__-l_..t.__l 1/2 10/81 (

V80 - 06/30/81 1

2 1

1 2

2 3

1 1

N N

___l...;......t...._l...

l...l.

_l...l

...l...;__

l...l

..__l......

1 E!O SUPP 2 1

l l

l l

l NUEE -1214-2-17

SALP HISTORY (REAOTOBS IN OPERATION)

PIAffr IBME: SFABMG RKi10N:

1 UNIT RPT ASSifr. IMIOD OPS RADOCN M/S EP SEC h7 SQ

=====!=====!====================!===l:::::=l :::=l::==l===l:::!===l 11 01/91 07/01/89 - 10/31/90 2

2 2

1 1

2 2

__j...._l_____..

__l___l......l...._l_..

l...l...l...l j

1 Oro and SQ ierovire NURSI-1214 2-18

1 1

SALP HISTORY (REACTORS IN OPERATION)

PLAlfr NAME: SliORDIAM REION:

1 UtiIT RFT AS91T. PERIOD OPS RAD 00N MAltTT SURV FP EP SEC OUIU QP LIC TIG

========================:=:.===============:======:==========:

1 02/88 03/01/80 - 07/31/,87 1

1 2

2 N

1 1

N 1

1 2

11/88 03/01/85 - 02/28/88 2

3 2

N N

1 1

2 2

3 3

_. _.. :..... : _.................. _ _ _ _ _ _.... :.... _ _ _. t _ _... _ _ _.... :.. _...... t --

07/85 03/01/84 - 02/28/85 1

1 1

1 2

H 1

N N

2 N

09/83 02/01/82 - 01/31/83 2

2 2

14 2

2 2

N N

2 H

07/82 03/01/81 - 02/28/82 ti 2

2 H

2 H

2 2

N 2

N

_____;. __.i.. ________________...:......:.....:.. _:.. ___...:.. _... __. _

05/81 03/01/80 - 02/28/81 2

N 2

2 N

N N

N 2

N N

__..:..... ______.____..______.__!_.....:..__:....:___:.__ ___ ____j_._;... ___

1 E!U/TFQi SUPfr>RT=2;t%Itfr & TEU IIMOVItu 3

NURW-1214 2-19

SALP HISTORY (REACTORS IN OPlERATION )

PRA!(ftWiE: SUFCUDIAliRA REGICti:

1 UNIT RPr ASSifT. PERIOD OPS RAD 00ti M/S EP SEC ET EQ

=====l ::::l====================l ::! :::: l:::::l====l::=l===l::=l 1/2 03/91 08/01/89 - 11/30/90 1

2 1

1 1

2 1

___..].....j.

................_g...l......l.____l....[...l...

t 1/2 01/90 02/01/88 - 07/31/09 1

2 1

2 1

1 1

.....!.....t....................t...;

.....l....

l_...l_.....l...;

1 RAD 00ti-IMPIG 110. EG-DECLItiltU PLAtiT tiAME: SUF/AEiAliNA REGIOti:

1 UNIT BPT ASSiff. PERIOD Off) BAD 00H HAltTT SURV FP EP SEC CUIU QP LIC TIG

====;:========:::======== :::::::::=l===== :::=!:::l ::12::!:::= ::=l===l:::l t 1/2 08/88 08/01/86 - 01/31/88 1

2 1

1 H

1 1

1 1

1 1

..___l_____

.....l.. ;__.g

__;...l____l..

1/2 03/87 05/01/85 - 07/31/86 1

1 1

1 H

1 1

1 2

1 1

. ___;____.j........ ___...

_..l

..l

...__:.....:. __i...

..l.......l..l...:...t 1/2 09/85 02/01/84 - 04/30/85 2

1 1

2 2

1 1

1 1

1 N

____l____

!_...:......;_ _l____;......:...

1 08/84 02/01/83 - 01/31/84 2

2 1

2 1

1 1

tl N

1 11

. _.:.. _ ___...__.... _.....l...:._____l__.

_l....:...l...........;_..:. _;

1 08/83 02/01/82 - 01/31/83 2

2 2

1 1

1 1

ti i

ti

...__!.....:... __________....--:__. ___...:.........l__.l.._l.__l..H..l...: __l_..:

1 EtU SUPP=2 NURB3-1214 2-20

SALP HISTORY (REACTORS IN OPERATION)

PIAITT IW1Er THREE HILE ISIA!O IEDION:

1 0111 7 RIT ATE #r. PERIOD OPS IM OOH M/S

~'5' SEC ET SQ

l=====les:::::::::::::=====l ::l::::::p.c:::l
1::=l :=l===l 1

10/90 01/10/89 - 05/15/90 1

1 1

1 1

1 i

...._l.

_l.......................l__....l__...;....l...l...l.__l t1 06/89 11/01/87 - 01/15/89 1

1 2

1 1

2 2

...__i........ ___.............l...l.....

l........l...l_..j...l 1 ET:IMPIOVI!G FTA!1T NAME: THREE HILE -ISIA!O RB3 ION:

1 UNIT RPT ASSift. PERIOD OPS RATODt1 MAllTT SURV FP - EP SEC OWG QP LIC TfC

1== :=!=====::::::::::::::= :==l:::::::.:::=l====1::=!===l:::l::: !=:212::l:: l t1 05/88 11/01/86 - 10/31/87 2

1 1

1 2

1 1

2 2

2 1

.....;.... ;_...........__....:...j....._l_...l_

..l

.l___!___t....j __j... -_.I 1

05/87 05/01/86 - 10/31/86 2

1 1

1 N

1 2

N 2

1 1

l....!....

.............l. _j

.....l

....l_..:...l...j...

l...t...l...!

1 10/80 09/16/85 - 04/30/80 2

1 2

1 N

1 2

N 2

1 1

...l..__!..... l...;

  • 1 05/86 09/16/85 - 01/10/86 2

1 2

1 N

N N

N 1

N 1

.....;.....:.........____._...j.....___..___:....;..

l...

...t____;,. _:......;

1 05/85 02/01/84 - 01/31/85 1

1 1

1 1

1 1

N N

2 N

.:....__l.....l

.:...g..

l_...;__.t...;__.

1 07/84 1.0/01/82 - 01/31/84 2

1 1

1 1

1 1

N 1

2 N

...l... _...__ ;___;...:.._;

1 01/83 10/01/81 - 09/30/82 1

2 2

1 1

1 1

N 1

1 N

..... ;..... l..................

l.......

... _ _ j.... l.. [... l... j... _ l... j.. ;.... l 1

06/81 04/01/80 - 03/31/81 2

2 2

2 2

N 2

N 2

N N

...._l__..l..

....;...l

___l.....g..._l...l.

...;...l.

1 EtU SUPI':2 2 IlfrERIH SALP EVALUATION.

l l

t I

l i

NURBr-1214 2-21

SAlaP HISTOBY (BEACTORS IN OPEBATION ')

11Alft !WiEt VE!Wtfr YA!EEE IEICH:

1 UNIT PPT ASSiff. PERIOD OPS IWTCtl 11/S. EP SEC b'T f4

=====1=====l:::::::::::::======:le:::::::::1:::::l====l::=l:ent===1 1

07/91 10/01/89 - 03/16/91 1

2 1

1 2

1 1

..........j._.........._....g...j..

..l

..._l_...l

..l..l...l 1

03/90 07/01/88 - 09/30/89 1

2 1

1 2

1 1

.....t.....t...............____l...l......l.....;....:...l..

l...j ITAlfr HAME: VEf@tfr YAtEEE

! E 10ti:

1 Ut41T RFr ASSHT. PERIOD OPS RAD 00H t%Itfr SURV FP RP SEC OLTIU QP LIC TIG

==1:::::t=====:::::::::::::::!===l:::===l=====j:::::::=l:snl::=1::::l===j:::!=c:i 1 1 01/89 01/01/87 - 06/30/88 1

2 2

1 11 2

1 11 2

1 1

....................;...:......:.....l....

t...l...t....:...j...t

..l 1

06/87 10/19/85 - 12/31/86 1

2 2

1 N

2 1

1 2

1 1

.....l....:...t

.-.:...t.......t...:...I 1

03/86 11/01/84 - 10/18/85 1

2 1

1 N

2 2

1 2

i H

...._:... _l....___.

.......... j............:....g p,..

.....l...

..l...;

1 05/85 05/01/83 - 10/31/84 1

2 2

1 2

1 1

1 2

i H

.t...:...l.

1 11/83 05/01/82 - 04/30/83 2

1 1

1 1

11 1

2 11 1

H

.:.._;_.....l.....;....:

..,.l...i.

...t...l...

1 03/83 07/01/81 - 06/30/82 1

1 1

1 1

2 1

1 11 1

11

...;...................:.........:...:....t.__.........:

..;...t.._g 1 OlnU ItCu IN OPS & !%I!(f. EtG/ TECH SUPP-1 NUR E-1214 2-22 l

_._.___ _ _~_

t SALP HISTORY (REACTORS IN OPERATION)

IL Mir I M E: YAtEEE-lKWE IGUICN!

1 LRi1T RPT ASStfr. PERIOD OI S F Ar C ott M/S EP SEC ET E4

==l:::::l====================l===l======l:::::l====l===l===l= a!

11 05/01 08/01/89 01/15/91 2

1 2

1 1

2 1

.....l.....l...................l...l......l

....l....l...l...l...l a1 12/89 04/01/08 07/31/89 1

2 1

1 1

1 1

.....l.....l...................l...l......l....

l...l...l..l...l 1 FA Imlining a FADor;tt. IMPaoyItn 1

ILA!TT 11AMEt YAff/IE-!KHE FfU10ti 1

L411T RPT ASSift. PERIOD 015 BAIOcti MAltfr SURV If EP SEC OUIU OP LIC TfG

= !:::::l::::===== :==es::::= l:: l::::: !:n== l::::l =2:l =u l:::l==== l::= l=== !::= l 1 1 09/08 10/07/80 - 03/31/88 1

2 2

1 11 2

2 1

1 1

2

.....l.....l..............

...l...l......l......l..

.l...l...l...l....l...l...l.

.l 1

03/87 02/01/85 10/06/86 1

1 1

1 1

2 2

1 1

1 2

.l.....l....................-l...!......l....l...l...l...l...l...l...l...l...l 1

05/85 09/01/83 01/31/85 1

2 1

1 1

1 2

1 2

1 ti

.....l.....l

...................l..

l....l.....l....l...j...l...l....l..

l...l...!

1 02/84 06/01/82 08/31/83 1

2 1

1 1

1 2

1 2

1 ti

.....l.....l...

....l...l.....

l....

....l...l......l....l...l...l

..l 1

01/83 07/01/81 08/30/82 1

1 1

1 1

1 1

1 11 1

11

.....l.....l............

.......l...l.....l.....l....l...l

...l....l.

.l 1

03/82 07/01/80 - 06/30/81 1

2 1

1 1

1 2

1 2

ti 11

..l.....l............

..l..l......l....l....l...l...l...l

...l...l...l...l 1

07/80 05/01/79 - 05/01/80 2

2 2

2 2

2 2

2 2

11 11

.....l.....l..........

...l...l.....l.....l

...l...l...l

..l....l...l...l...l 1 Etn/ TECH SUPP;1 1

NUBB3-1214 2-23

SALP HISTORY (BEACTORS IN OPERATION)

IUNT IWiE IVouiS FERRY REGION:

2 UNIT RFr ASS!ff. PERIOD OPS RAD 00t1 ti/S EP SEC ET SQ

=====l::::=l :::::::::::========l===l======l=====l:::=l::=]===l===l 1 1/2/308/90 01/03/89 - 03/31/90 2

1 3

2 2

2 3

..._l_..._l_....__

__........l...l._____l_..._l.......l...l...l 1 ti/S I mroving, EP I eroving, SQ Ieroving IMG IWiE BRCWtiS FEBRY BMIOti:

2 Utt1T FPr ASSiff. PEB10D OPS BAD 00N tiAllR SURV FP EP SEC O(JIU QP LIC TBG

=====l:::::l====== :============l==l======!=====l====l===l::=l :=l====j===l===l===l 1/2/309/85 03/01/84 - 05/31/85 3

2 3

3 3

2 3

N 3

32

.....g.....l_

_l...j.....

l.._.t....l...l. _l...l__..]...j

..l...!

1/2/306/84 01/01/83 - 02/29/84 3

3 3

2 N

2 3

3 3

2 N

__l...__l.................__l...l......l_....j....l...l.__l...l....l.

.l...l__.;

1/2/300/83 07/01/81 - 12/31/82 3

3 3

2 2

2 3

1 3

2 N

.....l.....l_

_____........l.._j......]

....j...

l...l...l

..l...

l...l_..l..l 4

1/2/311/82 07/01/80 - 06/30/81 3

3 2

2 3

t1 2

2 3

N N

___..l...__l.

............l...l

.....j____ l..l...l...l..

l....l_ _l...l...l 1/2/301/81 04/01/79 03/31/80 2

3 2

2 2

2 2

2 3

H t1 l...._!.............. _ g...l

...j...l

...l l..

l...l....l. _j __j..g NUFM -1214 2-24

SALP HISTORY (REACTORS IN OPERATION) 1 ILWT NAME: BRUNSWICK i

RfDICth 2 UNIT RPT AScET, PdRIOD OPS RAD 00N M/S EP SEC ET SQ

::::=====l====================l===!======l=====!====!======l=

1 1/2 01/01 09/01/89 - 09/30/90 2

2 2

2 1

3 2

__... ;___. __________.....____ l___l______.____l___

l___. _l___!

1/2 12/89 09/01/88 - 08/31/89 2

2 2

2 1

2 2

_____;_...:_____________- ____;..l___..:___.

...g..

...l___

a 1/2 12/88 07/01/87 - 08/31/88 2

2 2

T.

1 3

3

_____t__...;__

________l___l______

..___l..___j...

1 M/S : Itnproving 2 OPS DECLINItu i

l PIAtTT iMME: BRUNSWICK

!@ ION: 2 UNIT RPr ASSMT, PERIOD OPS RAIO)N MAltfr SURV FP EP ' SEC 0710 QP LIC TIC

!:::::::::::===============! ::;::==== ::::=l==== ::= ::=l===:==== :::!===!===l 1 1/2 01/88 11/01/85 - 08/30/87 2

2 2

1 2

2 1

2.

2 2

____.____________________________l_____.;_____;.______l__i..._2

___l___: __l 1/2 01/88 05/01/84 - 10/31/85 2

2 2

2 2

2 1

2 2

2.

N

_____!_____l........___________l___l._____l_...

._.;__... _ _;.___l___;.._l___l 1/2 08/84 02/01/83 - 04/30/84 2

1 2

2 2

1 1

1 2

2 N

___l_____;__

!_____l..

j._.g..g __;.___ __.

1/2 06/83 01/01/82 - 01/31/83 3

2 3

3 3

1 1

3 3

3 N

_____l___..:.___________..__

__g___l...

__.g.._l___l____

1/2 09/82 07/01/80 - 12/31/81 3

3 3

2-3 2

2 -

N 3

N N

_____l___..:__..........________g___

____l____ ___l_.. __.;____!___l I

1/2 01/81 04/01/79 - 03/31/80 2

3 2

2 2

2 2

2 2

N N

l

...__;___________.._______g.__ -_____:_____l__.l___!___i___l____ __,.l___..:

1 RAD 00N IMIPOVItu 1

NURE-1214-2-25

. - = _ _. _- -

f l

SAlaP HISTORY j

(BEACTORS IN OPERATICL9) 1 FIA!U 1%ME: CATAWIM IGDICth 2 UNIT IGT ASStfr. PERIOD CPS !%I0'41 M/S EP SEC hT SQ

!=====l ::::::::::::::::::=t:::!::::==!==..::l:e :l===l:::l::-l 1 1/2 05/91 11/01/89 - 02/02/91 2

2 2

1 1

2 2

.....l.....l....................l...l......l.....l....l....l...l...l 8 1/2 03/90 08/01/88 - 10/31/89 2

2 2

1 2

2 2

.....l.....l

.l...l......l.....l....l...j...l...l 1/2 12/88 08/01/87 07/31/88 2

2 2

2 2

2 2

.....l.....l....................l...l......l.....l....l...l...l...l 1 LT-Irpmvirs t OPS IS IMPI(>VI!Ut SEC IS DECLI!11tu i

PLAtTT !MME: CATAWIM PIMIOth 2 Uti!T IUT ASSMT. PERIOD OPS IMEODt1 t%ItR SURV FP EP SEC CUIU QP LIC TfD

=== l===== l::::::::::::::::::: l:: l = = === = l :::= l==== l === l::: l:: l==== l=== j=== l::= l t 1/2 01/88 10/01/85 07/31/87 2

2 2

2 1

2 2

t1 2

2 2

.....l.....!

.....l...j......l.....l....;...]...l...l....l...l...l...l 1/2 12/85 03/01/84 09/30/85 2

2 2

2 1

2 1

11 2

2 2

.....l.....l........

.....l..

l......l....

l....l...l...l...l....l...l...l...l 1 E!U SUPP:2 PREOP & STAHTUP TEST:2

  • ODt13TR PATItOS ALN) ASSIGNED NURIO 1214 2-26

GALP HISTORY (REACTORS IN OPERATION)

MA!E NAME: CRYSTAL RIVER R M 10ti:

2 UNIT RPT aSSift. PERIOD OIS RAD 00H M/S EP SEC ET SQ

=l=====l::==================l:: l======l=====le::=l:::!:::l===l 13 07/91 03/01/90 - 04/27/91 1

1 2

1 2

2 2

..__.p....p._______..........p._p__...p____ p... p..p

_l__

  • 3 06/90 01/01/89 - 02/28/90 2

1 2

1 1

2 2

_... l _ _.... p. _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ p _ p... _ _ p. _ _ _ p _ _ _ p.. p _. p. !

3 05/89 09/01/87 - 12/31/88 2

2 2

2 1

3 2

.. _ _ _ p _ _ _ p.. _ _ _ _ _ _ _ _ _ _ _ _ __ _ _. p._ p..... p. _ _ _ p _.. p.. p. _ p _ _ l t IR imprwing 8 OPS-I e roving plain llAME: CIWSTAL RIVER RMI0ti: 2 t

UNIT WT ASSiff. PERIOD OPS RAD 00t1 MAltE SURV FP EP SEC CUIU QP LIC TfD

l=====l:::::::=============l===l======l::::=l::== p::l===l===l:::=l::=l== l===l t3 03/88 04/01/86 - 08/31/87 2

2 1

3 1

2 2

2 2

2 2

...__p...p........__________ p._p_____p..__p..p_.p._p _ p___p__p__l.__l 3

06/86 11/01/84 - 03/31/86 2

2 1

2 2

2 3

2 3

2 3

..... p _ _ _ _ p_ _ _........._ _ _ p._ p.... p _ _ _ p._ _ p._ p.. p._ p... p.. p. _ p.. l 3

02/85 07/01/83 - 10/31/84 2

2 1

3 N

2 3

H 2

2 N

_ _ _. p _ __ _ p __... _ _ _... __ _ __ _. p _ _ p _ _ _ _ _ p.. p _. p _. p _ p _ _ p __ _ p.. p._ p _ _ l 3

12/83 07/01/82 - 06/30/83 2

1 2

2 2

2 2

1 2

2 N

. _ ___ p. _ _. p _ _ _ _ _ _... _ _ _..... p _. p _ _ _ __ p __ _ p _ _ _ p _ p _ _ p _ _ p _ _ _ p._ p __ p. _ l 3 ' 01/83 05/01/80 - 06/30/82 2

2 3

1 2

2 2

2 N

3 H

_ _ _ __ p_ _

p _ _ _..._ _ _ _ _ _... p. p _.. _ l _ _ _ _ _ p.. p _ p_ _ p._ p.__ p_. p _ _ p _ _ l 3

01/81 05/01/79 - 04/30/80 2

2 2

2 2

3 2

2 2

N N

__ _ _. p _ __. p __ _ _ _ _ __ __ _ _ _ _ _ __ p. p _ _ _ _ p __ _ _ p._ p_ _ p _ p._ p.. p_ _ p_ _ p._ l 1 EP AND TRIO IMPROVI!G t

1 HUR E-1214 2-27

SALP HISTORY (RLEACTOBS IN OPERATION)

ItA!C iM:

FAT M IGDIClit 2

Uti!T IGT ASQR. IERIOD OPS RAD 00t{ M/S EP SEC ET SQ l

a====l=====l====================l===l======l=====l====l===l===l===l 1/2 05/91 08/01/89 - 12/31/90 1

1 1

2 2

2 1

.....l.....l.____

..___j.._l....__l....l___

l...!_..l...l 1/2 12/89 04/01/88 - 07/31/89 1

1 1

2 1

2 1

.....l.....l.__.._

__l...l_....l.....l_.. :___l_..l_..l ItAlU IM:

FARIEl REDIOti:

2 Uti1T RIT ASa#, PERIOD OPS RAD 00t1 MAltG SURV FP EP SEC O(110 QP LIC TIO

=====l=====l====================l===j======!=====l====l===l===!===!====!===l===l===l 1 1/2 09/88 08/01/80 03/31/88 1

1 2

2 1

2 2

1 2

1 2

.....l.._.l........

__....l_..l_____

l.....l.. _!

..l

..l...l... _l...

..l...!

1/2 02/87 01/01/85 - 07/31/88 1

1 1

1 1

2 2

1 2

1 2

.....l.....l......

.....__.l........_l.....l.__

l.._l...l___!....l..l...l...!

1/2 03/85 08/01/83 - 12/31/84 1

1 1

2 1

1 2

1 2

1 t1 l.....l....__.....__......;.__l......l....

!....l

__l___l...l....l...

1/2 04/84 08/01/82 - 07/31/83 1

1 1

1 H

2 1

1 1

2 11

...._l...._l.......______.......!...;.....l__...l.._.l.._l

. l..!.___l..

l...l 1/2 03/83 07/01/01 - 07/31/82 1

1 1

1 2

1 1

-1 H

2 N

{

.....l

..j....................l.._!....

