VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT NO. 84-06 i

m.

STATION MANAGER

- i

)

R fh n s

f Section P_ age _

I Operating, Data Report - Unit #1 2

Operating Data Report - Unit #2 3

Unit Shutdowns and power Reductions - Unit #1 4

Unit Shutdowns and Power Reductions -Unit'#2 5

Load Reductions Due to Environmental Restrictions - Unit #1 6

Load Reductions Due to Environmental Restrictions - Unit #2 7

Average Daily Unit Power Level- Unit #1 8

Average Daily Unit Power Level- Unit #2 9,10 Summary of Operating Experience 11 Amendraents to Facility License or Technical Specifications Facility Changes Requiring NRC Approval 12 Facility Changes 'Ihat Did Not Require NRC Approval 13 Tests and Experiments Requi.-ing NRC Approval 14 Tests and Experiments 'Ihat Did Not Require NRC Approval 14 15 Other Changes, Tests and Experiments 16 Chemistry Report ,

Description of AllInstances Where Thermal Discharge Limits Were Exceeded 17 Fuel Handling 18,19 Procedure Revisists That Changed the Operating Mode Described in the FSAR 20 Description of Periodic Tests Which Were Not Complete #

Within the Time Limits Specified in Technical Specifications 21

- -~ - , ,

11 ,

Section M Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit #1 - Mechanical Maintenance 22-27 Maintenance of Safety Related Systems During Outage or 28,29 Reduced Power Periods - Unit #2 - Mechanical Maintenance Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit #1 - Electrical Maintenance 30, 31 Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit #2 - Electrical Maintenance 32, 3'1 Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit #1-Instrument Maintenance 34-36 Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit #2 -Instrument Maintenance 37,38 Health Physics Summary 39 Procedure Deviations reviewed by Station Nuclear Safety and Operating Committee after Time Limits Specified in T.S. 40

(

t O

l i

e

---.:,,--, -~ e- ,-, -. - -

m ,-, - m e,0.-, c.-m,n ,- - n-- +

ADM-49 ATTACHMENT S Page 1 of 3 OPERATING DATA REPORT FEB 0 21984 DOCKET NO. 50-280 DATE 7-06-84 COMPLETED BYV. Jones

< TELEPHONE 804-

, OPERATING STATUS 357-3184

1. Unit Name: Surry Unit 1 Notes
2. Reporting Period: 06-01-84 to 06-30-84
3. Licensed Thermal Power (MWt): 2441
4. Nameplate Rating (Grosa MWe): 847.5
5. Design Electrical Rating (Net MWe)
788
6. Maximum Dependable Capacity (Gross MWe): 8 11
7. Maximum Dependable Capacity (Net MWe): 775
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions If Any:

, This Month Yr.-to-Date Cummulative

11. Hours In Reporting Period 720.0 4367.0 101501.0
12. Number of Hours Reactor Was Critical 483.8 3240.7 62333.6
13. Reactor Reserve Shutdown Hours .0 9.3 3774.5'
14. Hours Generator On-Line 469.4 3180.8 61048.0
15. Unit Reserve Shutdown Hours 0 0 3736.2
16. Gross Thermal Energy Generated (MWE) 961359.1 7384017.8 142310322.1
17. Gross Electrical Energy Generated (MWE) -

305830.0 2384555.0 4570439R.0

18. Net Electrical Energy

. Generated (MWH) 287601.0 2262148.0 43339884.0

19. Unit Service Factor 65.2 % 72.8 % 60.2%
20. Unit Available Factor gs.9% 79 g% gtag

, 21. Unit Capacity Factor (Using MDC Net) s1.8% ss.8% s s .1 %

22. Unit Capacity Factor (Using DER Net) 50.7 % 85.7 % 54.2 % i
23. Unit Forced Rate 26.9 % 6.7% 9tL 2%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Snubber Inspection 03 10 Davs

