_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Georgta Power Cornoany 333 Pedmont Avenue Attanta. Gmg a 30308 Teleptene 404 526 6526 Ma+ng Address.
Post Off;ce Box 4545 At'anta, Georg.a 30302 L
Georgia Power L T. Gucwa tN " 'ot%r" ekt"c b ""m Manager Nuclear Engineering NED-84-392 and Chet Nuclear Eng neer July 24, 1984 Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 Division of Licensing U. S. Nuclear Regulatory Ccmnission Washington, D. C.
20555 NRC DOCITT 50-366 OPERATING LICENSE NPF-5 EDWIN I. HA'IGI NUCLEAR PLANT UNIT 2 PIPING REPLACEMENT RADIOIDGICAL CONIBOIS CHANGES Gentimen:
Georgia Power Cmpany letter NED-83-645 dated Decmber 27,
- 1983, provided infomation to NRC concerning radiological controls during replacment of the main recirculation systs piping at Plant Hatch Unit 2.
%e information was provided in response to several specific questions concerning radiological controls raised by the FRC staff following their initial review of our Novmber 7,1983, subnittal which provided details of the piping replacment.
Since the start of the piping replacment, several itms concerning radiological controls have been re-evaluated.
Consquently, we hereby advise you of certain changes in quipnent or methods originally addressed in Attachment 1 to our Dec eber 27, 1983 subnittal. Please be advised that the following changes have ocx:urred since that subnittel was made:
- 1. Water bladders were not used in the suction nozzles f'or shielding as originally planned for Hatch Unit 2 (
Reference:
Deceber 27 subnittal, Attachnent 1, Page 1, Its A, (4), but, were evaluated for use.
%e water bladders were found to be a viable shielding technique for use where dose rates are expected to be higher than those encountered at Hatch Unit 2.
0407300293 840724 PDR ADOCK 03000366 P
. 00l t
10
y, q
y "j;
- ~* v
[,.
~
9,
~
y
.],
d,-T '
.**; ~
j-
,.,N ga
-"y.<..
GeorgidPower
' l
~
o
- directorofNuclear,ReactorBegulations'[
'U. S. Nuclear Regulatory Cotimission
[ Washington,D.;C.[<20555
'e
'A July 24, 1984
,g Page 2
^
-5 e
- 2. The tenporary ventilation systen was not connected' to the standby gas treatment systen as originally plarnfx3. - (
Reference:
. December 27 letter, Attachner( 1, Page 2, Iten C, First Paragraph).
It did, however, utilize a'fenetration which.is normally part of the standby gas treatment syst,ent<
r e
c
.c
~r StEuld you have 'any questions ib"._4 tis regar[1, please coate.ct this office.
g
.c Sincerely vours, A~
~
f 'E p_ _ g_,
s
- L[ T. Gucwa JAE/jf' j