.l _-..l____l

..l

._l...l....l_..l...l_

1/2 06/82 07/01/80 - 06/30/81 1

1 1

2 2

2 2

2 i

H N

l... l _..........

...j..

j......g.....j....l...l...l...l.......l.. l__.!

I gin SUpp=2 1

l l

HUREG-1214 2-28

SALP HISTORY

( RITACTORS IN OPERATION)

PLMT NAME: GRAND GULF RKiIC& 2 UNIT RPT ASSNT PERIOD OPS RAD 00N M/S EP SEC E'T SQ

=====;=====j====================:===:======:=====j====j===:===:===l 1 1 05/91 10/01/89 - 02/23/91 1

1 1

1 1

1 2

_____!_____;-___________________;___ ______l

__;____l___l___l___j 1

01/90 05/01/88 - 09/30/89 1

1 1

1 1

2 2

_____ _____;________ ___________;___ _____;-____ ____ -__;___l___;

1 SQ Improving PLANT NAME: GRAND GULF REGION: 2 UNIT RPT ASSMT. PERIOD OPS RAD 00N MAINT SURV FP EP SEC OCTIU QP LIC TRG

=====;=====:====================j===l======l====!====!===:===j===:====;===:===:===!

1 1 09/88 11/01/88 - 04/30/88 1

1 2

2 1

2 1

1 2

2 2

_____: ____l____________________l___ ___.__;-__._'____;___;___!___;..__l___;-__.__l 1

04/87 05/01/65 - 10/31/88 2

1 2

2 2

2 1

1 2

2 2

_____;____________________g

____!___;-__; __l____!___ ___;___

1 07/85 10/01/83 - 04/30/85 2

2 2

2 2

3 1

N 3

3 N

___;____l___; __;___

1 01/84 09/01/82 - 09/30/83 3

2 3

3 2

1 2

N 3

3 N

_____f.____l____________ ______...;_.... -_____:___._;___

g___ ___;___l____ ___;___ ___

1 04/83 07/01/81 - 08/30/82 3

2 N

3 N

2 2

N 2

2 N

_____ _____;-___________________;___;___.__;_____ ____;___;-__l___

___l___ -__l___l 1

11/82 07/01/80 _ 08/30/81 2

N 2

3 N

N N-N 1

N N

-_-__;____________________l___l______:-____;____;___j.__;___ ____;..__ ___;___

1 DG-2: MAINT-IMPR;EP-IMPR NURIG-1214 2-29

I SALP HISTORY (REACTORS IN OPERATION';

R #ft NAME: HARRIS REGION:

2 UNIT BFT ASSiff. PERIOD OPS BAD 00N M/S EP SEC ET SQ

=====j=====l=======================l======j=====l====j===j===l===!

1 09/91 12/01/89 - 06/01/91 1

1 2

1 1

1 1

_____l_____l____________________;___;______l_____;____l___l___l___l 1

04/90 07/01/88 - 11/30/89 1

1 2

1 2

1 1

_____;-____l____________________l___l______j.____;____;___l___;___l FLA!Tf NAME: HABRIS fGDION: 2 UNIT BPT ASSift PERIOD OPS BAD 00N MAltfr SURV FP EP SEC OLTIG QP LIC TIG

=====!=====:====================j=========:=====j====t===l===!===;====}===t===1===l 1 1 11/88 07/01/87 - 06/30/88 2

2 1

1 2

2 1

1 2

2 1

  • 1 01/88 08/01/86 - 06/30/87 2

2 1

1 1

2 2

N 2

1 2

_____;-____l____________________;___;______;_____;____;___l___j._-l____j.__;___l___;

1 OPS IMPBOVItG 2 PBEOP=2: EtB SUPP=2; 00NST=2 NUBEG-1214 2-30

SALP HISTORY (REACTORS IN OPERATION)

P1W U HAME: HAICH RB310H: 2 UNIT RPT ASSMT, PERIOD OPS RAD 00N M/S EP SEC ET SQ

=====;=====l====================;===l======l=====;====;===;===;===:

1 1/2 07/91 10/01/89 - 03/02/91 1

2 2

1 2

2 1

_____;_____l___..________________;___j._____;_____;____;___;___l___;

2 1/2 01/90 07/01/88 - 09/30/89 1

2 1

1 2

2 1

_____; ____; _________m_________;___;______l..____l____;___;___;.__;

1 OPS declining; RAD 00H 12aproving a SEC & h7 IMPROVItU PLATE NAME: HATCH RS3 ION: 2 UNIT RFT ASSMT. PERIOD OPS RAD 00N MAltE SURV FP EP SEC OUlU QP LIC TRG

=====:=====l====================;===;======;=====;====;===l===;===;====;======;===;

1 1/2 11/88 01/01/87 - 06/30/88 2

2 2

2 2

2 2

2 2

1 2

_____;_____;____________________;___;______;_____;. __l_._;___l___;____;___;___;___;

1/2 03/87 07/01/85 - 12/31/86 2

2 2

2 1

1 3

2 2.

2 1

_____;_____;____________________;___;______;_____;____;-__;___;-__;____l___;___;___l 1/2 10/85 11/01/83 - 06/30/85 2

1 3

2 2

2 2

2 2

2 N

1/2 03/84 11/01/82 - 10/31/83 3

2

~3 2

N 1

1 N

3 2

N

__ _ _ _ ; _ __ __ l _ _ _ _ ____ _ _ __ __ _ _ _ __ _ ; _ _ _ ; _ _ __ _ _ ; _ _ _ _ _ ; _ ___ l _ _ _ ; _ _ _ ; _ __ ; _ _ __ ; _ _ _ ; _ _ _ ; _ _ _ ;

1/2 03/83 07/01/81 - 10/31/82 2

2 2

2 2

2 2

N 2

2 N

_____;_____l________________

-- -__;______; ____l____;___;__ l___;-___;___;___;___l 1/2 10/82 07/01/80 - 06/30/81 2

2 2

2-2 N

1 2

2 N

N 1/2 01/81 04/01/79 - 03/31/80 2

2 2

2 2

2-2 2

2 N

N

_____;_____;____________________;___;______;_____;____;___j___;___;____;-__; __;-__;

1 OUIG-IMPPOVItU NUREG-1214 2-31

SALP HISTORY (REACTORS IN OPERATION)

FiMr NAME: M0GUIRE REION: 2 UNIT RPT ASStff, PERIOD OPS BAD 00N M/S EP SEC ET SQ

t=====!====================!:==l======j:::==!====!::::::=!===l 1 1/2 05/91 11/01/89 - 02/02/91 2

1 2

1 1

1 1

_____;_____l_______________.____l___l______;_____l____;___l___;___;

  • 1/2 03/90 08/01/88 - 10/31/89 2

1 2

1 2

2 2

__..__l_____l____________________l___;___ __;_____;____l___t___!___;

1/2 12/88 08/01/87 - 07/31/88 2

2 2

1 2

2 2

_____l_____j.___________________;___l_.____l_____l____l___;___;___;

1 OPS & M/S Imprr.sving 2 OPS M/S, AND ET IMPROVItG PLAlfr NAME: MCGUIRE REION: 2 UNIT RPr ASSMT. PERIOD OPS RADCON MAltfr SURV FP EP SEC 0710 QP LIC TRG.

== :::::::::::::::===========:===l======l:====l==:::==::::=j======= ::::::::===

1 1/2 01/88 03/01/88 - 07/31/87 2

2 2

2 2

1 2

2 2

2 2

_____j.____j.___________________l___l______;_____;____;___l___ -__;-___;___;___;-__l 1/2 08/B6 09/01/84 - 02/28/88 3

2 2

2 2

2 1

1 2

2 2

_____l____

l____________________l___l______l_____;____l___l___l___l____l___l___l___l 1/2 12/64 05/01/83 - 08/31/84 3

2 2

2 N

1 2

1 2

1 N

_____l_____l____________________l___l______l_____l____l___l___l___l____ ___l___l___:

1/2 10/83 08/01/82 - 04/30/83 1

1 1

2 2

-1 1:

1 2

1 N

_____;_____;___________.________;___l______;_____;____!___;___;___;____;___l___;___l 1

12/82 09/01/80 - 05/30/82 2

1 1

1 2

1 2

1 N

2 N

_____l_____l____________________l___l______l_____l____;___;___l___;____l___;___;___;

1 E!U SUFF 2 NUREG-1214 2-32

SALP HISTORY (REACTORS IN OPERATION)

P!W R NAME: NOfffH MGM REION: 2 UNIT RPr ASStE, PERIOD OPS RAD 00N M/S EP SEC ET SQ

=====;=========================!===:======;=====;====;===;===;===!

1 1/2 12/90 06/01/89 - 08/31/90 1

2 2

1 2

1 1

__;-_____;-____l___..;___;___

1/2 10/89 05/01/88 - 05/31/89 1

2 2

2 2

2 2

_____;_____;____________________;___;______;_____ ____j___;___ ___;

1 RAD 00N = Imrovilug PIME NAME: NORTH ANNA" PEGION: 2 UNIT RPT ASSMT. FEBIOD OPS RADCON MAINT SURV FP EP SEC OUM QP LIC TfG

=====;=====!=======================;===========:====;===;===;===!====:===;===;===:

1/2 09/88 09/01/88 - 04/30/88 2

2 2

2 1

2 2

3 2

1 1

1/2 12/86 03/01/85 - 08/31/86 2

2 2

2 1

2 2

2 2

1 2

_____;-____;____________________;___; _____;_____ ____;___;___ ___;____ -__l___;___

1/2 05/85 09/01/63 - 02/28/85 2

1 2

2 2

2 1

1 2

2 N

_____!_____:____________________ ___ ______;_____ ____l___;___;___:____;___l___l___;

1/2 02/84 10/01/82 - 08/31/83 1

1 2

2 N

1 1

1 2

1 N

1/2 04/83 07/01/81 - 09/30/82 2

1 2

2 2

2 1

1 2

2 N

_____;_____;____________________;___ ______;_____;____ ___;___;___;____;___;___;___l 1/2 11/82 Q7/01/80 - 06/30/81 2

1 2

2 2

2 2

2 3

N N

1/2 12/80 05/01/79 -- 04/30/80 2

2 2

2 2

2 2

2

-2 N

N

_____l_____l____________________;___;______l_____ -___;___l___;___; ___;___j___ ___;

NUREG-1214 2-33

SALP HISTORY (REACTORS IN OPEIL4 TION )

PIMT NAME: OCONEE REGION: 2 UNIT RPT ASSMT, PERIOD OPS RAD 00N M/S EP SEC hT SQ

=====l=====l====================l::::==::::l=====l====l===l===::u:

1 1/2/311/90 02/01/89 - 07/31/90 1

1 2

1 2

1 2


j...--l--------------------;---l------l-----l----l---

---l---:

1/2/306/89 08/01/87 - 01/31/89 1

1 2

1 2

2 2


l-----l--------------------:---:------


=

l---l--- ---l 1 M/S & SEC IMPROVItU PLAltr NAME: OCX) NEE BEGION: 2 UNIT RPr ASSMT. PERIOD OPS RAD 00N MAINT SURV FP EP SEC O(MU QP LIC TBG

====l=========================::==l::====::::::::===l:::l===l===l=======:======l 1 1/2/301/88 03/01/86 - 07/31/87 1

2 1

1 2

1 1

2 1

2 2

- -- - - : -- - - - l - - -- - -- -- - - - - - ---- -- : - -- l - - - - -- l - - - - - l --- - l -- - -- - l -- - l - - - - l - - - l - -- l - -- l 1/2/306/86 09/01/84 - 02/28/86 1

2 2

1 1

1 2

1 2

2 2


:-----l--------------------l---l------l-----l----:---l---l---


l---l---:---

1/2/312/84 05/01/83 - 08/31/84 1

2 1

1 N

1 1

1 2

2 N


l---l------------------l---l---l----l...l---l---

1/2/310/83 06/01/82 - 04/30/83 2

2 1

3 N

2 1

1 2

2 N


:-----:--------------------l--- ------:..---l----:...l---l---;----l

--l---

---l 1/2/310/82 09/01/80 - 05/30/82 2

2 1

2 2

1 1

1 N

2 N-


g---_

---:------:-----:----l--- ---l---l----;---l-,.-l---l 1/2/310/80 05/01/79 - 04/30/80 2

2 2

2 2

2 2

2 2-N N


:----- --------------------l---l------l-----l----l---l---l---l----l---l---

---l 1 EtU SUPP=2 4

NUREG-1214 2-34

SALP HISTORY (REACTORS IN' OPERATION) r H W U NAME: ROBINSON RmION:

2 UNIT RPT ASSMT. PERIOD OPS RAD 00N M/S EP SEC ET SQ

==========;====================l===;======!=====:====l===l===l===;

2 07/91 01/01/90 - 03/30/91 2

1 2

2 1

2 2

_____l_____l___________ ________;___;______;_____l____l___;___;___j 2

05/90 11/01/88 - 12/31/89 2

1 2

2 1

2 2

_____;_____;____________________l___;______;_____l____l___l___j___l 2

02/89 07/01/87 - 10/31/88 2

2 2

2 1

2 2

-____l____________________l___;______;_____j____;___;___;___j PLATE NAME: ROBINSON RWION:

2 UNIT RPT ASSMT. PERIOD OPS BAD 00N MAINT SURV FP EP SEC OUIG QP LIC TBG

==l=====l====================l===l======l=====l====:===l===;===;====l

===;:==l 1 2 01/88 11/01/85 - 06/30/87 2

2 2

1 2

2

'l 1

2 2

2

_____;____ :-________________.__l___;______l_____;-___l___l___l___l____l___l___l___;

2 01/88 05/01/84 - 10/31/85 2

2 2

2 2

1 1

1 2.

2 N

____________________ ___;______;_____;____;___;___;___;____l___;___;__..;

2 08/84 02/01/83 - 04/30/84 2

2 2

1 1

1 2

1 2

2 N

_____;_____!____________________ ___l______l_____;____;___;___;__.l____l___;___l___;

2 09/82 07/01/80 - 12/31/81 2

3 2

2 2

2 2

2 2

N N

_____l_____l_____________ ______l___;______;_____l ___;___l___;___l____;-__l___;___l 2

01/81 04/01/79 - 03/31/80 2

2 2

2 2

2 2

2 2

N N

_ _.. _ _ ; _ _ _ _ _ : - _ _ __ _ _ _ _ _ __ _ _ _ __ _ _ _ l _ _ _ ; _ _ _ _ __ ; _ _ _ _ _ ; - _ _ _ ; _ _ _ ; _ _ _ l _ _ _ l _ _ _ l _ _ _ l _ _ _ ; _ _ _ l t E!G SUPP=3 NUREG-1214 2-35

SALP HISTORY (REACTORS IN OPERATION)

F2Alff !WfE: SBa00YAH REION:

2 UNIT RPT ASStfr. PERIOD OPS RAD 00N M/S EP SEC ET SQ

=====;=====l====================!===;:::::=l::::=l==== :==l :::::::

1 1/2 10/91 03/06/90 - 06/01/91 2

2 2

1 1

2 2

_____;-____[____________________l___;______l_____;____;___;___;___l 2 1/2 07/90 02/04/69 - 03/05/90 2

2 2

2 2

2 2

_____; ____j

__________________;___!______l_____l____l___j.__l___l a 1/2 06/89 02/04/88 - 02/03/89 2

2 2

2 2

3 2

_____l_____l____________________;___g______;_____j.___l___l___;___j 1 M/S-improving

  • OPS.RADorA M/S. Improving 8 ET IMPBCNItU PIANT NAME: SEQUOYAH Fml0N: 2 UNIT BFT ASStfr. PERIOD OPS RAD 00N MAItTT SURV FP EP SEC OUID QP LIC TBG
===::====;::================== :::::::===l=====l====l===j:==l===l::==l===l===l===l 1/2 09/85 03/01/84 - 05/31/85 2

2 3

2 2

2 2

2 3

2 2

_____;_____;____________________;___:______ -____;____;___;___;___;____;___l___

1/2 06/84 01/01/83 - 02/29/84 2

1 1

1 1

3 2

1 3

2 N

___;___l___;___l____l___l___l___;

1/2 06/83 07/01/81 - 12/31/82 2

2 2

1 N

2 3

2 3

2 N

1/2 11/82 07/01/80 - 06/30/81 3

2 2

2 2.

2 2

N 3

N N

_____ ____;.. __________________;___;__=

g ____;____;.__;___;___l____;-__l___;___;

t!URE-1214 2-36 1

J w

SALP HISTORY (REACTORS IN OPERATION)

PLAlfT NAME: ST LUCIE REGION:

2 UNIT RPr ASStfr. PERIOD OPS RAD 00N M/S EP SEC ET SQ

=====;=====l====================;===;======l=====l====;= =l===j===;

1/2 01/91 05/01/89 - 10/31/90 1

1 2

1 1

1 1

_____l_____;____________________;___l______j.___.l____;___l___l_ _;

1 1/2 09/89 11/01/87 - 04/30/89 1

2 1

1 2

1 1

_____;_____l__________ _________l___;______l_____;____l___l___l___l 1 RAD 00N=IMPROVItG PLAffr NAME: ST LUCIE REGION:

2 UNIT RPr ASStfr. PERIOD OPS RAD 00N MAINT SURV FP EP SEC CUIU QP LIC TfG

=====l=========================;===;======l=====;====l===l===;===l=======j===;===l 1/2 03/88 05/01/88 - 10/31/87 1

2 1

1 N

1 2

1 1

1 1

_____l_____;____________________;-__;______l_____:___.;___l___;__

____l___;-__;___;

1/2 08/88 11/01/84 - 04/30/88 1

2 1

1 2

2 2

2 2

1 1

_____;_____;____________________;___;______;-____:-___;___l___;___l____;-__; __l___;

1/2 02/85 07/01/83 - 10/31/84 1

1 1

1 2

1-1 1

2.

1 N

__l___;___;

1/2 12/83 07/01/82 - 08/30/83 1

1 1

1 2

1 2

1 2

2 N

_____l_____; ________.__________;-__;______l_____l____l___;___;_-_l____l___;___;

1 01/83 05/01/80 - 08/30/82 1

1 2

1 2

2 2

1 N

2 N

_____;_____; ___________________;___;_____._l_____;____;___;___;___;____;___;___l___;

1 1

01/81 05/01/79 - 04/30/80 2

2 2

2 2'

2-2 2.

N

-N

_____;_____;____________________;___;______j___.._;____l___;___;_2 100NSTRUCTION RATItOS ARE ASSIGNED FOR REPORTS 1/81 AND 1/83 (UNIT 2),

NUREr'-1214 2-37

SALP HISTORY (REACTORS IN OPERATION)

PLAtTP NAME: SUMMER REION: 2 Ut!IT RPP ASSMT, PERIOD OPS RADCON M/S EP SEC ET SQ

====::::===l=========:::::======j===!======l=====l====l===l:::l::=l 1

11/91 05/01/90 - 08/31/91 1

1 1

2 1

2 1

_ _ _ _ _ p_ _ _ _ p _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ __ p _ _ p _ _ _ _ _ p _ _ _ _ p _ __ p_ _ p __ p _ _ l 1 1 08/90 01/01/89 - 04/30/90 1

1 1

2 1

2 2

_ _ _ _ _ p _ _ _ _ p _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ p _ _ l _ _ _ __ _ p _ ___ p___ p __ p__ p _ _ l 2 1 05/89 08/01/87 - 12/31/88 2

1 1

2 2

2 2

_ _ _ _ _ p _ _ _ _ p _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ p _ _ _ _ ___ _ p_ _ _ _ ; _ ___ p __ p _ _ p _ _

1 FA Improvirs a SECURITY:DECLINItG PLAfff NAME: SUMMER BEGION: 2 UNIT RPT ASSMT. PERIOD OPS FADCON MAINT SURV FP EP-SEC 0(11U GP LIC TIU

=====l:::::i===================::===j======l=====t::==;===l::=l=======;===;==::::::

1 12/87 01/01/86 - 07/31/87

_2 1

1 1

2 2

1 1

2 2

1

_____p____p___________________p__[______ p____p __j.__p__;___p___p__p__p__l 1

05/86 07/01/84 - 12/31/85 3

1 1

2 3

1 1

2 2

2 N

_____p____p__________ ________ p__p_____ p__.._p___p__p__ p._p __p,_p 1

10/84 03/01/83 - 06/30/84 2

1 1

2 2

1 1

N 2

2 N

_ _ _ __ p _ _ __ l __ _ _ __ _ __ __ _____ ___ ; ___ p_ _ _ __ p ___ p _ __ p _ _ p__ p __ p_ __ p_ _ p__ p__ ;

1 05/83 04/01/82 - 02/28/83 2

1 1

2 3

1 2

N N

2 N

p____l______._____________ p__ p_____ p____g____;___;

___ p___ p__ p__ p__;

1 11/82 09/01/80 - 03/31/82 2

N 2~

2 N

1 2

2 2

N N

__ __ p__.p_________

- _ _ __ _ ; __ p _____ p____ p _ __ p __ p__ p__ p_ __ p_ _ p _ _ p__ g 1

01/81 09/01/79 - 08/31/80 2

2 2

2 2

2 2

2 2

N N

_ _ _ _ _ p ___ _ p_ __ _ _ _ __ _ _ _ _ __ ___ _ _ p _ _ p _ _ _ __ p__ _ p _ _ _ p __ p _ _ p _ p ___ p __ p__ p _ _ ;

HURE-1214 2-38

SAL 1? HISTORY (REACTORS IN OPERATION)