25. If Shut Down At End Of Report Period Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (9/77)

Paga 2 ADM-49

' ' ATTACHMENT 5 Pcg3 1 or 3 OPERATING DATA REPORT FEB 0 21984 DOCKET NO. 50-281

? DATE 07-06-84 COMPLETED BY V. Jones TELEPHONE 804-357-OPERATING STATUS 3184

1. Unit Name: Surry Unit 2 - Notes .
2. Reporting Period: 06-01-84 to 06-30-84
3. Licensed Thermal Power (MWC): 2441
4. Nameplate Rating (Gross MWe): 847.5
5. Design Electrical Rating (Net MWe): 788
6. Maximum Dependable Capacity (Gross MWe): 811
7. Maximum Dependable Capacity (Net HWe): 775 l 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report Give Reasons:_ N/A ,
9. Power Level To Which Restricted. If Any (Net MWe):
10. Reasons For Restrictions, If Any:

{

This Month Yr.-to-Date Cummulative 4

11. Hours In Reporting Period 720.0 ,

4367.0 97895.0

12. Number of Hours Reactor Was Critical 720.0 3627.4 62198.3
13. Reactor Reserve Shutdown Hours .0 .0 328.1
14. Hours Generator On-Line 720.0 3578.9 61154.9
15. Unit Reserve Shutdown Hours 0 0 0
16. Grcss Thermal Energy Generated 1

(MWR) 1743647.3 8414637.0 143130509.9

17. Gross Electrical Energy

, Generated (MWH) 553540.0 9AR959n_n anana.17e n

18. Net Electrical Energy ,

j Generated (MWH) 524860.0 2548614.0' 44055874.0'-

19. Unit Service Factor 100.% 82.0 % s2.5%
20. Unit Available Factor 100.0 % 82.0 % 62.5 %

, 21. Unit Capacity Factor (Using MDC Nat) 94.1% 75.3 % 58.1 %

i 22. Unit Capacity Factor (Using DER Net) 92.5% 74.1% 57.1 %

23. Unit Forced Rate 0 18.1% 14.3%

, 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

Fall Maintenance 13 10 Days

25. If Shut Down At End Of Report Period Estimated Date of Startup:
26. Units In Test Status (Prior to Cosmarcial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (9/77)

l#0CKET No. 50-280 _

11 NIT Sil01180WNS AND FOWER REDUCTION!; Surry Unii 1 UNIT NAME

  • DATE Jul.y 5.1984 -

COMI'LETEI) Ily V. II. Jones .

Juna_ ten, 804-859-f;1 sin REPORT MONTil 1El.ErtlONE i .

'I u j -

- jg "r

Lkensee $g 74 Cause A Ctweective No., Date h

}Ij soc Event - p Acehm so .

=> ts l'eevent Recessence t- dg= &{ g g5 y iterms # j 84-6 06-01-84 S 78.1 B 1 Unit was sht tdown for scheduled snubber outage which commenced on 5-26-84.

84-7 06-13-84 F 172.5 A 3 84-015-00 Reactor trip caused by "A" S/G low level 84-016-00 due to the loss of 1-FW-P-1 A. 1-FW-P-1 A was repaired, but the unit was delayed from a Startup due to control rod B-6 being stuck at N60 steps. The unit was returned to service with the control rod in the stuck position, limiting power to 80% power.

t 3 4 1 2 Exhitell G . Instructions l Methe=l:

F: rosceJ ltesson: ro, riepsinthm ut D3:s A Equipmens Falluse(Espisin) 1-Manual *o 5: ScheduleJ Entsy Sheces foe i.leensee II. Maintenance of Test 2-Manoni Sessm.

3.Autonistic Screen. Event Repoet (LER) File (NUMEG- $

i C Refueling 4 Ollees (Espiskil 0161) [

' D Reguistmy Restilction E-Opeestor T sining A Ucense Emendnethm 5 F Adadalseestive Exhibit t . Same Sousee G.Opessilonal Earos (Esplein)

II Othes (Esplein)

I'l/77) e 4

e .

l>0CKET No. 50-2R1 ,

UNITS tU100WNS AND FOWER REtH)CTIONS UNIT NAME Surry Unit 2

.DATE . Inly 5: 19R4 -

COMrt_EM D p E H_ .Inna -

REPORT MON 111 inno- ion, 1ERIPHUNE 804-859-6150

- .g "t.

~

,]j $ Y 1.lcensce g4 k . Cause & Cosieceive Acii,m is, Ni.. .

D=ie E I-g a$ [

su.

, =, u jdi Eveni -

Repost #

p un t.s j

Q hevent Recussence o .