PIAltr NAME: SURRY REION: 2 UNIT RPT ASStff PERIOD OPS RAD 00N M/S EP SEC ET SQ

= = = = = l = = = = = : = = = = = = = = = = = = = = =.: = = = = : = = = l = = = = = = : = = = = = ; = = = = l = = = l = = = : = = = l t 1/2 07/91 04/01/90 - 03/30/91 2

1 2

1 1

2 2

_____l_____l________________..._;___;______l_____;____;___;___;._;

a 1/2 07/90 07/01/89 - 03/31/90 2

2 3

1 1

2 2

_____;_____;____________________l___:._____;_____;____l___;___;___;

s 1/2 11/89 05/01/88 - 06/30/89 3

3 3

3 1

2 3

_____;_____;____._______________;___;______l_____l____;___;_.._l___;

1 Orc & SQ 12nproving a RAD 00M: IMPROVING, M/S=IMPROVIIC s OPS. RADCON, AND SQ I,MPROVItG PLANT NAME: SURRY REION: 2 UNIT RPT ASSMT. PERIOD OPS RAD 00N MAINT SURV FP EP SEC OtJIU QP LIC TfG

=====!=====l====================l===;======!=====l=======l===:===:=======:===l===l 1/2 09/88 09/01/86 - 04/30/88 2

2 2

2 2

2 2

2 2

1 1

_____;__..;__._________________.;___l______;____.;____;___;-_.l___l____;___;___;___;

l 1/2 12/86 03/0t 35 - 08/31/86 1

2 2

2 1

2 2

2 2

1 2

____.;--.._ _______-_-__________l___l_-____.___.;-___l___l---l___;--__l-__l___;___;

1/2 05/85 09/01/83 - 02/28/85 2

1 2

3 N

2 1

1 2

1 N

_____; ___. __-________________.;___l-_____;_____l____l___l___:.._l____l--_;___

___l 1/2 02/84 10/01/82 - 08/31/83 2

3 2

1 2

1 1

1 2

1 N

_____;_____; ___________________...;______;_____;____l___;___;___l____;___ --_l___;

1/2 04/83 07/01/81 - 09/30/82 1

2 2

1 2

.2 1

2 2

2 N

_____;___._;_________._____.-___l___l______l_____;____l___;___l___l____;__.l__.;___;

1/2 11/82 07/01/80 - 06/30/81 3

2 2

2 2-N 2

2 3

N N

__;___;___;____l___;___;__

1/2 12/80 05/01/79 - 04/30/80 3

2 2

2 2

2 2

2 2

N N

-l____________________l___;-

--;_____;____;___l_. l_

____;___j___;___;

NURB1-1214 2-39

SALP HISTORY

+

CREACTORS IN OPERATION)

PIANT HAME: TLETEY POItU RB3 ION: 2 UNIT RFT ASStfr. PERIOD OPS RADOON M/S EP SEC ET SQ

=====::====:::::::::============:::::======l:::::l====:== i===:===:

1 3/4 12/91 08/01/90 - 09/28/91 1

2 2

1 1

2 1

_____ ____;____________________;___;______;_____j.___ -__;___ ___

3/4 10/90 08/01/89 - 07/31/90 2

2 2

2 2

2 1

_____l____________________l___;-_____;_____;____;___ ___;___;

3/4 12/89 07/01/88 - 07/31/89 2

2 2

2 3

2 2

_____;-___________________l___;______;_____l____l___:___ ___j 1 Radeon & M/S Im roving, Outage rated a 1

BAD 00N = Imroving, M/S : Ieroving, SEC = Iwtwing -

8 SEC IMPROVItU i

PLATE NAME: TURKEY POItE RB3 ION: 2 UNIT RPr ASSMT. PERIOD OPS RADCON MAltE SURV FP EP SEC OtJIU Q LIC '1TG

==:=====:::==================:===:======:=====::::::==::===:===;: :::. P
===::::!

1 3/4 11/88 06/01/87 - 06/30/88 3

2-3 2

2 2

3 2

2 2

2

_____:-____l____________________l___ ______;_____ ___:___;___:-__;____ -__ ___:___l 8 3/4 11/87 05/01/86 - 05/31/87 2

2 2

2 N

1 3

2 2

2 3

_____;_____;____________________:___;-_____ _____ ____;___ ___;___;____ -__:___ ___l 3/4 08/86 11/01/84 - 04/30/86 3

2 3

2 2

1 2

2 3

2 3

_____:_____;____________________:___:______;_____l____

-__;-__j.__l 3/4 02/85 07/01/83 - 10/31/84 3

2 3

2 2

2 2

2 3

1 N

_____;_____:____________________; __ ______ _____;____;___ ___j.__ ____;___ ___ ___

3/4 12/83 07/01/82 - 06/30/83 3

1 2

2 N

2 2

2 1

2 N

_____;_____ ____________________ ___:______ _____;____;-__l___;___;____;___!___ ___;

3/4 01/83 09/01/80 - 06/30/82 2

1 2.

2 2

2 2

1 N-2 N

3/4 01/81 05/01/79 - 04/30/80 2

2 2

2 2

2 2

2 2

N N

_____;_____;___ _ - ____________ -__ ______l_____;____;___;___;___;____;___;___;___;

1 EtGR SUPPORT-2, OFS & MAINT IMPROVItU a EtGINEERItU SUPEORT RATED 3 NUREU-1214 2-40

SALP HISTORY (REACTORS IN OPERATION)

PLANT NAME: VCGTLE rem 0N:

2 UNIT RPP ASStif. PERIOD OPS RAD 00N M/S EP SEC E7 SQ

=====l=====l===================nl===;======l=====l====l===l===l===!

1 1/2 11/91 10/01/90 - 09/28/91 2

1 2

2 2

2 2

..___l..___j.___________..._____; __l______l_..__;

  • 1/2 01/91 10/01/89 - 09/30/90 2

1 2

.3 3

2 2

_....;__...;______.._. _______..j...l_____ j_____l___ l__

!_...l___j 8 1/2 01/90 10/01/88 - 09/30/89 2

2 1

2 2

2 2

_____l_____l___

...____________j___l

__;_..._l_. _;

1 01/89 10/01/87 - 09/30/88 2

2 2

1 2

2 2

_____!.. __l_____________..____;___l______;__...;-___;..

l___;_-_;

1 SEC & E/T Incre.avirs 2 EP-Inprovirs 8 BAD 00t1 IMPROVItG; SEC DECLINItC: UNIT 2-PFEOP & STABTUP RATED 1 PLA!C' NAME: VCm LE FB3ICti: 2 UNIT RFT ASS!fr. PERIOD OPS RAIC0t1 MAI!!T SURV FP EP SEC OLTN QP LIC TBG

=====;=====l====================l===l======;=====;====;======;===l====:===l======;

1 1 03/88 10/01/88 - 09/30/87 3

2 1

2 2

1 3

N 2

2 1

_ _ _ _ _ l _ - _ _ _ l _ _.... _ - _ _ -_ - _...... l _ _ _ l _... _ _ l _ _ _ _ _ l _ _ _ ; _ _ _ l.. _ ; - _ _ ; _ _.. l. _. l.. _ - _ _ l 1 PREOP TEST =2.STARTUP TEST =2, OPS & SEC IMPROVI!G l

l NUREG-1214 2-41

l SALP HISTORY (REACTOBS IN OPERATION)

PIA!E NAME: BIG BOCK IOltR REGION:

3 l

UNIT RPP ASSMT. PERIOD OPS BADCX)N M/S EP SEC ET SQ

===!====

l:=====:::::::::::::=l:==l::::::l=====l====!::=;===t:==l 1

12/91 05/01/90 - 09/30/91 2

2 2

1 2

2 2

_____:_____:____________________:___l______;_____:____l___l___l___l t 1 08/90 01/01/89 - 04/30/90 1

2 1

1 2

2 2

_____l_____g____________________l___;______l_____;____ -__!___;-__l 1

05/89 09/01/87 - 12/31/88 1

2 2

1 2

2 2

_____l..____;____________________l __l______l_____l____;-__l___l___l 1 SQ Improving PLA!E NAME: BIG FOCK ICItR BEGION: 3 Ut1IT PFr ASSMT, PERIOD OPS RADCON MAINT SURV FP EP SEC OWU QP LIC TPG

=l====:l::_=:::= ::::::=====l===l======j::===l=======l===;===l..:==;===l:==l===l 1

03/68 04/01/86 - 08/31/87 1

2 2

1 2

2 2

2 2

1 2

_____;_____;____________________;___;______;_____;____;___l___l___;____ ___j___l___;

1 02/87 11/01/84 - 03/31/86 2

2 2

2 2

1 1

3 2

1 1

_____l____________________;___;______

____;____;___ -__l___;____l___;___l___l 1

07/85 07/01/63 - 10/30/84 1

2 2

1 2

1 1

1 2

2 N

_____l_____l____________________l___l______;_____;____l___l___l___l____l___l___l___l 1

10/83 07/01/82 - 06/30/83 1

2 1

1 2

1 1

N 2

2 N

_____l_____;____________________l___l______l_____;____l___;___l___l____l___l___l___l 1

12/82 07/01/81 - 06/30/82 1

3 1

2 2

2 2

1 N

2 N

_____l_____l____________________l___l______l_____l____;___l___l___...__l___l___l___l 1

07/82 07/01/80 - 08/30/81 1

2 2

2 2

2 1

1 2

2 N

_____:_____:____________________:___l______l_____l____l___:___l___;____:___:___;___l 1

02/81 09/01/79 - 09/30/80 2

3 1

1 2

2 2

2 2

N 2

_____l_____l____________________;___l______;____..;____;___;___;-__l____;___;___;___;

NUBEG-1214 2-42

=

SA T.P HISTORY (REACTORS IN Ol'ERATION)

PLA!U HAME: BRAIDWOOD IO3 ION: 3 UNIT ffT ASSiff. PERIOD OPS RAD 00ri M/S EP SEC h7 SQ

=====:=====:====================l= =!======l===== ::::===:===t===l 1/2 07/91 02/01/90 - 04/30/91 2

2 1

1 1

2 2

_____;_____l____________________l___;______l_____;____!..j.__!___l 1 1/2 05/90 02/01/89 - 01/31/90 2

2 1

1 2

2 2

_l_ ___ -___________________;___; _____!_____;____l___!___l___;

1/2 06/89 01/01/88 - 01/31/89 2

2 2

1 2

2 2

_____l_____l____________________;___l______l_____l____; __;___j.__l 1 OPS, RAD 00N & SEC Imp 1m ing PLAtC NAME: BRAIDWOOD RB3 ION: 3 UNIT RPT ASStfr. PERIOD OPS RADCON MAINT SURV FP EP SEC Ot.TIU QP LIC TBG

=====l===== ::::::===== :=======l:==l======l=====j====l===l===j===l====l===l===j===l 1 1/2 05/88 12/01/88 - 12/31/87 2

2 2

2 2

1 2

N 2

2 1

_ _ _ _ _ ; _ _ _ _ _ l _ _ _ _ _ _ _ _ _ _ _ _ __ __ _ _ _ _ l _ _ _ ; _ _ _ _ _ _ ; _ _ _ _ _ l _ _ __ ; _ _ _ ; _ _ _ ; _ _ _ ; _.,_ _ ; _ _, ;._ _ j._ _ l 1/2 05/87 12/01/85 - 11/30/88 1

2 N

N 2

2 2

N-1 2

2

_____ _____;____________________;___ ______l_____ ____;___ ___; __;____ ___l___;___

1 PREOP /STARTUP TEST 2; CONST 2: EtG SUPP 2 i

l l

l I

1 NUREG-1214 2-43

.~ -.

-.-.-..-_._..n.--

i

.1 1

I.

d j

SALP HISTORY (REACTORS IN OPERATION)

PLAlfr NAME: BYRON RiiGICH: 3 1

i UNIT RPT ASSMT, PERICO OPS RAD 00H M/S EP SEC ET SQ -

=====l=====l:::=================l===l======[=====l====l===l===l_===l 1/2 11/91 04/01/90 - 08/31/91 1

1 1

.1 _ 1 -

2 1

j

___._l_____l___________.________l___l_____.l_____l____;- _l___l___;

1 1/2 07/90 11/01/88 - 03/31/90 1

1 1

-1 1

2

_____l_____l___________.._______.l___l______l_____l____l___l___l_2

__l 1/2 03/89 11/01/87 - 10/31/88 2

2

.1 1

1 2-2

_____!.________.__________l___l______g_____l.___l___l___l___l 1 SEC-Declinirs a

t n

4 s

l:

FLAlfr NAME: BYRON BIGION: 3 UNIT RPT ASSMT. PERIOD-OPS RAD 00N MAltfr SURV FP EP ~ SEC OCTTG QP ' LIC TBG i-

===l::::=l====================l===j======!=====l====!===l===l===l====j===l===1
=l_

1 1/2 03/88 11/01/86 - 10/31/87

'2 2

2 2;

2-1 1

2-1 1-

_____;_____ __. ________________ ___;______ _____ ____l___;__.!___;-___!_2-a 1/2 05/87 11/01/85 - 10/31/86 2

2 2

-2~

2 1

2 1

2 2

-2 j

_____l.____l____________.

. ___.!___t. ____l_____l____!___j___l___j____l___;___l___;_

1/2 04/86 05/01/84 - 10/31/85 3

3-2-

3 2

l' 3

N-2-

2.N 4

. ___;.____l____________________;___;______;_____l____;___;___;..

l__..l___j. _j.__l

1 09/84 01/01/83 - 04/30/84 N

2 N.

N 3

2 2;

-N' 2

2 N-

_____l_____;_________________._;_..;______ _____.___;___ ___;.._;____; __ ___;-__;

1 PREOP & STABTUP TEST =2.Et0IN/ TECH SUPPORT =2 -

a CONSTRtCTION RATINGS WERE ALSO ASSIGNED EDR REEORTS-7/84,1/86. AND'1/87:-

4 9

1 4

t 1

1 J

g 4

el T

a 1

1 P

NUREG-1214 2-44

,m v

,v

SALP HISTORY CREACTORS IN OPERATION)

PLAlff NAME: CALLAWAY REION: 3 UNIT RPT ASStfr. PERIOD OPS RAD 00H M/S EP SEC ET SQ

=====l=====l====================;===l======;=====l====l===l===l===;

1 1 05/90 09/01/88 - 01/31/90 1

1 1

1 1

1 1

  • 1 12/88 06/01/87 - 08/31/88 2

2 1

1 1

2 1

_____;_____;____________________l___;______!_____l____;___;___;___;

1 SEC, Delining a OPS IMPROVItG PLAfff NAME: CALLAWAY '

REION: 3 UNIT PFT ASSMT, PERIOD OPS RAD 00tl MAllif SURV FP EP SEC 0010 QF LIC TIU

=====;=====;====================l===l======;=====;====;===;======l====;===l===;===l 1

10/87 06/01/86 - 05/31/87 2

-2 1

2 N

1 1

1 1

1 1

__;___l___;____;___l___;___;

1 12/86 06/01/85 - 05/31/86 2

2 2

1 1

2 1

1 2

2 1

_____;_____l____________________;___;______;_____ ____;___;___;___l____;___;___;___l 1

10/85 12/01/83 - 05/31/85 2

2 2

2 1

2 2

tl 2

1 N

_____;_____l____________________l___;______j_____;____l___;___;___;____l___l___;___;

1 1 04/84 10/01/82 - 11/30/63 N

1 N

N 2

N 2

N 2

1 N

_____;_____;____________________;___;______;_____l____l___;___;___l____;___l___;___;

1 06/83 10/01/81 - 09/30/82 N

2 2

1 N

-2 2

N 1

1 N

_____;_____;____________________l___l______;_____;____;___;___l___;____;___ ___;___;

1 00NSTRUCTION RATItOS WERE ALSO ASSIGNED.

NUREG-1214 2-45

SALP HISTORY (REACTORS IN OPERATION)

PIANT NAME: CLINION REION: 3 UNIT RPr AE6MT. PERIOD OPS RADOON M/S EP SEC ST S2

====:=====l====================l===l======j=====l====l===l===j===l 1 1 06/91 11/01/89 - 01/31/91 2

2 2

1 2

2 2

_____l_____l____________________l___!______l_____j

___l___l__.j __l 2 1 03/90 09/01/88 - 10/31/89 2

2 2

1 2

3 2

_____l_____l____________________l___l______l_____l____l___l___l___l 1

01/89 09/01/87 - 08/31/88 2

2 2

2 1

2 2

..____l____-l____________________l___l______l_____l____l___l___l___l 1 EP Declining a RAD 00N IMPROVItG: OUTAGES RATED CATEORY 3 PLA!TP NAME: CLINIVti REGIOti: 3 UNIT RPT ASSMT PERIOD OPS RADCOt1 MAINT SURV FP EP SEC 0010 QP LIC TRG

=====l=====l====================:=========j=====l====l===l===l===l====l===l===j===l 1 1 61/88 09/01/88 - 08/31/87 2

2 2

2 2

2 2

N 2

1 2

_____;_____l____________________l___l______l_____l____l___l___l___l____l___l..__l___l 2 1 04/87 09/01/85 - 08/S1/86 2

2 3

N 2

2 2

N 3

2 N

_____l_____:_________-__________l-__l______l___ _l____l___l___l_,._l____l___l___l___l 1 PREOP TEST =1 cot 1STRILTIOtt RATItOS WERE ALSO ASSIGNED, NUREG-1214 2-46

SAT /P HISTORY (REACTORS IN' OPERATION)

ILART NAME: 000K RFRION: 3 UNIT RPF ASStfr. PERIOD OPS RAD 00N M/S EP SEC hT SQ

==== ::::=::::::=============== :==j===========!:::

=====:===

1 1/2 12/90 07/01/89 - 08/31/90 1

'3 1'

1 3

2

_____l_____l____________________l___l___2

___l_____l____l___;___ ___l 1/2 10/89 03/01/88 - 06/30/89 1

2 2

1 2

-2 2

_____l_____l____________________;..__l______:_____ ____ ___ ___;___

1 M/S = Improving PLANT NAME: 000K REGION: 3 UNIT RPT ASStfr. PERIOD OPS RADCON MAINT SURV FP EP SEC OCTIU QP LIC TRG

=::::::::===___u ___::===___;:==:====== :::==::::::::::::::::::==== ::::::::===

1 1/2 07/88 10/01/86 - 02/29/88 2

2 2

2 1 2 2

2

_ 1_

2 1

2

_____;_____!____________________l___;-_____!__..__ ____;___ -__l___ ____,!___l___

1/2 04/87 10/01/85 - 09/30/88 2

2 2

2-2 2 - 2.

1 2

2 2

____l________________;.___l___:._____;_____

___;____l___;___;___

1/2 05/88 04/01/84 - 09/30/85 2

2 2

3~

2 2.-3

=2

-3 1-N

_____;_____ ____________________ ___;______ _____ ____ ___;___ ___l____ ___;___ ___

1/2 08/84 04/01/83 - 03/31/84 2

2 2

2 2

-2 2.

=1 3

2 N

_____:_____l_.__________________;___;______!_____;____

___g___!____l___l___ ___;

1/2 08/83 04/01/82 - 03/31/83 2

2 3

2:

3-2 2

2 3

2 N

-__-;___;____;___l___!___

1/2 10/82 10/01/80 - 04/01/82 2

2' 2

3 -

3'-

3 2-2 3: -3 N

_____l_____l____________________l___ ______:_____-l____l___ ___l___l____;___ -__;___

1/2 02/81 10/01/79 - 09/30/80 2

2 2_

2 3-

3. _ 2 2

2N N'

_____l____________________

___l___l___j ___l___l___ ___l 1 EtG SUPP=2; OPS AND SURV IMPROVING NUREG-1214-2-47

i 1

SALP HISTORY (REACTORS IN OPERATION) 2 FLA!U HAME: IWVIS-BESSE REION: 3 UNIT RPT ASSMT PERIOD OPS RAD 00N M/S EP SEC ET SQ

----l=====l====================j===;======l=====;====j===;===;===l 1 1 11/90 03/01/89 - 06/30/90 2

2 2

1 1

2 2

_____l_____l___._________________;___l______j_____l____;___;-__;-__

1 07/89 01/01/86 - 02/28/89 2

2 2

1 1

2 2

_____;_____;____________________;___;______;_____;____;___;-__l___l 1 OPS = Declining, M/S = Improving PLA!U HAMS: DAVIS-BESSE REION: 3 UNIT RPT ASSMT. PERIOD OPS RAD 00N MAltU SURV FP EP SEC CUN QP LIC'TRG

l=====:====================;===!======l=====;====;===;===;===!====;===;=

1 1 06/88 11/01/88 - 12/31/87 2

1 2

1 3

2 1

1 2

2 2

_____l_____p___________________l___;______:_____;____l___;___l__-l____l___l___l___;

2 1 09/87 09/01/84 - 10/31/88 N

N N

N N

N N

N N

N N

_ _ _ _ _ l _ _ _ __ ; _ _ _ _ _ _ ___ _ _ __ _ _ _ _ _ _ _ l _ _ _ ; _ _ _ _ _ _ - _ _ _ _ l _ _ _ _ ; _ _ _ ; ___ ; _ __ ; -_ __ l _ _ _ j _ _ _ l _ _ _ l 1

04/85 04/01/83 - 08/31/84 2

1 3

2 3

3 2

1 3

2 3

_____;_____;____________________;___l______;_____;____l___l___;--_l____;___l___;-__;

1 10/83 04/01/82 - 03/31/83 2

1 3

2 2

2 2

1 2

2 N

_____;_____;-___________________;___l______;_____l____l___l___l___;____l___l___;___l 1

09/82 11/01/80 - 03/31/82 2

1 3

2 2

1 2

1 3

2 N

_____l_____;---____,._______..____l. _l______l_____;____j.__j___;___; ___;___;___;...;

1 12/80 11/01/79 - 10/31/80 2

2 2

2 2

3 3

2 2

N N

_____;_____l______

___________;-__l__ ___;-____;____l___;___;

__._l_,.;___;___;

1 EtU SUPP 2 2 NO RATItOS ASSIGNED IN SALP PERIOD 5 NURE-1214 2-48

SAIW HISTORY (REACTORS IN OPERATION)

PLANT NAME' DRESDEN REGICN:

3 UNIT RPT ASSMT, PERIOD OPS RAD 00N M/3 KP SEC ET SQ

=====;=====j====================;===p=====!=====;====;===;===;===;

2/3 11/91 05/01/90 - 07/31/91 2

2 2

1 1

2 2

_ _ _ _ _ ; _ _ _ _ _ p _ _ _ _ __ _ _ _ _ _ _ ___ _ _ __ p__ p _ _ _ _ _ p _ _ _ _ p _. ; _ _ _ p __ p _ _ l 1 2/3 08/90 02/01/89 - 04/30/90 1

2 2

1 1

2 2

_ _ _ _ _ p _ _ _. ; _ _ _ _ __ _ _ _ _ _ _ _ _ __ _ _ _ p _ _ p _ _ _ _ _ p _ _ _ _ ; _ _ _ _ p__ p _ _ p _ _ ;

a 2/3 05/89 02/01/88 - 01/31/89 1

2 2

1 2

2 2

_____;_____l____________________;___;______;_____;____;___;___;-__;

1 SQ Imprr>ving a SEC AND SQ IMPROVItU PLANT HAME:

DRESDEN REGION: 3 UNIT RPT ASStir. PERIOD OPS RADCON MAINT SURV FP EP SEC OUIG QP LIC TBG

=====:=====;====================;=========l=====;====l===l===;===:====;===;===;===;

1 2/3 06/88 01/01/87 - 01/31/88 2

2 3

2 N

2 2

N 2.