84-18 06-112-84 S 0.0 A 4 Unit was reduced to 64% power (490 MW's) to allow shutdown of.2-FW-P-1 A to repair teactor i leat Tot S/D I

P 3 4 I 2 Eshilitt G Insisucilons F: Fosced Ressim: Mellioil:

l-Manual foi riepsiselon of Dsis .o 5: Scisedaleil A.E gulpment Falluse(Esplain)

D Maintenance of Test ,2-Manusi Scism. Entsy Sleeces for i.leensee $m J.Aulumstic Scisen. Event Repues (l.ER) File (HUREG.

C. Refueling *

'0161)

D Regulatovy Restelcelim 44)elser (Esplain)

E-Oreestor T sining& Ucense Esaniinallem -

5 F.Ailministesilve Eslithis 1 Same Souice U-Opessitemsl Etsue (Espisin)

Il-OslierIEsplain) 4 r8/77)

Paga 5

  • 4 LOAD REDUCTIONS DUE TO ENVIRONMENTAL FISTRICTIONS UNIT NO.1 MONTH:

June,1984 LOAD, MW REDUCTIONS, MW MWH REASON DATE, THiE HOURS-None durity this r porting perio<L D

e i

I l

MONTELY TOTAL

s Paga 6 LOAD REDUCTIONS DUE TO ENVIRONMENTAL RESTRICTIONS UNIT NO.2 MONTE:

June.1984 t

TIME HOURS- LOAD, MW REDUCTIONS, MW MWH REASON DATE, None during this rep 6rting period, f

e a

m i

h I

o MONTHLY TOTAL

DOCKET 110 50-280 UNIT SURRY I EATE 7-1-84 CO'L*LETED BY ^ V. H. Jones AVERAGE DAILY UNIT POWER LEVEL MONTH: e5Ui!E i 84 AVERAGE DAILY POWER LEVEL AVERAGE DAILY P0kTR LEVEL DAY (mkt-NET) DAY (l&T-NET) 1 0.0 ' 16 0.0 2 0.0 17 0.0 3 0.0 18 0.0 4 212.3 19 0.0 5 660.6 20 19.4 6 745.2 21 276.0 7 741.3 22 549.1 8 744.0 23 576.5 9 743.4 24 578.3 10 741.4 25 577.0 11 740.2 26 575.0 12 739.4 27 576.0 13 475.9 28 574.1 14 0.0 29 570.2 15 0.0 30 568.3 DAILY UNIT PO:.TR LEVEL FOR4 INSTRUCTIONS ON THIS FORM, LIST THE AVERAGE DAILY UNIT POWER LEVEL IN mkt-NET FOR EACH DAY IN THE REPORTING M0i!TE. T9ESE FIGURES WILL BE USED TO PLOT A GRAPH FOR EACU REPORT-ING MONTH. NOTE THAT BY USING K4XIWii DEPENDABLE CA?ACITY FOR THE NET ELECTRICAL RATING OF THE UNIT. THERE MAY EE CCCASIONS k7?EN THE DAILY Ab? RAGE PokTR EXCEEDS THE 130 */* LINE 'OR THE I?ESTRICTED ?OWER LELTL LINE). IN SUCH CASES. THE ATTRAGE DAILY UNIT P0hTR CUTPUT SHEET SHOULD BE FOOTNOTED TO EX? LAIN THE APPARENT ANCHALY.

Paga 8 DOCKET NO 50-281 UNIT SURRY II DATE 7-1-84 COk?LETED BY V. H. Jones AVERAGE DAILY UNIT POWER LEVEL

!DNTH: JUNE 64 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (AVE-UST) a47 (AVE-NET) 1 742.5 16 729.4 2 740.3 17 730.4 3 731.7 18 730.7 4 732.3 19 723.1 5 733.7 20 724.0 6 735.7 21 721.4 7 733.6 22 726.2 8 736.3 23 720.0 S 734.9 24 729.8 10 732.9 25 731.4 11 728.9 26 726.4 12 722.2 27 733.0 13 677.2 28 734.9 14 729.9 29 733.0 15 731.7 30 731.9

. DAILY UNIT POWER LEVEL FORM INSTRUCTIONS ON THIS ECRM. LIST THE AVERAGE DAILY UNIT POWER LEVEL IN WWE-NET FOR EACH DAY IN THE REPORTING MONTH. THESE FIGURES WILL BE USED TO PLOT A GRAPH FOR EACH REPORT-

'ING LDNTH. NOTE' THAT BY USING MAXIMUM DEPENL14B[E CAPACITY FOR THE NET ELECTRICAL RATING OF THE UNIT, THERE NAY 25 OCCASIONS VHEN THE DAILY AVERAGE POWER EXCEEM THE 100 */* LINE 'OR THE REST?ICTED POWER LEVEL LINE). IN SUCH CASES. THE AVERAGE EAILY UNIT POWER OUTPUT SHEET SHOULD BE FOOTNOTED TO EXPLAIN TEE APPAFENT ANob'ALY.

s

' ~ ~ PIga 9 TUMMARY OF OPERATING EXPERIENCE

. Jun2,1984 Listed below in chronological sequence by unit is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.

T Unit 1 06-01-84 0000 This reporting period begins with the RCS < 200'F, preparing to fill and vent primary 06-01-84 2 011 Commenced fill and vent of RCS 2 313 Completed fill and vent 06-02-84 1205 Bubble established in pressurizer 4 06-03-84 0410 RCS > 200'F 0258 RCS > 350*F / 450 psig 2359 RCS at HSD 06-04-84 0126 Reactor Critical 0606 Main generator on the line increasing load at 3% / hour 06-05-84 1310 Unit at 100% power (790 mw's) 06-13-84 1530 Reactor trip caused by "A" S/G low level due to loss of 1-F W-P-1 A.

06-14-84 1126 While attempting to take reactor critical found control rod B-6 apparently stuck at ~30 steps -

2155 Control rod B-6 pulled to 228 steps 2345 Control rod B-6 tripped, rod stopped at 60 steps and rod will not move in either direction 06-16-84 1204 Commenced cooldown to try and free up control rod B-6 1748 RCS < 350 / 450 psig 06-17-84 0420 RCS at 250'F, control rod B-6 still will not move, commence RCS heatup 1712 RCS > 350*F / 450 psig I

i

- - . - . , - - . , . - ,, , , . . , - ~ - ,

Wag 21B

SUMMARY

OF OPERATING EXPERIENCE JUNE,1984 Listed below in chronological sequence by unit is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.

Unit 1 ,

2122 RCS at HSD commenced Rod drop testing, all rods except B-6,tes.ted satisfactorily.

06-19-84 0209 Reactor critical.

0414 Reactor trip by turoine trip, NI's exceeded 10%

power without turbine being latched causing trip signal.

06-20-84 1442 Reactor critical 2002 Main generator on the line, increasing power at 3%/hr.

i 2050 Holding at 29% power (160 mw's) while performing flux maps.

06-21-84 0234 Commenced 3%/hr power increase.

1130 Holding at 50% power (325 mw's) while performing flux maps.

1547 Commenced 3% / hr power increase.

1920 Holding at 60% power (400 mw's) while performing flux maps.

2130 Commenced 3% / hr. power increase.

06-22-84 0100 Holding at 70% power (510 mw's) while performing flux maps.

0310 Commenced 3%/hr. power increase.

0690 Holding at 80% power (609 mw's).

06-30-84 2400 This reporting ends with the unit at 80% power (610 mw's).

Unit 2 06-01-84 0000 This reporting period begins with t'he unit at 100% power (780 mw's).

06-12-84 2235 Commenced load reduction to repair oilleak on 2-FW-P-1 A.

06-13-84 0020 Holding at 64% power (490 mw's) to work 2-FW-P-1A 0310 Completed repairs to 2-FW-P-1 A, commenced power ,

increase. l 0632 Unit at 100% power (780 mw's). i 06-30-b4 2400 This reporting period ends with the unit at 100% power j (775 mw's).

Paga 11 AMENDMENTS TO FACILITY LICENSE OR TECHNICAL SPECIFICATIONS June,1984 i None during this reporting period.

  1. e a f

i a

D 1

a i

l I

r i I

l

P gs 12 l FACIIJrY CHANGES REQUIRING NRC APPROVAL June,1984

?