2 2

_____;_____; ___________________;___;-_____;_____;____;-__;___; __;____;___;___;___l 2/3 06/87 10/01/85 - 12/31/86 2

2 2

2 3

2 2

2 3

1 2

_ _,, _ _ p _ _ _ _ l _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ p _ _ p _ _ _ _ _ p _ _ _ _ p _ _ _ p _ _ p_ _ l _ _ _ ; _ _ __ ; _ _ _ p _ _ p _ _ ;

1/2/302/88 06/01/84 - 09/30/85 2

2 2

2 2

1 2

1 2

1 N

1/2/302/85 01/01/83 - 05/31/84 2

3 3

1 2

1 2-1 2

2 N

_____;-____;____________________;___;______;_____l____;___l___;___;____;___;___;___;

1/2/307/83 01/01/82 - 12/31/82 2

2 3

2 2

2 1

1 2

1 N

_____;_____;____________________;___;______;_____;____;___;__.j __l____l___l___;___;

1/2/312/82 07/01/80 - 12/31/81 3

3 2

2 3

1 1

1 3

1 N

_ _ __ p _ _ _ _ p _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ p _ _ ; _ =

-- ; ____ _ p __ _ p__ p__ p _ _ p __ _ p__ p __ p__ ;

1/2/311/80 07/01/79 - 06/30/80 2

3

'2 2

2 3

2 2-2 N

2

_____;_____;____________________;___;______l_____;____;___l___;___;____;___;___;___;

1 OPS EP-IMPF0VING NUREG-1214 2-49

SALP HISTORY (REACTORS IN OPERATION) 19 ANT NAME: DUANE ARNOLD REGION:

3 UNIT RPF ASStif. PERIOD OPS RAD 00N M/S EP SEC ET SQ

=====l=====l====================l===j======l=====:====l===l===j===;

08/91 01/01/90 - 03/31/91 2

2 2

1 2

3 3


l-----l_----_--_---_ -----_l---l------;-----:---_ ---l--_ -__:

1 04/90 11/01/88 - 12/31/89 1

2 2

2 2

2 2

--___l-----l--_-_-___----_---_--l---l------l----_;--__l__

---l---;

a 03/89 06/01/87 - 10/31/88 2

2 2

3 2

2 2

---__;-_-_-;..._----_--__---_----.;---;-_----l-_---;---- --- -__;---;

1 EP Improvirs 2 EP - IMPROVItG PLATE NAME: DUANE ARWJLD REGION: 3 UNIT RPr ASSMT. PERIOD OPS RAD 00N MAltE SURV FP EP SEC OU'IU QP LIC TTG

=====l=====!==================================;====l===t===l===;=======j===:===l 01/88 03/01/86 - 05/31/87 1

2 2

2 1

2 2

1 3

1 2

--_--l-----l--------------------l---l------ -----l--_-l-_-l--_l_--l----l---l-_-l---l 06/86 09/01/84 - 02/28/86 1

2 2

2 1

1 2

-2 2

1 2


l-----l--_-----_ ----------l-_-l------l


l---l---l---l-_-_l_--l_--l---l 03/85 04/01/83 - 08/31/84 1

2 1

3 1

2 3

N N

1 N


l--_.:----------------_---l---l-_----l---_-l----l---l_-_:__-:_---l---;---l-_-l 07/83 04/01/82 - 03/31/83 2

2 1

2 2

2 2

2 2

2 N

_---_;-----l--_--------------_--l--_;----_-:--_--;--_

---l-__;---l-_--

---l___;

10/82 09/01/80 - 03/31/82 3

2 2

2 3

2

-2 2

3 2

N

_----:----_l---__---------------l_--l

--__-l----l--- ---:---l__-_l---l-_-l---l 12/80 09/01/79 - 08/31/80 2

3 2

2 2

3 2

3 2

N 2

1


:-----l---------------__--- ---l...

_----l----l--- ---l---l----l---l---l_--l NURE-1214 2-50

SALP HISTORY (REACTORS IN OPERATION)

PLAtU NAME: FEBMI BB310H:

3 UNIT RPF ASSMT, PERIOD OPS RAD 00t1 M/S EP SEC ET SQ

=====l=========================!===:======:=====:====l===l===j===l 12 05/91 01/01/90 - 02/28/91 2

1 2

2 1-2 2

_____l_____l____________________l___l______;_____l____l___l___l___l 22 04/90 01/01/89 - 12/31/89 2

1 3

1 1

2 2

_____l_____!____________________l___l______;_____l____l___l___l___l 32 05/89 04/01/88 - 12/31/88 2

2

?

1 1

3 2

_____l_____l____________________l___

_____l____l___ __.l___l 1 PAD 00N Declining a M/S Improving. SK Declining 3 SUBVEILLANCE EVALUATEtiSEPAPATELY'- FATED 2' PLAtU NAME: FEBMI FB3Kti:

3 UNIT RPF ASSMT. PERIOD OPS BADCoti MAItU SURV FP EP -SEC OUTG QP LIC TBG

=====:=====:====================:==============l====:======l===l====l===:===:===:

12 08/88 04/01/87 - 03/31/88 3

2 3

3 2

1 1

2 3

2 2

_____l_____;____________________ ___;______l_____ ____l___: __l___:-___ ___;___ ___l 22 01/88 04/01/88 - 03/31/87 3

2 2

3 ti 1

2 2

2 2

3

_____l_____l____________________l___l______: ____l____l___l___l___l____:

___l___l 32 05/87 07/01/85 - 03/31/86 N

N N

N N

N N

11 N

N N

_____ _____:____________________ ___l______ _____;____l___ ___l___l____l___ ___l___l 4 2 02/86 10/01/84 - 06/30/85 2-2 2

2 3

1 2

1 2

2 N

_____:_____l____________________:___ ______:_____l____

___l___l____:___:___l___l 1 EtU/ TECH SUPP:3 2 STARTUP TESTItG=1 310 FATItOS WERE ASSIGtE DUE TO LACK OF OPERATIt0 PERF0EdANCE.

4 00NSTBUCTKti RATItBS WEFE ALSO ASSIGtE.

NURS3-1214 2-51 1

SAILP HISTORY (REACTORS IN OPERATIOl9 )

PL ET HAME: KEWAUNEE REIm:

3 UNIT RPT ASSMT. PERIOD OPS RADCON M/S EP SEC ET EQ

=====;:====;:::=================l===;::====l=====;====; :::::=::==l 04/91 12/01/88 - 11/30/90 1

1 1

1 2

2 2

.... ;_____: ____..___.____...l.._;-_____l___._l.__.l.._l__.;___;

03/89 07/01/87 - 11/30/88 1

1 1

1 1

1 1

.....l....;________

__l

__;_._.. j __ _;..j...j..:.__l PL WT NAME: KEWAUtEE BMION: 3 UMIT RPT ASStfr. PERIOD OPS RADCON MAltfr SURV FP EP SEC OCTIU QP LIC TBG

=====;=====;:::::::=============!===;::::==;=====::===;:::j:::::::l====:::=;===;::=;

09/87 01/01/86 - 06/30/87 1

1 1

1 1

1 2

1 1.

1 1

. ___ ;... _. ;.. _ ___ _ _..__ _ _ _.... l _ _ _ :...... ;... ;

08/86 07/01/84 - 12/31/85 1

1 1

2 1

1 2

1 2

1.

N l_____.

...._______l_._j._____l___

l. _;___l._.-;

__j.....;

11/84 04/01/83 - 06/30/84 1

1 1

1 1

2 2

1 N

2 N

_____;. __;-_____.... ______;. _; ___ _l___..;__

].__;...

l.__;...

11/83 04/01/82 - 03/31/83 2

2 1

2 1

2 2

1 N

2 N

_..._;.....;___.. ____..___-.. _;.._;_.....;_....;. __l...l...;__.;_..;. _;__..__l 07/82 11/01/80 - 03/31/82 1

1 1

2 2

2 2

1 N

2 N

.__
.__j

..;_.._l___:.__l

--l 12/80 11/01/79 - 10/31/80 2

2 2

2 2

3 2

2 2

N 2

..___;_____;_.._____...... ___;__.]__.-.;____ ;_ __...;__ l_.l_...;...;_.

NUBEG-1214 2-52

SALP HISTORY (REACTORS IN OPERATION)

PIR R HAME: 14 CROSSE REGION: 3 UND RPr ASSMT, PERIOD OPS RAD 00H MAItE SURV FP EP SEC O(JIU QP-LIC TIG

===;::::::====================;===;::====;::::=;:::::::=:===;::=;:::=;::::===;::::

1 07/87 01/01/85 - 06/30/86 2

2 3'

1 2

2 2

3.

2 1

2

____._;...,_;_,__________________;___l______

___l 07/85 07/01/83 - 12/31/84 2

2 2

1 1

2 2

'N 2

1 N

_____;_____;____________________;.. ;______l_____l____;___;___;___j_ __l___; __;___;

11/83 07/01/82 - 06/30/83 2

2 2

2 1

2 2

N N

2 N

_____;_____l_______

_;___;______;_____;____l___;___;___;____;___;___;___;

01/83 07/01/81 - 06/30/82 3

2 1

2 2

3-2-

2 N

2 N-06/82 07/01/80 - 06/30/81 3

2 2

2 2

3 2

2 2

N N

s..___ ___.._____ __ _;___;______;_. _;__ _; __;___;___;____;___ __;___;

01/81 08/01/79 - 07/31/80 2

3 2

2 2

3 3

2 2

N 2

1 PERMA!ETT SHttrIDiN 04/30/87,

[

NUBEG-1214 2-53

1 SALP HISTORY (REAOTORS IN OPERATION) 19A!C MAME: 1ASAILE REGION: 3 UNIT RPT ASSiff. PERIOD OPS RAD 00N M/S EP SEC ET SQ

==========;====================;===;======;=====;=======;======:

1 1/2 02/91 07/01/89 - 09/30/90 1

2 2

2 2

2 2

_____;_____;____________________l___;______;_____;____;___;-__;-__;

  • 1/2 10/89 03/16/88 - 06/30/89 1

2 2

1 2

2 2

1 M/S. SEC, SQ = Inproving a SEC IMPROVItU 4

PIAlfr NAME: LASALLE REGION: 3 UNIT RPT ASSMT. PERIOD OPS BAD 00N MAllE SURV FP FP SEC OUIG QP lib TBG

=====l=====!====================;===;======;=========;===l===;===;====l===;===t===;

1 1/2 08/d8 11/16/88 - 03/15/88 2

2 2

2 2

2 2

2_ _2 1

2

_____;_____;____________________;___;______;_____;____;___;___l___;____;___l___;___;

1/2 04/87 10/01/85 - 11/15/86 2

2 2

2 2

2 2

2 2

2 2

_____;-____;____________________!___;-_____;_____;____l___l___;___;____;___;___;___;-

1/2 04/86 05/01/84 - 09/30/85 3

2 3

3 1

2 2

N 3

2 N

_____l_____;____________________;___;______;_____l____;___;__ ;___;____;___ ___;___l 8.1/2 02/85 01/01/83 - 04/30/84 3

2 2

2 2

2 2'

1 2

2 N

___-__;-____; ___________________;___; _____l__.__l____;___; __;___j____j.__;___;___;

1/2 07/83 01/01/82 - 12/313 2 2

2 1

3 2

2 3

l N

2 N

_____j.____l____________________l_._;______; ____;____;___;___l___;____'l___j..__;___g_

3 1/2 11/82 07/01/80 - 12/31/81 N

2 2

3-2 2

.3 N

2 2-N

_ _ _ __ ; __ _ _ ; _ _ _ _ _ _ _ _ _ _ ___ _ _ _ _ ___ ; -__ ; ___.__ ; _ _ ___ : __ _ _ l _ __ : -_ _ ; _ _ _ l _ ___ ; _ _ _ ; ___ ; _ __ ;

1 EtG SUPP=2 2 SURV, RATED UNIT 1 OtLY: LIC. AND UIU. BATED UNIT 2 OtLY (8/84 &2/86)._-

3 RATItOS IN REP 0BTS 11/82 AND 7/83 ARE EDR UNIT 1 ONLY.

5 NUREG-1214 2-54

SALF HISTORY (REACTORS IN OPERATION)

PIAlff !WiE: MOffrICELLO REGION: 3 UNIT RPT ASSift. PERIOD OPS RAD 00N M/S EP SEC ET SQ

= ::::::====:::::::::::::::::::======;:::::;::::::==:::::::=;

09/90 03/01/89 - 08/30/90 1

2 1

1 2

2-1 08/89 12/01/87 - 02/28/89 1

1 1

1 3

2 2

_____;_____;.. _________________;-__;______;_____;-___l___; __;___;

PLANT NAME: MOtfrICELLO REGION: 3 UNIT RPT ASSMT. PERIOD OPS RAD 00N MAltff SURV FP EP -SEC CUIU QP LIC TRG

===::::::::! ::::::============::::=;=====:::::=;:::=;===;::=::==;::::::::::::::=:;

1 04/88 08/01/88 - 11/30/87 2

1 1

1 1

1 2

1 2

1 2

_____;_____ ____________________;___._____;_____;____j___l___;___;____;___; __l___

11/86 12/01/84 - 05/31/88 1

1 1

2 1

1 1

1 2

1 2

04/85 07/01/83 - 11/30/84 1

2 1

2 2

1 1

1 2

1 N

_____;-____l____________________;___;______ _____;____.. ;___; __ ____:___ ___;___l 10/83 07/01/82 - 08/30/83 2

2 2

1 2

1 1

1 N-2 N

12/82 07/01/81 - 08/30/82 1

2 2

1 2

1 1

1 N

1 N

_____;____..:____________________ ___l______;_____;____l___l___;___;____;___ ___l___l 05/82 07/01/80 08/30/81 1

2 1

1 2

2 2

1 N

N N

_____;_____;____________________;___;-_____l_____;____l___l___ ___:-___l___

01/81 10/01/79 - 09/30/80 2

3 2

2 2

3 2

2 2

N 2

l

_____l_____;_____________

______l_____;____;___;___l___l____

t i Et0/fECH SUFFORT:2 l

i I,

HUREG-1214 2-55

SALP HISTORY (REACTORS IN OPERATION)

PlAtU HAME: PALISADES REDION: 3 UNIT RPT ASSMT. PERIOD OPS RAD 00N-M/S EP SEC ET SQ

i:::: 1:===================;:::::::::::::::

l====l===l

= h =j 1

04/91 09/01/89 - 19./31/90 1

2 1

2 1

2 2

_____;.____l____________________ ___;______l_____l____l___j __:-__l 01/90 08/01/88 - 08/31/89 2

2 2

1 1

2 2

_ _ _ _ _ l _ _ _ _ _ l _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ; _ _ _ l _ _ _ _ _ _ l _ _ _ _ _ l _ _ _ _ ;. _ l _ _ _ ; _e _

1 EP & ET declining

  • OPS & M/S - IMPPOVItU 4

PLA!U HAME: PALISADES PEGION:

3 t

UNIT BPr ASStfr. PERIOD OPS BADCON MAI!U SUBV FP EP SEC OIJiu QP LIC TIC

=====::::==:============== :==== :== :=====:=====;====:::::===::==::===;::::===[:==l 1

09/88 05/01/87 - 05/31/88 2

2 2

1 3

1 1

1 2

2 2-4

_____;_____:---_________________ ___ ______ _____;____;___;___;___ ____;___;___l___g 12/87 11/01/85 - 04/30/87 2

2 3

2 2

2 2

2 3

2 2

_____l_____;-_____.___________,._;___

..___ -____ ____:. _;___ ___;____ ___ ___t___!

05/86 11/01/84 - 10/31/85 2

2 3

3 2

2 2

N 3

2 N

08/85 07/01/83 - 10/31/84 2

2 2

2 2

2 2

1 2

2 N

_____l_____ ____________________;___ ______;_____;____ ___ ___:-__;-_. ;___ ___ -__

10/83 07/01/82 - 06/30/83 1

2 2

1 2

1 2

N 1

2 N

-___l___;...;___l____;___;___l___;

01/83 07/01/81 - 06/30/82 2

3 2

1 2

2 2

2 2

2 N

l

_____i

___:____________________;___:______i_____ ____ __;___ ___l____ ___:___;___:

)

07/82 07/01/80 - 08/30/81 2

2 2

3 1-2 2

.2' 3

3 N-i

____________________l___

_____l____;___;___ -__ ____;___;___ ___;

02/81 09/01/79 - 09/01/80 3

-3 2

3 2

2 2

2 2 -- N 2

_____j ____;____________________;___l______: ____l____:-__;___j __l____j.__;___l___l 1 ElG/TECN SUPP-2: OPS-IMPB0; LIC-DECLI NUBEG-1214 2-56

i SALP IIISTOIW i

1

( BlIACTORS IN OPIERATION )

it4tfr !WiE lYRIN 10J1(41' 3

Utili FIT ASEMr. PERIOD OPS RAIO0t{ H/8 EP SEC ET SQ

=====[::::=l ::::::::::::::::::=l :

t======l ::::l:::=l===l===] :=l 11 12/91 08/01/90 - 10/31/91 2

2 2

1 1

2 2

.....l.....]...................l...l......l.....l...l...l...l...l 1

11/90 06/01/09 - 07/31/90 2

2 2

1 1

2 2

.....l.....l j...l......l....

l....j...l...l...l 1

10/89 05/01/88 - 0$/30/89 2

2 2

1 1

2 2

.....l.....l...................l...l......l.....l....l...l...

...l t ET Inannirs 8 M/S : Irelinirs PIAlfT I4AME:

PERIN l@i!Oth 3 Uti1T KIT ASEMT. PERIOD OPS BAIOcti MAltfr SURV FP EP SEC CUIU QP LIC TIG

=l===::!
=l::::::l:::::.l :::!n::l===l===l::::l:::::::l===l l

1 1 09/88 05/01/87 - 04/30/88 2

2 2

2 ti 1

1 11 2

2 2

l.....l..

......l...l.....l....

l....l...l...l...l....l...l...l...!

1 01/88 06/01/80 - 04/30/87 2

2 2

2 2

1 1

t{

2 2

2

...l

....l...

l...l......l....t....j..

j...]...l......l...l...l...l 1

08/06 07/01/85 - 04/30/86 2

2 2

2 2

1 1

t1 2

1 2

.....l...

l...]......]....l...l...l...j...l...

l...l...l...l 1 EtG/TECli SUITt2

CotGTBlXJT1011 BATIlGS ALSO ASSIGNED.

NUEEG-1214 2-57

,e-s,-,,-mr e m

,,.nv~

r~ ~, -,-

--w,-,,,-

-~

,-r

<w..

.m.c

--crn-

., - +

-r,-tm,,ws-

<w,<

~

SAL.P HISTORY (REACTORS IN OPERATION)

I MIE 1%ME: loltU BFEH RWIOti: 3 (AIIT PJT ASSMT PERIOD OPS RADCott M/S EP SEC ET SQ

=1:::::l==============:::::=1:: i :::: !:n : l :::I===l==l::::

1/2 01/91 04/01/89 - 08/31/90 1

2 1

2 2

2 2

.....g....l...................l...;......l......l....l...l...l...!

1 1/2 07/B9 10/01/87 - 03/31/89 2

1 1

2 2

2 2

.....l.....t....................l...j......t.....j....l...l...l..!

! OPS:ItGTOVItu ftA!E tlAME: TOltU EEACH i<mIOlit 3 IRilT FPT ASSMT. PERIOD OPS RAIO0t4 MAltE SUEN FP EP SEC WIG QP LIC TTO

1 ::::1::::==
==========::::1::::::i=====1====l:::!===1:::!====1::=l===l===!

t 1/2 03/88 04/01/86 - 09/30/87 2

2-1 1

1 2

1 1

2 2

1

.....l....................j...l......t.....l....l...!...l...l....l...;...

...l 1/2 11/86 10/01/84 - 03/31/60 1

2 1

1 2

2 1

1 2

2 1

.....t....t....................l...g......l.

...!....:...t......t....l...l...l...l 1/2 04/85 04/01/83 - 09/30/84 1

2 2

1 2

2 1

2 2

1 N

.....t....................:...t......!.....:....t...l...:...t......;...t...l 1/2 08/83 04/01/82 - 03/31/83 1

2 1

1 2

2 2

2 N

2 N

.....t

....................t...!

.....:.....;....l...l...[...!....t...[..

...l 1/2 09/82 11/01/80 - 03/31/82 2

1 2

2 3

2 2

2 N

2 N

.....:....................l..

l

.....t.....l

...;...t...l

..]....

j...t...l 1 IQU/TECll SUPP-1 NURM-12.i4 2-58

SALP HISTORY (REACTORS IN OPERATION) i 11W U HAME: PRAIRIE ISIWiD IEION:

3 t

I UNIT RI'r ASStR, PEHIOD OIS IMDXt1 M/S EP SEC ET SQ

. l::::: l=======.::::::::::::= ! === ! ===== ! ===== !==== l== = l = = = l ::: !

t 1/2 08/91 05/01/89 - 04/30/91 1

1 1

1 2

2 1

..l.....l.........

__.......:...;.....,j._..j....;...

...l...l 1/2 08/89 12/01/87 - 04/30/89 1

1 1

1 2

2 1

l.....l

..................l...l......l.....;....l_..l___l...l t SEC ing>tuving PIA!U IMME: PRAIBIE ISIRiD PMICti:

3 Uti1T RIT ASEMr. PEBIOD Ols BAD 00N MAlttr SURV FP EP SEC WIG QP LIC TIG l

.l:::::l:::::::::::========:l::=l::::::l::::=!:,::!===l:::!::=1 :::l::=l:.::!===l 1 1/2 04/88 06/01/88 - 11/30/87 2

1 1

1 2

1 1

1 2

1 2

...._l_....l..................:._.....

..;...._g..._!

..t...l...l l_..;...l...;

1/2 12/88 12/01/84 - 05/31/86 2

1 1

3 2

1 1

1 2

1 2

___..l...._;.......___...__.....;...t_.....;.....

....:......l...j__._l__ g......:

1/2 04/85 07/01/83 - 11/30/84 2

1 1

2 1

1 1

1 2

1 t1

.....:.....l._.................t..

.....l....l

...l...:...

...l 1/2 10/83 07/01/82 - 06/30/83 2

1 1

1 1

1 1

1 N

1 N

.. _ _ _ ;..... l _ _................ l.. ;..... ;..... j... g _ _. :... j....... l _ _ ;.. _ l.... l 1/2 12/82 07/01/81 - 06/30/82 1

1 1

1 1

2 1

1 2

1 N

l........_

.....l

...l...!._.l__

t....l......g...:

1/2 05/82 Q7/01/80 - 06/30/81 1

1 1

1 1

2 2

1 2

N N

....................l...

.....l

...i._g...

...t.......l___l...l 1/2 01/81 09/01/I9 - 08/31/80_

2 3

2 2

2 3

2 2

2 N

2

.... ;....l...

......t. _!__....l

....l...t

..l.__j....!...t...l_

.l 1 EtG/ TECH SUPP-1 i

NUIS-1214 2-59

SALP HISTORY (REACTORS IN OPERATION)

I4WU IMtO QUAD CITIES RICIrti:

3 UJM ;d'r AfEMr. PERIOD OPS FADCott M/S EP SEC ET SQ

=== ::=====l====================l::

l=====3

=l
=1===!===l===l 1/2 06/91 12/01/89 - 02/28/91 3

2 2

1 1

2 2

.....p___.p_..___..__.........j...p____.g._...p...p _ p.. ___l t 1/2 03/90 10/01/88 - 11/30/89 2

1 2

1 1

2 2

t.... _ p.. _ _.... _ _......... p. _ p..... p.... p _.. l. _ _ p _. p._ !

1/2 01/89 04/01/87 - 09/30/88 2

1 2

2 1

2 2

..... p.... p.... __ _ _ _ _ _ __ _.... p_ _ p __ _ _. p.... p__ _ p. p _ p_ _ l 1 OPS ItiPIOVItn 19WG IMME: QUAD CITIES IUU10 tit 3 UNIT I<I'r AeEMr. PERIOD OPS PAIXXt1 t%ItG SURV FP EP SEC WIU QP LIC TfG

i::::::::::::::======l=== :===== :::::j====t===!:::l:::l====l===l:::l:::l 1/2 09/87 10/01/85 - 03/31/87 2

1 2

1 11 2

1 2

2 1

2

... _ _ p... _ p...... _ _. _ _ _ _ _ _. p. p _ _ _ _ _ ___. p _ _ _ p. _ p _ _ p _. p.. p._ p _ p.. :

1/2 03/36 06/01/84 - 09/30/85 2

2 2

2 2

1 1

1 2

1 t1

..... p_ _ _. p. _ _ _.... _ _ _ _ _ _ _ _ _ _ p _ _ p..... p.._ _ p. _ _ p.. p.. p _ _ p... p._ p __ p._

1/2 02/85 01/01/83 - 05/31/84 3

2 2

1 2

1 1

1 2

1 N

p._. p.. _ _ _. _ _...... _.. p _ p..._ _ p.... p.. p _ p _. p. p._ _ p. p.. p _

1/2 07/83 01/01/82 - 12/31/82 2

2 2

1 1

2 1

1 N

1 N

..... p.... p _ _...... _ _ _ _ _..... ; _ _ _ p. _ _.. p.. _ _ p _ _. p. _ p.. g _ _. p... p.. p.. p__ !

1/2 11/82 07/01/80 - 12/31/81 1

2 2

2 2

2 2

1 N

1 N

____.g..__;_. _______.........

l._.t..____;_..._j

.._l.__l.._j...l....:.__l___;...;

1/2 11/80 0*i/01/79 - 06/30/80 2

3 2

2 3

3 2

2 2

N 2

._ _.. p _ _ _ _ p._ _ _ _ _..._ _......

p _ p _ _ _. p.... p _._ p_. p.. p _ _ p_ _ p __ p._ p _. j NUBB3-1214 2-60

_ - =

SALP HISTORY (REACTORS IN OPERATION)

PlW E NAME:

ZI0ti RMIOth 3 UNIT RPr ASSMr. PERIOD OPS RAD 00ti it/S EP SEC ET SQ

=====l=====l====================l===l======l=====l====l===!===l===l 1 1/2 03/91 10/01/89 - 10/31/90 3

2 3

2 2

3 2

.....l..

.........__l__.l______l. ___l_.. !...l___l__.!

  • 1/2 02/90 06/01/88 - 09/30/89 2

2 2

2 2

3 2

.....!_____l_____.......__

l...l._____l_..._l-.

.l. _j_. !...l 1 RAD 00tl & EP decliningi ET improving

  • SEC DECLINItG PLA!E NAME: ZION RmIOth 3 UNIT RPr ASSMT. PERIOD OPS BAD 00N MAltG SURV FP EP SEC OtJIU OP LIC TIG

=====l=====l====================l===l======l=====l====l==-l===l===l====l===l===l===!

1 1/2 10/88 12/01/88 - 05/31/88 2

2 2

2 2

1 1

1 2

1 2

.....l....l_____

.[....__!.....j--._j__.l._l

..l- __j...l.

.l 1/2 08/87 10/01/85 - 11/30/86 2

2 2

2 2

2 1

1 2

1 1

.....l_.___l___...........__.___l_ _l______l ____l____l___l

_l___l.__.g_..l__.l.._l 1/2 04/86 05/01/84 - 03/30/85 2

2 2

2 2

2 1

1 2

1 N

.l...;.... _;..__l l...l___l_..l____l___;...!.__j 1/2 02/85 01/01/83 - 04/30/84 2

2 1

2 2

2 3

1 2

1 N

--.__l___..!_...._____.______...!.._!....._;.....l___.l..

!_..l.._l..__l. _l_..l...

1/2 08/83 01/01/82 - 12/31/82 2

2 2

2 2

2 2

1 N

2 N

_____l_....l..___..

. __.....___!.__l_..

__l____

l.

_l.._l___!..

l....l_.j__.l___l 1/2 11/82 07/01/80 - 12/31/81 2

3 2

2 N

2 2

1 N

2 N

_____l_...

l...,...

l...___!.....l...l.._!_..l__

j.___!...l...l_..j 1/2 11/80 07/01/79 - 06/30/80 2

3 2

2 2

3 2

2 2

N 2

_ _... l.. _ _ l _ _ _ __ _ _ _... _ _..... !.. l._ _ _ _ ! _ _ _ _. l _... l _ _ _ l... j _ _ l. _ _ _ l. _ _ l... !.. l 1 E!C/ TECH SUPf0ffr-3 l

l NURM-1214 2-61 t

- - - - - - - - - - - - - - - - - ^ ^ ' -

' ' ^ ' ~ ^ ' - ^ ^ ^ ^ ^ ~ ~ ^ ^ ^ ^ ^ ~ ^ ^ ^ ' " ' ^ ^ ^ ' ' ^ ' ~ ^ ^ ~ ^ ^ ~ ~ ~ ~ ' ~ ^ ^ ~ ~ ~ ' ^ ^

SALP HISTORY (REACTORS IN OPERATION)

M R T HAME: AIWWISAS IGUI0th 4

UNIT IET ASSiff. PERIOD OPS RAD 00H tt/S EP SEC ET SQ

=!::===l ::::::=========::: l::=l======l=====l :==l===l===l===l 1 1/2 04/91 10/01/89 - 11/30/90 2

2 2

1 1

2 2

... j... l.._________________l_. l_...__l_..__l__..l___!.__l___l 1/2 02/90 07/01/88 - 09/30/89 2

2 3

1 2

2 3

_____l_____l__________.

.__j._q..

l...__l____l___l

._j.__l 1/2 03/89 01/01/87 - 06/30/88 1

1 2

1 2

2 2

._l__...l___________. _______!___l..____l_.. _l____l___l..l___l 1 OPS 12nprtwirs PLAtti DAME: A!WRISAS FIMION:

4 UNIT RFr ASSMT. PEBIOD OPS RAD 00N MAltri SURV FP EP SEC OIRG QP LIC TIG

===l:::::::::==:::::::::::==::l===l======j::::2:=.:=l===l::=l===l::::l===l===l===l 1/2 05/87 07/01/85 - 12/31/86 1

1 2

2 1

?.

3-1 2

1 1

...__!_____p..

.......p__p.____l_____l.... ___p__p

....p__l

__l...;

1/2 09/65 07/01/84 - 06/30/85 2

1 2

2 2

2 2

1 2

1 2

_ _ _ _ p _ _ _ _ p _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ p _ _ l _. _ _ _ p _ _ _ _ p _ _ _ p. p. _ l _ _ _ p _ _ _ p._ _ p. p. _ l 1/2 09/04 07/01/83 - 06/30/84 2

2 3

3 2

2 1

1 2

1 N

.._l_____p_______.________..p _p____..p.__ p.__ p p..p.p...l___p_.l...l 1/2 11/83 07/01/82 - 06/30/83 2

3 3

2 3

2 1

2 2

2 N

_ _ _ p_ _ _ _ p _ _. _ _ _ _ __ _ _ _ _ _ _ _. p _ _ l _ _ __ _ l _ __ _ p _. p _ l _ _ _ p

p.. p _ _ p_ _ p..

1/2 03/83 07/01/81 - 06/30/82 3

2 3

3 2

3 2

2 3

2 N

_ _ _ _ _ p __. p.. _ _. _ _ _ _ __ _ _ _ _ _ _ _ p __ p __ _ _ _ p _ _ _ p _ __ p. p. p.. p_ __ p._ p _ _ p _ l 1/2 09/82 07/01/80 - 06/30/81 2

2 2

3 2

1 2

2 1

N N

_ _ _ __ p _ _ _ p _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ p _ _ p _ _ _ _ _ p _ _ _ _ p.. p _ _ p _ _ p _ _ p _. p.. p _. p _ l 1/2 09/80 01/01/79 08/19/80 2

2 2

2 2

2 3

2 2

N N

__ _ _ _ p __ _ _ p _. _ _ _ __ __ _ _ _.._ _ __ p _ p_ _ _ __ j. __ _ p._ _ p _ _ p. p _ _ p ___ p _ p _. p __ l s

HUIED-1214 2-62

SALP HISTORY

( RIEAOTORS IN OFIERATION )

ILMff IWiE: OWA!GE PEAK MIIION:

4 UNIT RPT ASSMT. ITRIOD OPS RAD 00H M/S EP SEC ET SQ

=====l ::==l====================l===l======l=====l====l= =l===l===l 1 1/2 05/91 09/01/89 - 01/31/91 2

2 2

1 1

2 2

.-_..l..__

l.__......____

....l...l____..;___..l....g...l_.l...g i OPS & SQ impmvirs I

f NURHi-1214 2-63

SALA ' HISTORY

( RJEACTORS IN OPIERATION )

PLAfff NAME: 000ft3 STA'110t1 IGD 10ti:

4 UtlIT FIT ASE#r, PERIOD OPS BAD 00tl M/S EP SEC ET SQ

=t=====l==n::::::::::::::::=1:::l======l=====l====l===!===1 ::l 1

1.2/90 04/16/89 - 07/15/90 1

1 2

2 2

2 2

.....t

....;..............._..l.

.l.....l...._l....l...l...l _.]

03/89 02/01/88 - 04/10/09 1

1 2

2 2

2 3

___..l......l.....

.......l.._j......l....l....j__.g..

l

..l 1 H/S : Itaproving. EP = Iirs> roving, SBC = I nptwving PIAlfr HAME: CEOPER STATION BB11Cti:

4 UNIT FPT ASEMr.' PERIOD OPS RAD 00tl MAltfr SUlW FP EP SEC WIU QP LIC TfC

===:- j: :::! = :::= ::::::::::::= 12:= l::::::1 ::::::::=l:::!===l:::!====l::=1::=1 ::1 1

06/88 08/01/86 - 01/31/88 1

1 2

2 1

2 3

2 2

1 2

___.l_..

l_.................._j...:......j.....!....l___:..

l

..;...-l...j.._l...!

10/86 02/01/85 - 07/31/88 1

2 2

2 2

2 3

1 2

1 2

!...................;........_l....;_...l...l...l..

l 04/85 07/01/83 01/31/86 2

2 2

2 1

2 2

1 2

i H

.._.......l__.l..____l..

l.....]...l.._;...l....!-._j...j_..l 12/83 07/01/82 - 06/30/83 2

2 1

1 1

2 2

1 2

1 H

..__.l....__;......... __.......;___

......l....:. __

._l_..l_..t..._l--.:...l...l 11/82 07/01/81 - 06/30/82 1

1 1

1 1

3 1

1 2

1 H

j.__l.....l....

. _.t...[...!..l._..l...l.__l_ _l 06/82 07/01/80 - 06/30/81 1

2 2

1 2

3 2

1 1

H H

I

...__j_.__

...l_.....l_.. _;....t.._j..

!...l....l_

___g

..t 08/80 01/01/19 - 08/06/80 2

2 2

1 2

2 2

1 2

H H

.....;-__..t...-...__...........l...l_.....;......;

..j_..l...

l...;.__l 1 MAltfr. SECUBITY IMPf0VltG

?

NURID-1214 2-64

SALP HISTORY (REACTORS IN OPERATION)

FIMirIMMih FCFT CAIJICCN IGGICti 4

UNIT IET ASSiff. PERIOD OPS RAD 00H H/S KP SEC ET E4

=====l=====lu::::::::::::::::===l===l :::==l::: =l====l::=l ::) ::l 11 11/91 05/01/90 - 07/31/91 2

1 2

2 1

1 1

.....l....

l..

....l..

l......l.....l....l..

l...l..

l 81 09/90 00/01/89 - 04/30/90 2

1 2

2 2

2 1

.....l.

..l...........

......l...l......l.....l..

.l...l

..l

..l 1

08/89 05/01/08 - 04/30/89 2

2 2

2 2

2 2

.....l.....l...................l...l

..l..

.l...l...l...j...)

t COS & M/S linpmvirs

  • OPS : 1rupmving, SEC.=. I.rupmvirs 14W G NAME: FOIC CAIJIOUN PIU10N:

4 (UIT IU'T ASSMT PERIOD OPS RATCON MAltfr SURV FP EP SEC OlnG QP LIC TTG l

l====================j::=l======l::===l :::l:::l::=l===l::::l===l :=l:::l i

11/88 10/01/80 - 04/30/88 2

3 2

2 2-2 2

2 3

2 3

... l....l.....

.......l...l......l.....l....l..l_..l.__l

..l

..l.

.l

..l 1

12/86 03/01/85 - 09/30/86 1

2 1

1 1

2 3

2 2

1 2

..l.....l.........

l..

l.....l_.

l...l...l...l....l.

.l

.l...!

1 05/85 09/01/83 02/28/85 1

1 1

1 1

2 3

1 2

1 N

.... l.......................l...l..._.l.....

..l..l......l...... l l...!

1 02/84 09/01/82 - 08/31/83 1

2 2

1 2

2 2

1 3

2 N

..l....!s...... ___........l..

l.....l....l....l

..l...l..l....l..l...l 1*

12/82 07/01/81 - 08/31/82 1

2 2

1 2

2 2

2 3

i N

.....l

....l....

...l__

l......l..

..l

.. l

.l..

l...l

..l.

l._j._.j 1

09/82 07/01/80 - 06/30/81 2

2 2

2 2

2 2

N 2

N N

....l....

l.................l..

l....

l........l...l...l.. l.

l...l...l...l 1

08/80 01/01/79 - 06/30/80 2

2 2

2 2

2 2

2 2

N N

.l....

l..............l..l......l....l.

..l..l..l...l....l.._l.

.l..!

NUBD3-1214 2-65

SALP HISTOBY

( BIEACTORS IN OPERATION)

IMin IW1Et IUC ST VMIH idDIQh 4

UNIT IPT ASSiff. PERIOD OPS BADotti H/B EP SEC in SQ

== === l::::: 1

==== r.:::::::s : = l::= l== ==== l::::: !:::= l e= = l=== l = = = !

1 04/89 05/01/87 08/31/88 2

2 3

2 1

2 2

.....l.....l...................[...l......l.....l....l...t...l...I 1 OPS-IMP!WItu. MD0tti-DECLItiltG, EP-IMPIMItG. SEC-IMP 10VitG. ET-DECL IMfC HAME: 1916 ST VBAIN FIDIOtb 4

Uti1T IU'r ASSMr. PEli10D OPS RAltJJH MAllE SUIN FP EP SEC CUIG QP LIC TIU

1::::=]====:::::==: ::=====l===[::::::l:::==l====je::l===!===l:::=l::=!=::::=-!

l 08/87 05/07/86 04/30/87 2

1 2

2 1-3 2

2 2-2 2

.....g.....l....................l...l......t.....g....l...l...l...]....j...l.

.t...l 07/80 03/01/85 - 05/08/80 2

1 3

2 1

3 3

3 3

3 2

...l....................

]...;......l.....t....l..

l...g..

t....l...l...j...;

05/85 10/01/83 - 02/28/85 3

1 3

2 2

2 2

1 3

3 2

l.....t.....................;...;......;.....l....!

..g.. l..;....l...j...l...l 06/84 09/01/82 - 09/30/03 3

2 2

2 H

1 2

2 2

3 2

.....l.....l...................j...j

.....l.....;....l...]...;...!....t...l...l...!

01/83 09/01/81 08/31/82 3

2 1

2 1

2 2

H 2

i H

.l.....t....................g...l......l.....l...g..g..

t...l....;...l...l...l 06/62 07/01/80 06/30/81 3

2 2

2 2

2 2

2 2

H H

..l.

...g................

..l...j.....].....;....l...g...l j......l...g...l...l 10/80 10/01/79 - 10/01/80 2

2 2

2 2

2 3

2 2

H H

.....g.....l...................l...l......l.....;....l...g...l..l...

g...g...l..

l 1 KGITIVE TBEt0 IUTED IN OPEBATICtis AND EMEIGENCY PFEPARADtESS NUPEG-1214 2-66

SALP HISTORY

( RIEACTORS IN OPIELWrION )

M M(f !WiEr RIVER BDO RWIOti:

4 Uti1T RPr ASSMT. PERIOD OPS RAD 00ti M/S EP SEC ET SQ

===l::::=l====================l
l::::::!=====;:==:1:==!===l===l 11 08/91 01/01/90 - 03/31/91 1

2 2

1 2

2 2

.....l.....l....................l...l......!.....l....j...l...l...l 1

05/90 10/01/88 - 12/31/89 1

1 2

1 2

2 2

l.....l....................l...l......].....l....l...l...l...l 1

03/09 04/01/87 - 09/30/B0 2

2 2

1 3

1 1

.....l.....l....................l...l......l

....l....l...l...l...]

1 Orc & EP Inclinirs MMir !WiE:

81VER DEt(D BfDIOti:

4 UllIT RIT ASStfr. PERIOD OPS RAD 0014 tiAltfr SURV FP EP SEC OtRU QP LIC TfG

::::=l:::::::=============l::=l::::==j=====!====l===l:::l:::!:===!:::1:::l::=l 1

06/87 02/01/80 - 03/31/87 1

2 2

2 2

2 2

ti 1

2 1

.....l.....l...................l.........l.....l....l......l...l....l...l...l...l 1

04/86 01/01/85 - 01/31/86 2

2 2

2 1

2 2

11 2

2 2

.....l.....

...j......l.....l...

l...l...!...l....l...l...l...;

1 1 02/85 08/01/83 - 12/31/84 2

2 11 ti ti 2

2 ti 2

2 11

.....l.....l....................l...l......l.....l....l...l...l...l....l...l...l...;

(

100liSTIRUTIOtt RATI!GS WERE ALSO ASSIGliED.