Nonc during this reporting period.

O e

a e

. = - -

Paga 13 4

1 FACHJrY CHANGES THAT DID NOT REQUIRE NRC APPROVAL

?

i JUNE,1984 1,

UNrr DC 93-10 Secondary Sample Sink Relocation 2 This design change relocated the Secondary Sample Sink and associated piping and instrumentation. This will allow construction of the new Charging Pump Service Water Pump Cubicle adjoining the existing Mechanical Equipment Room # 3.

Summarv of Safety Analysis The modification does not affect normal station operation or the operation of any safety-related equipment or systems.

I 4

Pege 14 TESTS AND EXPERIMENTS REQUIRING NRC APPROVAL June,1984 None during this reporting period.

TESTS AND EXPhRIMENTS THAT DID NOT REQUIRE NRC APPROVAL June,1984 None during this reporting period.

e e

Paga 15 OTHER CHANGES, TESTS AND EXPERIMENTS June,1984 l

? None during this reporting period.

1 I

i .

l 4

e f

k

Pega 16

.~

VIRGINIA ELECTRIC AND POh*ER COMPANY SURRY POWER STATION l CHEMISTRY REPORT T

June 19 84 i

T.S. 6.6.3.d I COO N UNIT NO. 1 UNIT NO. 2 ANALYSIS MAXIMUM MINIMUM AVERAGE M.7.XIMUM MINIMUM AVERAGE

-2 ~ -1 -2 -2 Gross Radioact.. uCi/ml 1.97* 5.84 9.32 1.09 4.66 7.09 Suspended Solids, pom 0.00 0.00 0.00 0.00 0.00 0.00 Gross Tritium, uCi/mi 2.13

-1 1.54

-2 7.11

-2 2.35

-1 2.57

-2 1,79-1

-2 ~4 Iodine 131, uCi/ml IAI 1.18* 1.41 2.03"I 6.20

~4 1.19~4 2.12 I

131 77 133 O.36 0.17 0.29 0.39 0.06 0.19 (A)

Hvdrogen, ec/kc .

35.9 19.3 27.7 39.8 25.0 31.4 (B)

Lithium, Opm 2.10 0.71 1.15 1.21 1.00 1.10 Boron-10, com* 276 34 118 111 104 98 i

. Oxygen, (D.O.),pom s0.005 s0.005 s 0.005 s0.005 50.005 $0.005 Chloride, ppm 50.02 50.02 Is0.02 s0.02 50.02 50.02 pH 9 25*C 7.15 6.16 6.81 6.79 6.47 6.67

  • Boron-10 = Total Boron x 0.196 s NON-RADIOACTIVE CHEMICAL (C) i RELEASES, POUNDS ,

T.S. 4.13.A.6 1

Phosphate -'

Boron. 248 I 0.0 Sulfate Chromate l 50% NaOH -

Chlorine -

REMARKS: (A) Unit 1 off line from 6-1 to 6-4, fran 6-13 to 6-20 (B) Lithitan additions-Unit 1: 2880 qms. 6-2; 68 cms. 6-4; 760 ams. 6-5; 260 ams. 6-6; 505 ans. 6-14; 805 ams.

6-15; 1290 gms. 6-16; 435 ams. 6-17; 405 cans. 6-18; 250 ams. 6-19; 245 cans. 6-20; 145 csns.

~ 6-21; 475 ams. 6-22; 210 ans. 6-27; Unit 2: 130 cans. 6-13. Cation bed in service Unit 2 6-6 & 6-26. (C) 'Ihe levels of tbama charnicain shon1 A create no adverse env1101-.----J m1 ine- -

! Dact.

1

.- .. __ , - . - - ~ _ _ _ _ _ _ _ . _ .. _ _ _ ._ _ _ _ _ i

& .4- ..J..J f

f Pag 217 DESCRIPTION OFALL INSTANCES WHERE

, THERMAL DISCHARGE LIMITS WERE EXCEEDED June,1984 None during this reporting period.

$*e O 9

)

/

w e

Y ea O

~

/ \

/

./

r I

/

/ ,

5 f

, 4  ;

r 4

  • ' y :j _ _

f .) s

+

f.e 4

l 2

l 7

l '

~

.. ./

, .I'?" # y

,.? 1<

q , y l 1

,5 4 ', j ,"

,;  ;, a -

j

.~ ' .- , , . .

1 Y

h s

["

W

, - - - . , , [,

  • 1*e- - , # - - , , - - _ , - , , _ _ , - . . . _ , . , . _

~

l Page 18 l

. , . MEL FANDLING UNIT # 1 June,1984 DATE NO. , OF , ANSI NO. NEW OR SPENT FUEL HIPPED / RECEIVED

%SSEMBLIES PER SHIPMENT INITIAL ENRICHMENT SHIPPING CASK ACTIVITY LEVE:

06-09-84 14 2E6 / 3.6% <2.5 mr/hr OR-00-R4 14 1ER / 3.8% <0 5 mP/ha 06-09-84 14 1E7 / 3.6% <?.5 mr/hr 1 06-09-84 14 2E3 / 3.6% < 2.5 mr/hr 06-09-84 14 IED / 3.6% <2.5 mr/hr 06-09-84 ta 1E6 / 3.6% <2.5 mr/hr 06-09-84 14 2E4 / 3.6% '<2.5 mr/hr ne nn g 14 1E4 / 3.6% <2.5 mr/hr .

06-09-84 14 3E0 / 3.6% <2.5 mr/hr 06-09-84 14 SEO / 3.6% <2.5 mr/hr 06-09-84 14 SE6 / 3.6% <2.5 mr/hr 06-09-84 14 4E8 / 3.6% <2.5 mr/hr 06-09-84 14 3E4 / 3.6% <2.5 mr/hr 06-09-84 14 1El / 3.6% . <2.5 mr/hr

Page 19 FUEL HANDLING UNIT 4 2 June,1984 DATE NO. OF ANSI NO. NEW OR SPENT FUEL

HIPPED / RECEIVED ASSEMBLIES PER SHIPMENT INITIAL ENRICHMENT SHIPPING CASK ACTIVITY LEVEL c

None during this reporting period.

m 1

l l

l l

Paga 20

, PROCEDURE REVEIONS THAT CHANGED THE OPERATING MODE DESCRIBED IN THE PSAR June,1984 Number Unit , Title Date TIMP-C-RC-88 1 Temporary Maintenance Procedure for Placing 06-29-84 (New)

F-1-434 and F-1-436 in a Safe Condition while performing Mainte, nance on F-1-435 9

J l

'T e

w - -- -- - - - - - - -

-w <m,-ge --

m,

Pago 21 DESCRIPTION OF PERIODIC TESTS WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS I

-- June,1984 NONE DURING THIS REPORTING PERIOD.

p 4

A

Paga 22 t

e l

MAINTENANCE OF SAFETY RELATED SYSTEMS DURING OUTAGE OR REDUCED POWER PERIODS UNIT NO.1 MECHANICAL MAINTENANCE i

e

--- + , - - - . , .- -- . . . _ . . , , _ , __ ,, ,

-**, . .- ~.. . . . . _ _ . , . . .

g TUESDAT. 3 JUf. 8%

  • 12s5% PM PACE 3 4T Lal2 .

i lj [' ~

- MAINTENANCE Of SAFETT RELATED S! STEMS DURINC QUTACE OR REDUCED POWER PERIODS UNITS t

'k DEPTs MECH lg RETSERVDT STS COMP NARKNO SUNHART

.I

,1

' ' f, : 1 VKPERf MR

, l 06/01/8% SE VA LVE 1 -SI-RCV- 18 508 REPAIR 80D1 TO BOMMET LEAK Il Y

N0%t9083%

PESSAMRE.ED VALVE AND REPL ACED I

. . . . . fl f  !

c.i I' b bI 0

06/01/8% SE ' h i. VE t-SE-153 STANCREON INTERFERES VITR OPER bT VL f' T' REPLACED VALVE OPERATOR RA TCHET 3033115%0 t$

06/01/8% CR TLANCE t-CR-3GG .TEPt. ACE FLANCE . . -. . . _ . - .

l CLEANED AND INSTAL.t.ED MEV CASKET %030%2319 06/01/84 ST VA L VE 1 -SI- VI V- 3 % 1 PACKINC LEAK

( ADJUSTED PACKING %05260%01 l.