!UREG-1214 2-67

l SALP HISTORY (BEACTODS IN OPEDATION')

ILA!TT IM: DCUTH TEXAS I @ ICti: 4 UNIT IPT AFEET. PERIOD OPS RAD 00H H/S EP SEC h7 SQ

===l::=== :::==:::::::::::::::::::l:::::=i:::::1:::=!===j===!==:l 1 1/2 J9/91 02/01/00 - 05/31/91 2

1 2

2 1

2 1

.....l.....l....................g...l......l.....l....[...:...l...l t 1/2 06/90 01/01/89 - 01/31/90 1

2 1

2 1

2 1

..___t....l....................l...l......l.....l....:...t...l...l 1/2 05/89 01/01/88 - 12/31/08 2

2 2

2 2

2 1

...__l.....l....................l...j......l.....l....g...l...l...g i ET Impivsvirs. SA/r# I)x:linirs

  • RAD 00ti:Irprovira PLAlff HAME: SCUril TEXAS

!@ICti:

4 UNIT RPT AFEET, "EBIOD OPS FAICON MAltTT SUEN FP EP SEC OtJN GP LIC TIG

========l===t::::::l==== :::=l :::::=l:::l:::=!=== :::::::l 1 1 08/88 01/01/87 - 12/31/87 2

2 2

2 2

2 3

H 2

2 2

.....].....:.............._...:.........

._...:....l..__l___;.... _;___;_..;

..g i PREOP TESTItG-2. STARTUP TESTItG-2 tus-1214 2-68

b I

GALI" HISTORY

( R E A O T O LR S IN Ol"ERATION) f PIAffr IMME: WATERFORD I

100!C44:

4 UllIT idi ASSMT, PEBIOD OPS RAD 00H M/S EP SEC ET SQ f

=====1 ::: l:::======::===::====te::l:::r ::::::=l::::::::l==n!= :l t3 08/91 11/01/89 - 04/30/91 1

1 2

1 1

2 2

...._l_........................;..

l....._l.....

...l...l...:

a3 03/90 08/01/88 - 10/31/YJ 1

1 2

1 1

2 2

t...

.......l........_l...l...l_..

3 02/89 02/03/87 - 07/31/88 2

2 2

1 1

2 2

.....l...._l....................l...l_....l..._l....l...l...l...l 1 M/S Inproving 2 M/S IMPf(BIl0 PIAlff f4AME: WATEFFOPD t

T@llCtt:

4 UNIT RPT ASSMT PERIOD OPS FAD 00t1 MAltri SURV FP EP SEC 0010 ff LIC TTG

.:12::::::::.::::::::::l=== :::::::::::::::::l======l::::::::===l
lc:::

3 04/87 01/01/86 - 0.'./31/87 2

2 2

1 1

2 2

1 2

1 1

...._l_..._l__.

_l...l....__l_

.._l.. _l...l...l...j...l_.....l.._l 3

03/86 12/18/84 - 12/31/85 3

2 3

2 2

2 1

N 2

2 2

___l.....

...l......

_l....l___l...l.......;...l..

l..

3 07/82 07/01/80 - 06/30/81 3

H H

2 N

N 2

N 3

3 H

..._.l...

.l...................l.._l..... l...._

l....:...:...l...l....l.._l...l...l HURIM-1214 2-69 1

. ~ - -. - -

. ~.. - - -

\\

SALP HISTORY (BEACTORS IN OPEBATION)

ISA!TT !%ME: WOLF CIEEK FEiICti:

4 Uti1T RI'r ASSiff. IERIOD 015 !%D00N M/S EP SEC ET fX2

=l :::=l :::::::::::::::-===l:::l::::::l:::::l====l :=lr==t:= !

11 10/90 04/01/89 - 06/30/90 2

2 2

1 1

2 2

..__. p

.l-...................[...l......l

....l...j...l...l___l t1 07/89 04/01/88 - 03/31/89 2

2 2

1 1

2 2

l...

.......l.,p.......

.l....l...l

..l...!

1 RAD 00tl : Itaprrnirm a OIS IMPDOVItu 1%DC0t1 DECLINIt0 PIA!TT NAME: WOLF CREEK FEDION:

4 UtilT FPT ASStfr. PEBIOD OIG IMD00tl MAI!TT SURV IT EP SEC WIU QP LIC TIC

=g=:::::::::::::::::::l===l::::==l:::::::::::::: :::::::::: ::::::===l::=l 1

09/88 03/01/87 - 03/31/88 2

2 2

2 1

2 1

3 3

2 2

...__l......

.l.... -l....!____l__.:___l

....l___g.

.l...]

1 05/87 02/01/86 - 02/28/67 2

2 1

2 2

2 2

2 2

1 1

.....l... _:..--.....

..........l...;.,.....l.....l...

...l......!....l...!--.!...l 1

04/86 10/02/84 - 01/31/86 2

2 1

1 2

2 2

N 1

1 2

....j._..:........__........l_..l

... [

....g..._l___l...[..

l..._l.......l_..l 1 1 02/85 08/01/83 - 09/30/84 H

2 2

H 1

3 2

N 2

1 N

.l-....:.........

.......l........_l.

....l... --_l.

.l_..-l...l...!...l 1 CONSTR WTION PATIl0S WERE ALCO ASSIGNED, i

t 10BB3-1214 2-70 l

-_.=. - _ _ -. - -. _ _ -

i SALP HISTORY (REACTORS

.E N O L:'E B A T I O N )

11Ata IWiE: DIAILO ChiY0ti 10DI0ti:

5 l

UNIT RPT ASStfr. PERIOD OPS RAD 00N ti/S EP SEC ET SQ

= = = = = t := = = l = =:.:::::::: = = = = === = = l ::: : := === = ! ::::= l = = = = l := = l== = l = = = l t 1/2 09/91 01/01/90 - 08/30/91 1

1 2

2 2

1 1

.... l. ___l_....

...l..

l......

....j...l

..l_..l t 1/2 05/90 08/01/88 - 12/31/89 1

1 2

1 2

2 2

.... l

....l.......... __.....__l__

l.__...l..

..t

...l..l___l...l s 1/2' 01/89 08/01/87 - 07/31/88 2

1 2

1 2

2 2

.....l

_l______......

.l...l______g.........l...l...

...l 1 SEC I npmving 3 ti/S, SEC. ET. & SQ Itapmvire

OFS-ItiPBOVItu t FIFE PKITECT10tt-1 & ItiPIOVItu ITAlff 11AliE: DIABLD CMTKU BD3141: 5 UNIT FIT ASSMT PERIOD OPS RAD 00t1tiAltG SURV FP EP SEC OUID QP 12IC TTO
==:l:::::l::::::======= :::::=l===l=:::::::::::! ::::::=l:: ::=l::::::== ::=l==:1 1 1/2 10/87 08/01/86 - 07/31/87 2

1 2

2 2

1 2

1 2

2 1

....l.......___...

__....l. _l____..:.....l....l___l. _l__.l...l...!.__!...

1/2 10/86 08/01/85 - 07/31/88 2

2 1

2 1

1 1

2 2

1 1

.....l__...

...l..l......:

....l___

l..

.l_..l....l...l...l._!

1/2 10/85 07/01/84 - 07/31/85 2

2 1

2 1

1 1

N 1

1 11

.....l........

..........l..!......l_...!.

..l_..:...:

..l....:..l...:...)

1/2 11/84 Q1/01/83 - 06/30/84 2

2 2

2 2

2 1

11 2

2 N

..a.:...._l.._.

..........l_

l....l...

-_.l...l

..!._..l...

._l...:

1 1/2 03/83 07/01/81 - 12/31/82 2

2 2

2 2

1 1

N 2

2 11

.....l...

......l...l..... l__.._l....l__

l...l...l....l.._l.

...l 1 RAIXXJti AND SURV SHOW ItiPf0VItu TBEND 2 00tlSTRV7FI0t1 RATItOS WERE ALEO ASSIGNED.

tUBB3-1214 2-71

SALP HISTOIW (BIEACTORS IN OP1ERATION )

ITA!TTi M : PALD VERDE

[331C41: 5 U!i!T IU'T ASEMr. PERIOD OPS RAD 0Cti M/S EP SEC ET C4

l=====l:::::::::::::::::::::::::::::: l=====l
=l:::l===l ::l t 1/2/303/91 11/01/89 - 11/30/90 2

2 2

1 2

2 2

.....l.....l....................l...l......t.....l....l...l...l...l t 1/2/301/00 11/01/88 - 10/31/89 2

2 3

2 2

3 3

.....l......l....................l...l.....

l.....l....l...l...l...l 1/2/303/89 11/01/87 - 10/31/88 3

3 2

2 2

2 3

.....;.....l....................l...l......l.....l....l..l...l...!

t OPS & Sm Imrsrovirs

  • EP Ilfff#IlG, C4 ItET(MItU FIAlff IM: Path VERDE FIDIOll:

5 UtilT IQ'T AFEMI. PFBIOD DIS BADotti MAltri SUIN FP EP SEC WIU OP LIC TfG

=== ::::::::============:::::c::! :=l:::::=l= ::::::::l::=l:::l===l:::::::=l:=:l:: l 1 1/2/302/88 10/01/86 - 10/31/87 2

2 2

2 1

1 2

1 2

2 2

...l.....l....

......:.....l.

.l

..l...l...l

.l...l...

...l 1/2 01/87 10/01/85 - 09/30/86 2

2 2

2 1

2 3

1 2

2 1

.....l.....l....................l...l......l.....l....l......l...l....l...l...l...l 1/2 12/85 04/01/84 - 09/30/85 2

2 2

2 1

2 2

1 2

2 11

.....l.....l....................l...l......l.....l....l...l...l...t----l---l---l-~~\\

t PREOP TEST:1.EtG/DESIGli 00tiTUOL:2: OPS.SURV.SEC,LIC:ItfBOVIt0 t0fGD-1214 2-72

SALP HISTORY (REAOTORS IN OPERATION)

ILA!TT fMhE: F# 010 SE00 IEI0ti: 5 l

i UNIT IPT ASSiff. I'ERIOD OIS !%CODtt. M/S EP SEC Er SQ

=====l :::=l::::================!:::l======l=====l====l :=l::=l::=l 11 07/89 07/01/80 - 12/31/88 2

2 2

2 2

2 2

.....l.....l..........__.......l...l......l__...l_..l...l___l__.l j

1 STAlfrUP TESTItu !%TED CAT 1 ItAtTT!%ME: IMtCIO SE00 IEIOth 5

UNIT IGT ASStfr. FEBIOD 0151%ICCt1 MAltTT SUIN FP EP SEC UJIU QP 1,1C TfG

l=====l========== ::::::::=l :

l:::===j=====l====l:::l===l:::!====!===l :=l ::l 1

11/86 06/01/85 - 06/30/86 3

3 3

2 1

3 3

2 3

3 2

.....l.....j_..............__..l...l....._l.....l....l...l...l_..l

...l...l...l...!

1 11/85 12/01/83 - 0$/21/85 2

3 2

2 2

2 1

1 2

2 2

.... l.. _l........_........_.g...l......l.....l....l...l

...l...l....l..-l.._l...l 1

06/84 10/01/82 - 11/30/83 3

2 2

3 2

2 1

1 H

3 N

.....l._..;..................l...l....._l.....!...l...l...l...l....l....l...l...l 1

03/83 07/01/81 - 09/30/82 2

2 2

2 2

2 1

1 11 1

H

.....;....:..............._...l...j___...j_...l. _.l

._l...l

._l...l...l.._1.._l 1

04/82 06/06/80 - 06/30/81 2

2 2

2 1

2 2

1 2

11 N

l....................l.

.l......l...

.l

...l...l...l.

l...j...l...l...l 1

08/80 04/15/79 - 04/15/80 2

2 2

1 2

2 2

2 3

H H

...__j.....l....

......l...l......l.....l...j...l...l..

l....j...l..l...)

L i

NUIE-1214 2-73

SALP HISTORY (REACTOLRS IN OPERATION)

M A!U HAME:

FAllCtOFFE REGICth 5

Ut(IT IE'r ASQfr. PERIOD OFS RAD 00H 11/ 8 EP SEC h7 f4

!====:!====================l===( ::::=l=====l====le::l===l::st i 1/2/311/91 02/01/90 - 07/31/91 2

1 2

1 1

2 2

.....g...._t....................l.._l

.....l....l....l...t...l..

l 1/2/305/90 10/01/88 - 01/31/90 2

1 1

1 1

2 2

.....l.....l...................t..l...........l....l...l...l

..l 1/2/301/09 10/01/87 - 09/30/88 1

1 2

1 1

3 3

.....]

....j..................g...j.....l.....g....l...l...l...l 1 OIS. E/T, & SA/QV Ierovirs FlANT HAME: SAN Ot10FPE RIDIOlb 5 UNIT RPr ASStff PERIOD OPS RAIXXAi Malt 1T SURV FP EP SEC CUIU QP LIC TfG e:::: :::::l=

=!======!=====l :: l:::===l===j:::=! :=!===l===l 1 1/2/301/88 06/01/86 - 09/30/87 1

2 2

2 2

1 2

1 2

2 1

.....:....j........ __.......l...:...........g...

t..

j...l...;

...:...l..

l...

1/2/308/86 10/01/84 - 05/31/86 2

1 2

2 1

2 2

1 2

2 2

7

......l... _t.................

l...:......g....!_..l...l...:..;....g......t..

I 1/2/311/84 06/01/83 - 09/30/84 3

3 2

2 2

1 2

2 H

2 H

.....:....:.................;.........g.....t....:....._!...t..

.g...j

..l...j Q 1/2 12/82 07/01/81 - 08/30/82 2

2 2

2 2

1 2

1 2

2 N

j.....t...............

l...!......l.....l....l...l._.l_...l.....l

..;...t...t 4 1 09/81 06/01/80 - 08/30/81 2

3 3

1 2

1 3

1 2

14 H

_l.....j....

............l...l....

.....l....j.._l

.l..t....l...l....

...l 1 EtG/ TECH SUPIT)!U:2

  • OFS. RAD 00H. MAltU. FP & CUIG WERE ASSIGNED 1.2.1.1.H RESP. (UNIT 1)

OFS. RAD 00H. MAltU. SEC AND Offl0 WERE ASSIGNED 3.3.3.3,H RESP.(UNIT 1)

  • EP ASSIGHED CATFDORY 2 FOR UNIT 1.

~

HURID-1214 2-74

SAlaP ISISTORY (REACTORS IN OPERATION)

F1Mir !MME: TIKVAN

!@l0tt (A{IT RPT ASSiff. PERIOD OPS RAD 00N M/S EP SEC ET 24

==!:====l====================l===l======!=====l====l===l===l===l 1

08/91 04/01/90 - 03/31/91 1

2 3

2 2

2 2

.....l.....l..............__....l...l..... _l__..

l....l_..l___l...l 8

08/90 01/01/89 - 03/31/90 1

2 3

2 2

2 2

_____l...._l.......

....,___l...l______l.....l

.l___

06/09 12/01/87 - 12/31/88 2

2 2

1 3

2 3

.l.....l......

l...l....l.

__l_...l.__j...j

.l 1 M/S Ir.rroving. E/T Declining 8 M/S Inoroving P!WG IMME: TICOAN IEIOtti 5 IRIIT RFT ASSiff. PERIOD OIS RAD 00N MAltfr SUIN FP EP SEC OtJIU QP LIC TIG

=====l=====l::==================j:::!:====-l :::=l====l===l===j:==l=::=l===;===j:::j 1

05/88 11/01/86 - 11/30/87 2

2 2

2 3

2 2

2 2.

2 2

.....l_... l....______________

.._l......!__. l_

..l...l...l...l....l...l...l...l 12/86 11/01/85 - 10/31/06 2

2 2

2 2

2 2

1 2

2 2

.t.....l.

l...].._.__l.....l__..!__.!.._l_..,....l...l___l___l 01/86 11/01/84 - 10/31/85 2

1 2

2 2

1 2

1 2

2 N

.....l

..l............

...l..__

l....l....j___l___j-.l... l...!_..l___l 01/85 09/01/83 - 10/31/84 3

1 2

1 2

1 1

1 3

2 N

__.l.....l...............

...l..__._l

.. l

..l..

l..l...l..__l...l_..l 04/84 09/01/82 - 08/31/83 2

2 2

1 2

1 1

1 3

1 N

.....l...__ ___........ l. _l _..._l_.__l..

_j...l...

l.___l...l...

...l 12/82 07/01/81 - 08/31/82 2

1 1

2 2

1 1

1 2

1 N

....l.

l..!......l. ~l

...l.__j...l_..j.. l

.l..l...;

04/82 06/01/80 - 06/30/81 1

2

'2 2

1 1

2 1

2 N

N

..l....

j__.g..

l___..l ___l...l...l.__l...l__.l___l___l 10/80 09/01/79 - 08/31/80 2

2 2

2 2

2 2

2 2

N N

___l.._..l__............

.l...l.....

l.... l_._l...!___l...l_..

l...l___;...l 1 EtOINEERItO=2, IMPROVIlGi OPS. SUIN DEC TREND; RAD, LIC IMPB TRDO NUREG-1214-2-75

SALP HISTORY (BEACTORS IN OPIIRATION)

PLA!U tMME: WASill!GTCt1 Nim IEI0th 5 UtilT RIT APERT. PERIOD OPS RAD 00t1 M/S EP SEC ET SQ

===== :::::1:::::::::..ce u:::::l:::l::::==!=====!====:=== :::!===l 12 12/90 06/01/89 - 08/31/90 1

2 2

2 2

2 1

...._l.____l..

____............j._......_.._l.__

!.....l_..l 2

10/89 08/01/88 - 05/31/89 2

2 2

1 2

2 2

...._;.. _;..............,_...l...

l_..._:..__;. _l.__i._.

2 10/88 06/01/87 - 05/11/88 3

2 2

2 1

3 2

_____.._____._____j...g....__l....

l

...j...l...l...l 1 SEO = lagerr>ving, h7 : Ingerf>viruz PLA!U H\\ME: WASH 1tm Ot1 NUCLEAR RMIOth 5

UNIT Hli ASStfr. PERIOD OTS RADCON MallU SUIN FP EP SEC 01110 QP LIC TfG

=== !===== :::::::::=========== l::.: :::==== j :.__ ::=== l=== j ::: :::= ::::: ::: l ::: :::= l 2

07/87 02/01/86 - 06/?1/87 1

2 2

2 2

1 2

2 1

2 1

....;...;...._.g.........:...l_..:...t....g...:...:

2 07/06 02/01/85 - OU31 AG 2

2 2

2 3

2 2

1 2

2 2

.....:.__--:........._,.m. -..:....;._-...:.....:....;...;...g. _l _..:_.....:.__

2 0S/85 08/01/83 - C R 31/8b 2

2 2

1 2

2 2

H 2

2 H

_l...:...i___

. __l_..

2 12/83 08/01/82 - 07/31/83 2

2 N

N N

2 2

H H

2 H

M NUBEG-1214 2-76

Section 3 SALP History:

Facilities Under Construction NUREG-1214

SALP 1-II S T O R Y (BEACTORS UNDER CONSTRUCTION)

PLAtU HAME: BEAVER VALLEY 2 IEIOti:

1 RI'r ASSiff. PERIOD SF OctR PIPE SRC AUX ELEC INST DSN QA LIC

=========================l===l====l====l===l====l====l====l===le==!===l 112/87 04/01/86 - 02/23/87 N

N N

H H

H H

H 2

1

____l___.....___...... __l

--l....l...l...l____l.__l __.l_._l __! __j 09/86 04/01/85 - 03/31/86 H

1 2

1 2

2 1

N 2

.1

.....l._______.. ____...... l. _l..__l....l__.g.__ p __l

...j... p..l.._l 08/85 04/01/84 - 03/31/e5 H

1

?

1 1

2 2

2 2

2 p................. p. _ p... p _ _ _ p.

p... p.. l... p. p._ p... l 08/84 12/01/82 - 03/31/84 H

1 3

1 1

3 2

3 H

2

..... p _ _ __ _ _ _ _... _...... p.. p _ _ _ p. _ _ p _ _ p __ _ p... p._ _ p __ p.. p. l 04/82 09/01/80 - 08/31/81' 1 2*

2-N-

N.

2-H N-H H

..... p................c.. p.. p... p _ _ _ p _ _ p.. p... p.. p. p.. p.. !

04/81 03/01/80 - 02/28/81 2

2 2

2 2

2 2

N 2

H

... _ _ l _.. _ _ _ _ _ _........ _ _. :... l _ _ _ l _ _. _ l... l... l _ _ _ _ l.... : _ _ l... l.... l 1 OP READI-2 IMPROV: FP & HCUSETJ10-2: PREOP TEST-1:00tGT-1 PLA!C HAME: HOPE CREEK 1

!@I0ti:

1 BPr ASSMT. PERIOD SF 00tG PIPE SBC AUX ELEC INST DSH QA LIC

=====l::=== :=============j===l====l:::=l===l====l====l====l===l===l::=l 104/86 11/01/84 - 10/31/85 H

2 2

H H

2 i

H 1

2

..... p.... _ _ _ _ _ _. _ _ _.. _ _.. p. p _ _ p... p.. p _ _ p.. p... p. _.. _ p _ _ l 04/85 08/01/83 - 10/31/84 H

1 2

1 1

2 2

H 1

2

..... p.._ __ _.._ _ _ _ _ _ _ _ _ _ _ p.. p.. p... p.. p... p... p... p.. p.. p.. !