( ,, 0G/01/8% St VA LVE t - SN - VE. V- 3 3 9 PACKING LEAK

- ADJUSTED PACKING %05260%08 .. -.

0G/01/8% RC val VE i - RC- VL V- 5 6 FACKING LEAK

(. l; A DJUSTED PACKING %052G0%09 ,

06/01/8% TV VA L VE 1 - FV-RCV-15 5C VA LVE LEAKS Bt . . . . - - . .

,' I ENSPECTED VAI.VE /f M C00D MECR AM: CAL %0526010G 80DF TO BONNET f,KAK ',

I'+ 06/01/8% SI VI,V t -ST - VE. V- 1 % 7

REPLACEO CASKET %052Go%15 .

0s/01/8% RC VA LVE 1 - RC- VL V- 11 PACKENG LEAK

( :* AD.!USTED PACKING %05260%to Fil.t. COMMON RESERVOIR

  • t 06/01/8% RC' SNUR!iER t-RC-RSS-tSO . . - . . .

I TECRTENED TITT2NC+Fil. LEO RESERV0ER N05291910 L' 06/02/8% RC SMUBRER t-RC-RSS-1To MEASURE FLUID LEVEL '

i, RESERVOIR LEVEL VAS AT 100 PERCENT %05251302 . . .

SNUBRER 1- RC-RSS-tGG NEASURE RESERV0IR LEVEL

.l' 06/02/8% RC RESERV0ER LEVEL VAS AT 80 PERCENT n0525130% e ll 06/02/8% RC .SNUBRER t-RC RS-ts2 MEASURE FLUZD LEVEL . .

, , RESERVOIR LEVEL VAS AT 100 PERCENT n'05251303

  • t-l, osjngjgn pg Syyyngg g.py.RSS-10 FEI.L SMURBER TO 100 PERCENT LEVEL ,,

Tit.E.KD RESERV0IR TO 100 PERCENT %0530010G *I I* 0G/02/8% Ry 'SMUBBER t-RR-RSS-21 REORIENTATE RESER"0IR RECRER

%05300102 l L'-l** REORIENTATED RESERV01R 06/02/8% RR SNUBRER 1-RR-RSS-t CLEAN SRAFT

  • REMOVE ACIO

'a~'

+ CLEANED ACED FRunt SRAFT %05300101 G l. . '

06/02/8% RSS SNURRER PS-MSS-11 A leTSSENC COTTER PIN  % '

$l s' ' PUT COTTER FIN BA CK IN BOLT N05300100 t

. s: 06/02/8% RC SMUORER t-RC-RSS-1GT TILL RESERVOIR TECRTEN FITTENCS *i.

L',' FILLED RESERVOIR *TICHTENED TITTINC %05291915 y 06/02/8% RC SNUBBER 1-RC-RSS-L5% TILL COMMON RESERVOIR e:

V ,

J  ? ".

oo

f .

~

  • ~ '

~ TUESDAT. 3 JUI S%'*~ 5 20% ~PN ~ ~P'ECE V *V YN . 'l d MlEETERANCE Of SAFETE RELATED STSTEMS DURIEC OUTAGE OR REDUCED POVER PERIODS . . .

l* Un!Ts t

  • ll*\

,l

  • DEPTs MECM

~

RETSERVOT STS COMP NARERO SUN!!A RT '%

f MR l VKPERf

  • I TICRTERED TITTERC*TELLED RESERVOIR %05291911 TECRTEE f!TTERC

'l3

'g 0G/02/8% SE SNUBBER t-SI-RSS-26

~

TECHTENED FITTI#C . .%05300110 . -. . . ._. .

'i SRUSRER 1-RC-RSS-t%8 YETTEEC LEAK / RILL RESERVOIR ,-%

'l 06/02/8% RC 6052nt902 TICRTENED FITTERC+ Filled RESERVOIR t; OG/02/8% RC SNUBBER t-RC-RSS-t%1 TETTERC LEAE/ FILL RESERV0IR. .- - -. - 14 TECRTEMED TITTENC* TILLED RESERV0IR %05281903 ;i 9 S' 0G/02/8% RC SMURSER t-RC-RSS-138 flTTERG LEAK /f!LL RESEKV0ER .