12/83 08/01/82 - 07/31/83 1

2 2

1 2

H 2

H H

2

_... : ~................. p _ p _ _ p... p. p __. p.. p... p. p. p _ _ l t/82 M/01/81 - 08/31/82 1

2 1

2 2

H H

H H

H

.. _ _ _ p........ _......... p.. p.. p. _ _ p. _ [.... p... p. _ p. p _ _ p. _ l 3/82 07/01/80 - 08/30/81 H

2 1

1 1

1 H

1 2

H

..... p................... p.. p __. p _ __ p _. p__ _ p.. p... p._ p._ p__ l 01/81 11/01/79 - 10/31/80 2

2 3

2 N

2 H

N N

2

... _. p................. p _ _ l _. _ _ p _ __ p.. p... p... l _ _ _ _ p _. l.. p.. j 1 SALP 00NDVG'TED UNDER THE OLD SYSTIM NURID-1214 3-1 i

SALP HISTORY (DEACTORS UNDER CONSTRUCTION)

ITA!(T tlAME: LIMERICK 2 Tenloti:

1 IFT ASEHT PERIOD SF 00tfr PIPE SIC AUX ELEC INST DSli QA LIC

= ===================te::l::==l::::!:::l====l====!====!===le==l===l 104/89 00/01/87 - 12/31/88 lt H

H H

H H

H 1

1 V

_____l.._.................l...l....l____l...l_...l..._l..._l...l...l_.

201/88 01/01/80 - 07/31/87 i

H 1

1 1

1 1

2 2

1

__..:... ____............l

....p._. l_

l_...l____l....!...l...l...

100t4STFWTION:1, PPEOP TESTIlG:1

  • EtU. RATED 2;PFSDP TEST. IEfr RATED PLAlfr 14AME: LIMERICh 1/2 P M I oti:

1 IFT A.EMr. PE!110D SF 00tfr PIPE SIC AUX ELEC INST DSH QA LIC c

=====l:::::::::=== :::::::l:::::::=l::::!== l:::=j::: l:::=l=::! ::!::::

04/85 12/01/83 - 11/30/84 1

1 1

1 1

1 1

1 1

1

_......l___!....;__

l..

l....l_...!....!___!...l...!

l HUFm-1214 3-2

SALP HISTODY

( REACTOIVS UNDER CON STRUCTION ')

ftA!U HAME:

LIMERICK 1 IG310th 1

IPT ASSiff, PERIOD SF 00tR PIPE SIC AUX ELEC INST IGli QA LIC

= ::::::::::::::::::==!:::! :::l::: ::::l=::::.::!====l::=!:::1:::t 04/85 12/01/83 - 11/30/84 2

2 H

H 1

2 3

11 N

1

.....j-................;_..:....j....l-..l.

..l

...l....l...l..l..-!

ELA!C HAME: LIMERICK 1/2 EmKth 1

Id'T ASFMP. PERIOD SF 00tU PIPE SIC AUX ELEC I!4ST E614 QA LIC

!::::=======::::::::=t:== :::::::::l===t::==i====1 :::::::!:::!==::

05/84 12/01/82 - 11/30/83 1

1 1

1 1

1 2

2 N

1

.....l---................l....--.:....l...l....l...........:...t...:

04/83 01/01/82 - 12/31/82 1

1 1

H 2

2 2

2 N

2

.....l....--

.............l...l....;... g..

............g...g 08/81 07/01/80 - 06/30/81 N

2 1

2 2

2 2

2 2

H

....................... l... :.... l.... l... l........ :.... :...... :... ;

02/01 10/01/79 - 09/30/80 2

2 2

2 2

2 2

11 3

H

.... l -................. :....... l -... :. - l -... l... l.... l... l... l.

HURM-1214 3-3

SALP H ISTOIRY

( IREACTOI3S UNDEli CONST13UCTION)

ILAlff IWEt HILLS M E 3 IEICti:

1 IFT ASStfr. PERIOD SF 00tfr PIPE SIC AUX ELEC INST D3H QA LIC

==!::::::::::::::::::==l===l====l:::=l===l====l::: l :::l===l : l===l 04/85 09/01/83 - 08/31/84 H

1 2

1 1

1 1

1 N

2,

.....l....................l...l....l....l...l....j

...l....l...l...l...l 03/84 09/01/82 - 08/31/83 H

1 1

2 1

1 H

H 1

2

.....l....................j...l....l....l...l....l...

l...l...l...l...l 10/82 09/01/81 - 08/31/82 1

1 1

2 1

1 1

H 2

1

.....l....................l...l...

l...l...l....l....l...l..

l...l...l 10/81 07/01/80 - 08/30/81 1

1 1

1 1

N 1

3 2

H l...................g...l....l.

..l j....l....l....l

..!...l

..l 04/81 03/01/80 - 02/28/81 2

2 2

2 2

H H

H 3

H

.....l...

......l...l....j...-l...l....l....l

..l...l...l...l PLAffT HAME: HI!E MILE IT> INT 2 IEIOth 1

PPT ASSitt. PERIOD SF 00tif PIPE SIC AUX ELEC INST DSN QA LIC

============-l:: l::::l====l::=!====l ::=l= :=l::=l :=l===l 07/86 02/01/85 - 01/31/86 H

1 H

H, H H

H H

2 2

.....l....................l...l.....l....l...l.

..l

...l....l...l

..g...l 06/85 10/01/83 - 01/31/85 N

2 2

1 1

3 2

3 2

2

.....l...................l...l....l....l...l...

l....l....l

..l

..]

..]

02/84 10/01/82 - 09/30/83 1

2 3

2 H

2 2

H 3

2

.....l...................l..l....l....l..l...l...

l....l...l..l...!

04/81 02/01/90 - 01/31/81 2

2 2

2

.2 2

2 H

2 11

....j...................l...l....l...l...l....l....l...l...l...j...

HUIE-1214 3-4

r SALP HISTORY (REACTORS UL9 DER C O14 S T R U C T I O14 )

f IWT IVME: SEABROOK 1 I E ICti:

1 FI'f AS&ff. PERIOD SF 00tU PIPE SIC AUX ELEC INST DSN QA LIC

l===========u========l :=l====l====l===l====l::==j====l===l::=l:::l 112/89 08/01/87 - 06/30/89 2

N 2

1 1

2 2

N N

N

.....l....................l...l....l....l l....l....l...l...!..

l...l 402/88 04/01/(m - 07/31/87 2

1 N

N

.H 1

1 N

2 1

.....l....................l..,.l....l....l

..l....l....l....!...l...l...:

808/B0 01/01/85 - 03/31/86 H

H H

H H

N N

N 1

1

.....l....................l...l....g....l...l....l....j....g...l...l...l 05/85 07/01/83 - 12/31/84 N

1 2

2 1

3 2

N 1

2-

............l...l....l....l...l....l..._l

...l...l...j...

12/83 07/01/82 - 06/30/83 1

1 3

2 1

2 1

N 2

2 l...................l...l....l....l

..l....l....l.....l_...l...l...!

12/82 08/01/81 - 07/31/82 1

2 3

2 1

2 1

N N

2

._.g...................l...l

...l....l...l....l....l.

l...l...l..

l 09/81 07/01/80 - 06/30/81 1

2 2

2 N

2 N

3 2

H

.....!..................._l.

....l...l...l....l....l....l..

l...

...l 02/81 01/01/80 - 12/31/80 2

3 1

2 2

2 2-H 1

ti

....l...l..

.l

...l..;...

l........l...l...l.

l 1 STA!UUP TESTI!G INALUATED AS PAIU OF 015

00HSTFOCTICtl=1.STAICUP TEST =1.Etn SUPP:2 8 OVERALL 00tiSTRIX7 TION RATIl0 ASSIGNED CATIUOffl 1.

PLA!1T NAME: S110REllAM EmI0ti:

1 HPT ASSHT. PERIOD SF 00tU PIPE SIC AUX ELEC INST DSN QA LIC

===l====================;===l::: l====j:=-l====l====l====l===!:==l===l 05/84 02/01/83 - 02/29/84 1

1 1

1 2

2 1

N N

2

.....l...................l..l....l....l...[....l....l....l...l..j...l NURm-1214 3-5

BAIX HISTORY (REACTORS UNDER CONSTRUCTION)

PLA!G HATE: SP%UEHAt01A 2 IO3IDti:

1 PFT AFEift. PERIOD SF OCtn PIPE SEC AUX ELEC INST DSH QA LIC

===== l:::::::::::==== = ===:. j=== ! = := l ::= l := l==== l :::l==== l=== l== = l::= l 08/84 02/01/83 - 01/31/04 tt 1

1 1

1 1

1 H

H 1

.....l.....................,..

!....l....l...l....l....l....l...l...:...l 08/83 02/01/82 - 01/31/83 H

H 2

1 N

2 N

H H

H

.....l...................l...l....l....l...l....l....l...l...l...

...l M A!E Hats : SUSQUEHAN!1A 1/2 PB310ti:

1 Id'T ASSift. PERIOD SF 00tR PIPE SIC AUX ELEC ItiST DSH QA LIC

l==============:e :::!:::l :::! ::: :::l====l====l::::l===l===l===l 110/82 03/01/81 - 02/28/82 H

H N

N 2

2 2

H 2

2

.....l

....l...l....l....l...l....l.

.l....l...l...l...!

204/01 01/01/80 - 12/31/80 1

2 2

2 2

3 3

H 3

H

.....:...................l...j....l....l...l....l....l....l...l...l 1 RATIIUS IN REFoiriS 10/82, 8/83 AND 4/84 ABE FOR Uti1T 2 OtLY.

't OPERATIOt4S RATIlOS WEFE ALSO ASSIGNED FOR PEEOffrS 4/81 AND 4/84.

tUfS3-1214 3-6

SALP HISTORY (RIIACTORS UNDIER. CONSTRUCTION)

ITAt(T NAME: IELLEFQTTE 1/2 IEI0th 2 RPT AWr. PERIOD SF 00tfr PIPE SIC AUX ELEC INST DSN QA LIC

=====l:::::::::::=========!=r l====!====l:==l====j====l====l::=l:::::==l 09/85 03/01/04 - 05/31/85 N

2 1

N 2

2 2

N 2

N

____l

..l_...l..

....l____l____l_._l......l.__l 06/84 01/01/83 - 02/29/84 N

2 2

2 2

2 1

N 2

N

__...!..................._l___l.___j.___l

..l....l...

l... l_.l-..!...l 12/82 07/01/81 - 12/31/82 N

2 3

2 N

2 2

N 2

2

.....l_............... _..j...!

...!. __l__.l....!....l_...l...l...l___l 10/80 04/01/79 - 08/31/80 2

2 2

2 2

2 2

N 2

N

__...l_

.__l....l_. _l. l.. ! ___l...!...l___l___l FTAtif tWiE: CATAMM 2 RB3I0th 2

RPT AWT. PERIOD SF 00tfr PIPE SBC AUX ELEC INST TEtt QA LIC

===!====================l ::l===uj====l==l====l====l:===l:::===l===l 12/85 03/01/04 - 09/30/85 N

1 1

2 2

2-2 N

2 2

l........._

l..

l....

l...l__..

l....

..l_....:

07/84 05/01/83 - 02/29/84 H

2 2

N 2

2 2

N 1

2

...l l__..l....l___l.

..l..__l..._l_..!.... _l 10/83 06/01/82 - 04/30/83 N

2 1

N N

2 2

N 1

2

...............___l......j.. _j.__!....l........!.._l...l.

.l 12/82 09/01/80 - 05/30/82 N

1 2

2 N

2 N

N N

2

..._.i....__s_......

..l..l____l___ l___l _..!_

...l...l_..:

03/8109/01/7Ci - 02/28/81 2

2 2

2 N

-2 2

N 3

H

.....l.. __....___........l...l....l_...l...l___.l..__l_...l...j.. l.._l IUBID-1214 3-7 11 m.-,-

+

--<--.--~s+

,-n--

e,n-4 n

o_ c rsp

3 SALP HISTORY (REACTORS UNDER CONSTRUCTION)

PLR C NAME: GRAND GULF 2 RB3ICti: 2 RPT ASStR. PERIOD SF 00tU PIPE SRC AUX ELEC INST DSN QA LIC

=::::! :::::::::::::::::::::==;:===l::::::::l:.::::::::!====l===;::::::::

07/85 10/01/83 - 04/30/85 N

N N

N N

N N

N 3

3

_____l___;..__; ___;___l____;.___;__._;___;-__;___;

01/84 09/01/82 - 09/30/83 N

N N

N N

N N

N N

N

_____;____.____ __________l___;____;___ l_ _;____;____;____;___;. _;___j 04/83 07/01/81 - 08/30/82 N

N 2

N 2

2 2

N 2

2

_____;________ ___________j __;____; ___;___; ___;____l____;___l___;_._;

11/82 07/01/80 - 06/30/81 N

N 2

2 N

1 1

2 2

N

_____;____________________l___ -___;____j.__;____;____l____l___;

01/81 09/01/79 - 09/30/80 2

2 2

2 2

2 2

N 2

N

_____;____________________;___l____;____;-__l____;____l___..;___;___l___;

PLAtC NAME: HABBIS 1 REGION:

2 RET ASSMT, PERIOD SF 00tU PIPE SRC AUX ELEC INST DSN QA LIC

=========;===;========;:::::::: ::::l ::::: ::::::===l 09/88 1 /01/85 - 07/31/88 H

N 1

N 1

2

.- 2 N

2 1

_____l___;____l. __;___;

__l____l___

l__ l___l___l 01/86 05/01/84 - 10/31/85 1

1 1

2 2

3 2

N 2

2

_____;____________________;___l____l____;.__l____l____;____l___;___l___l 08/84 02/01/83 - 34/30/84 1

1 2

2 1

2 N

N 2

2

..____;___;____l____l___;____;____l____;___;___l___;

05/03 01/01/62

. /31/83 N

1-2 2

1 2

N N

2 3

_____;___l____l____;___l____; ___;____;___;___;___;

05/82 07/01/80 - 12/31/81 2

2 2

2 2

2 N

2 2

N i

______l___l____;___ ;___l_ __;____;____j __;__ ;-__;

10/80 04/01/79 - 08/31/80 2

2 2

2 N

2 2

N N

N

_____;______________ ____ l __j_ __l____;___;____;____;____j.__;___l___;

1 l

l NUREG-1214 3-8

1 SALP HISTORY l

(REACTORS UNDER CONSTRUCTION)

PLA!U HAME: M0GUIRE 2 REGION: 2 RPT ASStR, PERICO SF 00tR PIPE SRC AUX ELEC INST DSN_QA' LIC

=====!====================!===l====l====!===l====l====!====l===l===j===l 12/82 09/01/80 - 05/30/82 N

N 1--N 1

2 1

N N

2

_ __ _ _ l _ _ _ _ _ _ _ _ _ __ __ _._ ___ l __ _ l.... l __ _ _ l _ _ _ !. _ _ ! __ _ _ l _ ___ !.__ l... !.. ! -

1 PLA!C NAME: NIiUIRE 1/2 REGION: 2 RPT ASStR. PERIOD SF CONT PIPE SRC AUX ELEC _ INST DSN QA LIC

=====j====================l===!====j====l===========j====j===!===!===l

~

10/80 05/01/79 - 04/30/80-2 2

2 2

2 2 _

2-_

2

' 2

.N

_____!. _______________...!___l____!-__ !___!____!_4__l....l...l.__l___l l

l

)

NUREG-1214-3-9

,.w-%-r.

+,,--

c

...,,.m_,'m,

,c y

,,.-y,

-,--,y-9,r

., <,. ~.

i SALP HISTORY (REACTORS UNDER CONSTRUCTION)

PIRC HA?O M0GUIRE 2 RWION: 2 RPT ASSMT. PERIOD SF CONT PIPE SRC AUX ELEC INST DSN QA LIC

=====l====================l===l====l====l===l====l====:====l===l===l==-l 10/80 05/01/19 - 04/30/80 2-2 2

2 2-2 2

N 2

N


l----__-------....__-l_--j....l__--l...l-_..l....l.

..l---;..-l_-.

PLAtC NAME: SEQUOYAH 2 R E I0th 2 RPT ASSMT. PERIOD SF CONT PIPE SRC AUX ELEC INST DSN QA LIC

=====l====================l===l==--l====l===l====l====l====l===l===l===!

11/82 07/01/80 - 06/30/81 N

2 2

2 2

2 N-H 2

N

-....l....--...........--l---l....l----l---l...l----l----l--.;---l--

01/81 08/01/79 - 03/29/80 2

2 2

2 2

2 2

2 2

N

....-l--------------------l---l....-l

.--l---l---.l....l----l---l---l..

NUBB3-1214 3-10

SALP HISTORY (REACTORS.UNDER CONSTRUCTION)

PLA!TT !MME: SEQUOYAH 1/2 PWION: 2 RPT ASSMT, PERIOD SF 00tfr PIPE SBC AUX ELEC INST DSN QA LIC

===== :::::::=============l===l====l====!== l==== ::::l====l:::!===!= -;

101/81 08/01/79 - 03/29/80 2

2 2

'2 3

2 2

2 2

N

_____; ___________________l___j.___;-___l___l____l____l____l___l__.l___l 1 RATI!OS FOR PEPORTS 1/81 AND 11/82 ARE FOR UNIT 1 ONLY.

PLAtfr NAME: ST LUCIE 2 BMION:

2 BPT ASSMT, PERIOD SF 00tfr PIPE SRC AUX ELEC INST DSN QA LIC

=====::::============:::==:===l====l====l=======!==:::::==j===;:== =:::

01/83 09/01/80 - 06/30/82 N

N 2

2 2

2 2.

N N

2

_____l____________________:___l____l___,l___l____l____l____ ___:___l___l 01/81 09/01/79 - 08/31/80 N

2 2

2 2

2 2

2

.2 N

_____;_________________ __;___;____l____l___ ____l____l____l___l___!___l l

1 l

NUREG-1214 3-11

t P

SALP HISTORY (REACTORS-UNDER CONSTRUCTION.)

1 f

PLANT NAME: SUtt1ER 1 RB3 ION: 2 RPT ASStfr. PERIOD SF CONT PIPE SRC AUX ELEC INST DSN QA -LIC

===== j = = === ==== = = = = === = = = = l = = = l== = = j = = = = = = = l = = = = = === j ::== j = = = j === j === l 11/82 09/01/80 - 03/31/82

-N N ~ 2 N

1 1

1 N

l' N--

...--j_____________...___!___l____l____l___l_.._j--__l.___l___l---j___l 3

101/81 09/01/79 - 08/31/80 2

2 2

2

'2 2

N 2

N

-i

_____l________----_______.l___l____l___.l_2

__l____l____l____l___j.__;.__l 1 OPERATIONS RATINGS ALSO ASSI' RED WR RENRTS 1/81 AND 11/82.-

PLANT NAME: VOGTLE 2 REGION: 2 RPT ASStfr. PERIOD SF CONT PIPE SRC AUX ELEC~ INST DSN QA LIC

=====l=======================l====j=======l====!====j====l===l===l===l-101/89 10/01/87 - 09/30/88 :N N-1 N

-1

.1 1,

N

- N N

_____l___.._______

.__l..__j..--

.l----l

___j____j_..l___l __l 203/88 10/01/86 - 09/30/87 1

i 1

1 1

2

1. - N 1

.N

_ _ __. ! _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ _.. _ l _ _ __- l __ _ j _ _ _ _ l _ _ _ _ l _ _ __ j -_ _- l _ _ _- l _ _. ; -

1 ENG/ TECH SUP-1, SAF ASSESS /QV-1, PREOP TEST-1 PREOP TEST =1 t-NUPEG-1214 3-12

-,w

,a.

SALP HISTORY-(RRACTORS UNDER cot 4STRUCTION)

PLANT NAME: V0rJTLE 1/2 RiiGION: 2 RPT ASSMT, PERIOD SF 00tfr PIPE SRC AUX ELEC INST DSN QA LIC

=====!=======================l====!====l===l====;====l====l===l===!===!

12/86 07/01/85 - 09/30/86 1

1 2

2 2

2 1

1 1

2

__ _ l____________________;___l____l____!___ ____l____l____j_.. ___:-__:

11/85 11/01/83 - 06/30/85

.1 2

2 1

2 2

N N

1 2

_____!____________________;___!____;____;___ ____;____;____l___;___;___;

05/84 11/01/82 - 10/31/83 2

2 2

1 N

2

.N N

1 2

_____;____________________;___!____l____!___ ____;____g____

10/82 07/01/81 - 10/31/82 2

1 2

2 H

H N

N 2

1

___;____l____;-__..,__j ___l___ l___ -__;___j 09/81 07/01/80 - 06/30/81' N 2-2-

2-N. - N-N

-N-N N

PLANT NAME: WATTS BAR 1/2 PJiUION: 2 RPP ASSMT. PERIOD SF OnNr PIPE SHC AUX ELEC INST DSN QA LIC

=====l=======_============;===;= m ;a==[===l===.=l==== N===l===;===j===l 111/95 01/01/85 - 05/31/85 N

N 2

N

-N 2

N N_

2 3

___.._ _______ ____________j.__;____;__. 3 __;____;____;____;___; __ ___;

03/85 03/01/84 - 12/31/84 N

N N

N N

N N-N 2

3

_____;___ ________________!___;-___;__._j___[___

l____;___;___; __;

206/84 01/01/83 - 02/29/84 1

2 N-N_

2 N

N 2

2

_________________l___ -_2__ ____;___ --...:. __;____;___;___;___;

306/84 01/01/83 - 02/29/84 1

2 2

N N.

_2 -

N-N 2

3

__,.__;____-____________ ___!___j__ _;___ j___l____;____l__

-__;___l___;

04/83 07/01/81 - 12/31/82 N

N 2

2 2

2 2

,N_.3 2

_____l____________________;__ ;____j____j___j ___j.___l____-l___l___l___;

10/81 07/01/80 - 06/30/81 N

2 3

2 2

2 2

N

'N

_____ ________ ___________;___;____ ___ _3.

__ ___ ;____ -___;___l___

09/80'_04/01/79 - 08/31/80 N

N N_N N

N N-N N

N

__ _ __ ; ___ __ _ __ _ _ _.._ _ ____ g __ _ ; ____ i _ __ _ j _ _ : _ __ g _ __ _ ; __ _ ; _ _ ; ___ ! _ __ p 1 UNIT 1 REP. PER.; UNIT 2 PER 03/01/84-05/31/85: LTHIS'IS UNIT 2 REPORT 2 RATINGS ARE NR UNIT 1 ONLY FOR RIPORTS 6/84 AND 3/85.

RATINGS ARE FOR UNIT 2 ONLY.-

NUREG-1214 13

..e-

,,*m's wv v t~n"

l l

SALP HISTORY CREACTORS UNDER CONSTRUCTICt.4 )

PLANT NAME: BRAIDHOOD 1/2 REION: 3 RFP ASStfr. PERIOD SF CONT PIPE SBC AUX ELEC INST DSN QA LIC

=====l:::::::::::::=======;:==;::==;====j===;::==;====l====l===;===l===;

04/86 07/01/84 - 11/30/85 N

2 2

2 2

2 2

N 2

2

_____;____________________;___;____l____;___l____j.___;____;-__;___;___;

03/85 01/01/83 - 06/30/84 N

2 3

3 2

2 2

N 3

2

_____;____________________;-__;____;____;___!____;____l____ ___;___;___;

03/84 01/01/82 - 12/31/82 N

2 2

3 2

2 N

N 3

1

_____:____________________;___l____;____l___l____l____l____ -__ __; __t 12/82 07/01/80 - 12/31/81 N

2 2

2 2

2 2

N 3

2 l____________________l___;____;____l___;____l____l____;___;___;___;

12/80 07/01/79 - 06/30/80 2

2 2

2 N

2 2

N 2

N

_____;____________________;___;____j____;___;____;-___;____;___;___;___;

PLANT NAME: BYBON 2 BB310th 3 3Pr ASSMT, PERIOD SF 00tTT PIPE SBC AUX ELEC INST DSN QA LIC

=====::::=================l=== :===!====l===;=:::::::::::== :==;:::l :::

109/84 01/01/83 - 04/30/84 N

2 2

2 2

2 2

N 2

2

_____;-______.____________!___l____l__ _;___g.___;____; ___;___;.__;___;

I OPERATIONS RATItOS WERE ALSO ASSIGNED FOR REPORTS 7/84,1/86, AND 1/87.

NUFB1-1214 3-14

~

SALP HISTORY (REACTORS UNDER CONSTRUCTION)

P A U HAME: BYRON 1/2 REION: 3 RPT ASSMT PERIOD SF C0tU PIPE SRC AUX ELEC INST DSN QA LIC

=====!====================l===j====l====l===l====l====l====l===l===!===l 03/84 01/01/82 - 12/31/82 N

2 2

3 3

3

.N N

3 1

!___________________ l_..___!.__ j___l____g.___!.___l.._l 12/82 07/01/80 - 12/31/81 N

1 2

2 N

3 2

N 2

2

_____ ____________ ______;___; __-g____!___l____l..__l_..__;___! __;_..g P!W E NAME: CALLAWAY 1 REION: 3 PPT ASSMT. PERIOD SF COtU PIPE SRC AUX ELEC INST DSN QA LIC

=====:====================!===;====l====!===l====[====j====j===l===;===j 104/84 10/01/82 - 11/30/83 N

1 2

1 1

2 1

N 2

1

_____;______....... __.._:.._....l____l___l____:..__l...

07/82 07/01/80 - 09/30/81 2

2 2

2 N

3 N

N N

1

_____;-. _________ -_____l___;___ g..__;_ _ ____;. _!_...!___-l_ _l___l 1 OPERATIONS RATINGS WERE ALSO ASSIGNED.

NUREG-1214 3-15

~

SALP HISTORY (REACTORS UNDER CONSTRUCTION)

PLA!U NAME: CLItRON 1 RFU10N: 3 RPr ASSiff. PERIOD SF 00tU PIPE SBC AUX ELEC INST IGN QA LIC

=====!====================:===:====:====:===:====:====:====:===:===:===:

01/80 03/01/84 - 08/31/85 2

1 1

2 2

2 2

N 2

1

_____:-___.,______________ ___l____ __.._:-__!____

___;____l___:-__;___

07/84 10/01/82 - 02/29/84 N

2 2

2 2

2 2

N 2

2

__.._________________!___ ____l____!___:__.:.___ -___l___

06/83 10/01/81 - 09/30/82 2

2 2

2 N

N 2

N 3

2

_____l_____________ ______l___l____l____l___

___l___!___

OG/82 07/01/80 - 09/30/81 2

2 3

2 2

N 2

N 3

2

_____:-___________________l___:____;____l___;____l____ ____l___

__l___

11/80 07/01/79 - 06/30/80 2

2 2

2 N

2 2

N 3

N 4

____l____;___;____:____:-___:___l___l___

PL8RT HAME: FEPt!I 2 BEDION: 3 RPI ASSMT. PERIOD SF CONT PIPE SBC AUX ELEC INST DSN QA LIC

=====:===========================:====:===:====:====:====:===!======:

102/86 10/01/84 - 06/30/85 N

N 2

N N

2 2

N 2

2 03/85 10/01/83 - 09/30/84 N

N 2

N N

3 3

N 2

2

_____;____________________l___l____ ____ -__:-___ ____l__ _l___l___:___

02/84 10/01/82 - 09/30/83 N

2 2

2 N

N N

N 3

2

_____:______________.._____;___l____!____l___;____

06/83 10/01/81 - 09/30/82 N

2 2

2

.2 3

H N

2 i

_____ _______.____________ ___ ___,.j____ ___l____ ____g____ ___l___l___l 1 OPERATIONS BATItGS WERE ALSO ASSIGNED.

NUREG-1214 3-16

SALP HISTORY

( RICACTORS UNDER CONSTRUCTION)

PLANT NAME: LASAILE 1/2 RmION: 3 RPT ASSiff. PERIOD SF 00tfr PIPE SBC AUX ELEC INST DSN QA -LIC

=====l====================l===l====j====l===l========l=======l======l 111/82 07/01/80 - 12/31/81 N

2 2

2 2

N 2

2 2

2

_____;-___________________l___l____!____ -__j ___!.___l____l___l___l___l 12/80 07/01/79 - 06/30/80 2

2 2

2 2

2 2

N 2

N

_____!____________________l___; ___l____l___l____l_ __! ___l___l___l___l 1 QPERATIONS RATItOS ALSO ASSIGNED FOR REEORTS 11/82 AND 7/83 (UNIT 1),

PLAlff NAME: PERRY 1 REION: 3 RPP ASSMT. PERIOD SF 00tif PIPE SRC AUX ELEC INST DSN QA LIC

=====l=======================l====l====j===l

=======!====l===l======j 11/85 01/01/84 - 06/30/85 N

1 2

1 N

2 1

N 2

2

_____!____________________!___l____!____l___!____l__..!____l___l__..!___l NURE-1214 3-17

TALP HISTORY

( BEACTCMRS UNDER CONSTBUCTION)

Pl# C HAME: PERRY 1/2 REION: 3 RPT ASStfr. PERIOD GB OONT PIPE SRC AUX ELEC INST DSN QA LIC

==== = l ====== = = ============ ! = :0==== l s::== l ::= l :::: ! = = = = ; = === l = = = === j ::: l 105/84 10/01/82 - 12/31/83 N

1 2

2 2

2 2

N 2

2

_____l____________________j __l____l____ ___l____!____l____j___;-__l___l 02/83 10/01/81 - 09/30/82 N

1 2

2 2

N N

2 N

1

_____l____________________;___l____l____l___!.___;-___l____!___l___;___;

07/82 07/01/80 - 09/30/81-N 2

2 2

2 3

2 1

N 1

_____l____________________;-__l____;____j __l____j____l____l___;___ -__;

10/80 07/01/79 08/30/80 2

2 2

2 N

2 2-N 2

N

_____l____________________l___;____l____;___g____;____l____l___j.__[___;

1 UTE 04/85 TCPLT 97/44 EFLD 07/85,07/87 TYPLT BWR CATI Y NURE-1214 3-18

SALP HISTORY (BEACTORS UNDER CONSTRUCTION)

PLAtR NAME: OCNANCHE PEAY, 1/2 RMION:

4 RPT ASSMT. PERIOD SF CCtc PIPE SRC AUX ELEC INST DSN QA LIC

===== ::==================:::::::::::::::===::=== ::::::===:::=;:==:::=:

104/90 09/01/88 - 08/31/89 2

2 2

2 2

2 2

N N

N

_ _ _ _ _ _ _ _ _ __ _ _ _., _ _ _ _ _ _ _ _ _ : _ _ _ p _ _ _ _ _ _ _ p

_ _ _ _ _ _ _ _ p _ _ _ p _ _ p _ _ p _ _ :

212/88 09/01/87 - 08/31/88 N

2 2

N 2

2 N

2 2

N

____________________l___;____!.___ ___ ____:-___ ____ ___ ___ ___:

06/84 10/01/82 - 10/31/83 N

2 2

2 3

2 1

2 2

2

_ __ _ _ p _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ p __ p _ _ _ j._ _ _ p_ _ __ _ _ p _ _ _ p _ _ _ p _ _ p __ p _ _

09/82 10/01/81 - 09/30/82 N

2 2

1 N

1 1

N N

1

____________________!___ ____l____;___

____!____;___ __3:-__:

10/8008/01/79-07/31/g0' N N*

N-N*

N-it N

N-N N

1 Constniction and Corrective Action Programe : Category 2 2 OPS =2, EP=2. SEC=1 1

PLATE NAME:

BIVER BEND 1 REICN:

4 RPT ASSMT, PERIOD SF CCNT PIPE SBC AUX ELEC INST DSd QA LIC

=========================:===:====:::===== ::==:::== :::::::::::=:===:

102/85 08/01/83 - 12/31/84 N

1 2

2 2

2 2

2 2

2

___:-__:____l____: ___:___ ___ __:

09/83 09/01/82 - 07/31/83 N

2 2

2 2

2 2

1 2

2

_ _ _ _ _ p _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ p _ _ p _ _. j _ _ _ _ p _ _ p _ _ _ p _ _ _ p _ _ _ j. _ _ p __ p _ _ ;

10/82 09/01/81 - 08/31/82 N

2 2

2 2

N N

2 N

2

_____p___________________p__p___p ~,.p.-p__;.-___p___p__p__;___:

10/81 07/01/80 - 06/30/81 1

2 2

N 2

N N

N N

1 p___________________ p__ p___p__.;...:.:,____ p___ p___ ___p__j___

09/80 09/01/79 - 08/31/80 N

N N

N N

N N

N N

__ __ _ p_ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ p _ _ p _ _ _ : _ _ _ _ p _ _ p _ _ _ p _... _ _N

__ p__ j ___ p__ :

1 OPERATIONS RATItOS WERE ALSO ASSIG@ A l

r NUBEG-1214 3-19

l 4

SALP HISTORY CREACTORS UNDER CONSTRUCTION)

PLAtC NAME:

SOUTH TEYAS 2 PE10N:

4 RPT ASStfr. PERIOD SF 00tc PIPE SBC AUX ELEC INST DSN QA LIC

==================::::::=l:::::::=l::==l=:=;:===l=:::::===l:::l ::l===l 08/88 01/01/87 - 12/31/87 N

1 2

2 1

2 1

N 1

-2

_____l____________________l___l____l____l___l____l____l____l___l___l___l PLANT NAME: SCUTH TEXAS 1/2 BMION:

4 RPT ASSMT, PERIOD SF CONT PIFE SBC AUX ELEC INST DSN QA LIC

=====l===:::::============l===l:::::::==!:==l::::l::::::::=j:::l:::l:::l 03/87 07/01/85 - 12/31/86 N

1 2

2 1

2 2

N 2.

2

_____l________.___________l___l____l____l___l____l____ -___l___l___l___l 09/85 12/01/83 - 06/30/85 2

2 2

2 2

2 N

1 2

2

_____l____________________l___l____l____l___l____ -___l____l___j___l___l 06/84 12/01/82 - 11/30/83 3

2 1

2 N

1 N

2 2

1

_____l______.____________,l___l____l____l___l____l____l--__;___l___l___l 06/82 07/01/80 - 06/30/81 N

2 N

N 2

N N

N 3

1

_.___l_____________ ______l___l____l____l___l____.___l____l___l___l___l i

i l

l l

NUREG-1214 3-20 l

I

SALP HISTORY (REACTORS UNDER CONSTRUCTION)

PLA!U !MME: WATERFORD 3 REION: 4 RPT ASSiff. PERIOD SF CotC PIPE SRC AUX ELEC INST DSN QA LIC

=====!==================== :::!:::::====; :::====j::::::::::::=;===j::::

01/84 07/01/82 - 06/30/83 N

N.

N N

N N

N 2

2 2

_____:-___________________ ___;____;____ ___ ____..___ ____;___!___l___

12/82 07/01/81 - 06/30/82 N

2 3

3 2

N 3

H H

2

_____: ___________ _______l___l____;____l___ ____;____..___t___;___ ___:

07/82 07/01/80 - 06/30/81 N

1 2

2 2

N 2

N N

3

_____ ____________________ ___;____;____;___;____ ____;____ ___l___ ___;

11/80 08/01n9 - 07/31/80 1

1 2

2 2

N 2

N 2

N

_____;____________________l___l____;-___;___l____l____;-___l___l___ -__l PLAtC NAME: WOJE CBEEK 1 REGION: 4 RPT ASSMT. PERIOD-SF COtc PIPE SBC AUX ELEC INST DSN QA LIC

============ ::=====j===:====;:===;:==!==== :=== :::=:::::::=!===

102/85 08/01/83 - 09/30/84 H

N 2

2 2

1

-1 N

2 1

__________._________!___;____;____ ___ ____;___ ____j.__;.. ___;

12/83 08/01/82 - 07/31/83 N

N 3

3 1

2 N

N 2

2

___;____;-___;___l____ ____;____ ___ ___ ___

11/82 08/01/81 - 07/31/82 N

1

-3 2

2 2

2 N

1 1

__;___;____!____;___;____;____l____ ___l___;___;

06/82 07/01/80 - 06/30/81 N

1 2

2 2-2 N

N N

1

. =___;___;____;____;___ ____;____ ____ ___;___;___;

=

11/80 08/01n9 - 07/31/80 1

1-2 2

2 N

2 N

N N

_____l____________________l___:____ ____:___l____

____:___l___ ___l 1 OPERATIONS BATINGS WEBE ALSO ASSIGNED.

NURE-1214 3-21 l

l

_,_ J

4 i

SALP HISTORY (REACTORS UNDER CONSTRUCTION)

PLANT HAME: DIABLO CANYCti 1/2 REION:

5 RPT ASSMT. PERIOD SF 00tfr PIPE SRC AUX ELEC INST DSN QA LIC

=====;====================j===!====l====l===l====l====;===-l===l===l===l 103/83 07/01/81 - 12/31/82 N

1 2

1 2

1 2

2 2

N

_________________________;_______:____;___l____-___;____l______;___l 1 OPERATIONS RATItGS WERE ALSO ASSIGNED.

PLAfff NAME: PALO VERDE 3 REGION:

5 BPr ASSMT. PERIOD SF CONT PIPE SRC AUX ELEC INST DSN QA LIC

=====:====================l===j====l====;=======l====j====l===;======!

01/87 10/01/85 - 09/30/88 N

2 2-2 2

2 1

N 2

2

_____;____________________l___;____;____;___l____;____l____;___;___;___;

12/85 04/01/84 - 09/30/85 N

2 2

2 2

2 1

N 2

2

_____;____________________l___l____;-___l___[____;____;____;___l___l___l NURFD-1214 3-22

SALP HISTORY CREACTORS UNDER CONSTRUCTION)

PL WT NAME: PALO VERDE 2/3 REUION: 5 RPr ASSMT. PERIOD SF 00tU PIPE SRC AUX ELEC INST DSN QA LIC

=========================l===l========l===l====l====l====l===j===j===l 106/84 03/01/83 - 03/31/84 1

2 2

2 3

2 1

N N

2

_____!____________________l___l____l____l___l____l____l____! __l___l___l 1 DTE 04/85 %CPLT 99/95 EFLD 10/86,01/87 TYPLT EWR CATI N PL WT NAME: PALO VERDE 1/2/3 REGION:

5 RPr ASStfr. PERIOD SF 00tU PIPE SRC AUX ELEC INST DSN QA LIC

=====l====================l===j====j====l===l====l====j====l===l===l===l 106/83 07/01/81 - 02/28/83 1

1 2

1 2

2 2

N N

1

_____l____________________l___l____l____l___l____l____l____l___l___l___l 1 OPERATIONS RATItOS ALSO ASSIGNED FOR REPORTS 6/83, 6/84, 12/85, 1/87.

3 i

i NUREG-1214 3-23

SALP HISTORY (REACTORS UNDER CONSTRUCTION)

PLAlU HAME: PAID VERDE 2/3 IE ION: S RPT ASSiff, PERIOD SF 00tU PIPE SIC AUX. ELEC INST DSN QA LIC

====:l=============::::===l===j====l====l===l::==l::==l====l===l===l===l 09/81 06/01/80 - 06/30/01 N

N N

N N

N N

N N

N-

.....l.........

_.l..j..._l....!___l..__j....!..._l___l___l...l 05/80 05/01/79 - 05/30/80 N

N N

N N

N N

N N

N

____.j_..............___

g.__l__..l___.t..

l

...l

.._; ___;. -j..!_..!

PLA!C NAME:

SAN OIOFRE 3 RSGION: 5 RPT ASSiff. PERIOD SF OctG PIPE SBC AUX ELEC INST DSN QA LIC

= = = :: l = = ======= === ===== = =: l = = = l=== = j = === l === l === = l =:: = ; = === [ :== l ::: : :== l 12/82 07/01/81 - 06/30/82 N

1 2

1 2

1 2

2 2

N

.....;...........___.....j___l____!..__l__.j._..l____l....l___:...l NUREG-1214 3-24

5 SALP HISTORY (REACTORS UNDER CONSTRUOTION)

PLAlff NAME: SAN OtOFRE 2/3 REIGH:

5 RPT ASSMT PERIOD SF 00NT PIPE SRC AUX ELEC INST DSN QA LIC

=====:::::::::::::::::====l===l:::=j====j===!====l::: l====j===!===l:::1 109/81 06/01/80 - 06/30/81 N

N 2

N 2

2 1

2 1

N

-....:._...___......_.l...:....l....:..l....g........;___j. _j...t 09/80 06/01/79 - 06/30/80 1

1 3

2 2

2 2

N 2

N

... -- l... _ _ _ _ _ _ _ _ __..... g... l.. _ t.. _ ; _. _ _ _. l.... ;.... l._. l... j __

1 OPERATIONS RATIt03 WERE ALSO ASSIGNED FOR REEORTS 9/81 tRD 12/82.

PLAfft NAME: WASHItGIOtOiUCLEAR 2

~

REI0ti: 5 RPr ASSMT. PERIOD SF 00tfr PIPE SRC AUX ELEC INST DSN QA LIC

==l===========::::::===:::::::::j:::=l::::====:::::l::::::::l===l

12/83 08/01/82 - 07/31/83 N

2 2

N 2

N 2

N 2

2

...l..........._....-.._j...;_...j.. _;.__;....:....;_..;__.g...;___l 12/82 07/01/81 - 07/31/82 2

2 2

2 3

2 2

2 2

1

--...;...............l

_.l.... -_..l...:___.l._

_l_ _l...l...l 10/81 05/01/80 - 09/30/81 N

2 3

2 2

2 2

3 2

N

....;__...___......._.__l..

....j....;

..l

___;....j....j...l_.

l...;

11UREG-1214 3-25

m

. ~_

NRJ#Onu335 U 5. NUCLEQR RIOULQTORY COMMI5510N IR fN 4R 5"sE

~

BIBLIOGRAPHIC DATA SHEET

<see,an,,ceer,, pa en m.,-i NOREG-1214 i intt ANo suom

Revision 9 Historical Data Summary of the Systematic Assessment of 3

DATE REPORI PUBLISHED Licensee Performance l

February 1992

4. f lN OR GR ANT NUMBE R b AUTHORtSI 6 itPE OF REPORT F. Allenspach Technical L PE RIOD COVE RE D esacJuneve Deres s 7/01/91 - 12/03/91 8P F RM NG ANil Al lON N AM E AND ADORi $$ fu wac. pre.* p= won. Ortece or nepen, u.3 Necher nepuderory coa auss,an, o.ar aws.ry estrien st consterent, prove Division of Licensee Performance and Quality Evaluation Office of Nuclear Reactor Regulation US Nt. clear Regulatory Commission Washington, DC 29555 9 $PO G G ANlZATtON - N AM L AND ADDR LS$ In Nnc, svon "senw a eson", a conoem a>r. prove Nac ouve on onare or neeen, v S. Nuener neportory commnuen.

Same as above

10. SUPPtEME'NT ARY NOTES
11. ABST R ACT ouo mords ar mess The Historical Data Summary of the Systematic Assessment of Licensee Performance (SALP) is produced periodically by the U.S. Nuclear Regulatory Commission. This summary provides the results of the assessment for each facility by NL region and is further divided into the following sections:

Section 1 presents the most recent SALP report ratings for facilities in operation and under construction.

Section 2 presents a chronological listing of all SALP report ratings for each operating facility. Section 3 presents a chronological listing'of all SALP report ratings for each facility under construction.

For historical purposes, past construction ratings for facilities that recently have been licensed also are listed in Section 3.

12. CIL Y WORDS/DESCR!PIORS iter wonn er parewe rnee ma nuar eveewaen m assemg rae roporr s la AVAskAsiuir s) Af tetNT Unlimited l

Systematic Assessment of Licensee Performance (SALP)

'"*c""'""^"''"

l U.S. Nuclear Power Plants

"*a"->

Licensees Unclassified Construction Facilities l

Operating Facilities Unclassified Performance History

'6 NuM86Ho*P^ cts 16 PRICE -

l 80C conu 336 (2C

THIS DOCUMENT WAS PRINTED USING RECYCLED PAPER s.

-