. I'

.TECRTERED FITTERCS* TILLED RESERVOIR '805281905 l

OG/02/8% RSS SEURBER t-RSS-VAPDt%3A PUT OE I.0CE VASMER OR COTTER PER 89

' I g PUT JAM NUT OR ROLT %05281906 t*

06/02/8% RC SEUBDER t-RC RSS-1%$ PACKINC LEAEfflLL RESERVOIR ... -.. .. . . - - - .. s' f;

%C528190t 9 V 'lr TECRTERED TITTINC SMUBBER t-Ril-RSS-10% FILL RESERVOIR TECRTER FITTERCS

  • l' 06/02/8% Ril
  • 1 TICRTEMED flTTERCS+ FILE.ED RESERVOIR %052919t% _ . . . . . , . . . . . _ . . . - - . _ . . - . . . , ... .

SEUBRER t-RC-RSS-158 TELL COMMON RESERV0 IRS T $

O t>/ 0 2/ 8 % RC TICRTEMED FITTENC* TILLED RESERVOIR %0529t912 *l9

,) 06/02/8% RSS SWIIRRER t-RSS-VCCR-02 FELL SRURBER.RESERV0IR TO 90.FERCERT.. . . . !l FELLED RESERVOIR TO 90 PERCENT %05300112 st9 l PACKERG LEAK ADJUST / REPLACE PACKINC

$ 0G/03/8% CR VA L VE 1 -CR TV-120% r e

A DJUSTE: PACKERC .. . . - ...

%05230550, . , . . . . . . . _ . . . . . . . .. _ ..... . . .

. . }.. is

, ll OG/03/8% EE COMPRESS t-EE-C-t CONTRESSOR TREPPED/0VERilEATED f ;to l'

INSTALLED MEV YlLTER AND RD CASKETS %05300115 06/03/8% RR VA LVE t- AR-MOV-1100 REPACK VA L VE . . - . . . _ . . . . 'f*

  • n.

g REMOVED 9 RINGS PACEERC REPLACED %05300838 8

s illI 0G/0%/8% CR VA L VC t-CR 300 REPACK VALVE i .

  • l'%

I ,l REPACKED VALVE %05230922 I

L -

  • l*%

( OG/0%/8% CR VA L VE t-CR-29% REPACK VALVE s I! REPACKED VALVE %05230930 .. - . . . .. ._ .. m._

t-CR-291 REPACK VA LVE

  • 0G/0%/8% CR VA L VE

%05230921 E

]i*

REPACKED VALVE 06/0%/8% RC VA L VE t-RC VLV-89 PACKERG LEAK j

l lI ' REPl.A CED PACKING %052GO%1G t'*

06/0%/8% Cf! VALVE 1-CR-112 DIAPRRAM SEPERATED ';

L'l}f, TOUND DROKER STEM REPLACED %D52%1%35 .

06/06/8% CC VA LVE t-CC-815 10 TLOV ORTAINED THROUCR VA LVE iM L*l' CUT ORAlp LINE !!NSTOPPED REMAIMERC %C30503%% d 1-31-19%0 T!.A RCE I.EAK l} 0G/0%/8% S1 PEPEERC REPl. ACED CASKETS *TICHTERED

%05230551 & e, *

%'fl s 06/0%/8% CR MOV t -CR -!!0 V- 1310 PACK!MC AND F0DT TO CONNET LEAK M 4 * *l REPLACED PACK!NC AND TLERATALLEC 0032G150% S 3 l.

J - e b

O .

TUESDAT. 3 JUL 84

  • 12s5% PN PACE 5 */'

t

,]?*!

MAINTENANCE OF SAFETT RELATED STSTEMS DURINC OUTAGE OR REDUCED POWER PERE 003. . *

Ol UNITS 1 '
  • '; l DEPTs MECR

! NA RK NO SUMMA RT .

" *g- RETSERVOT SV3 CONP NR

'WKTERY l 'l SNUBRER ' 1-RR-RSS-2 2 MESSENC SNAP RENCS/ COTTER PENS .41 05/0%/8% RR 405311050 O FUT COTTER Pl# RACK IN ... . . . . . . . - . . . .

06/0%/8% RR SNUBBER t-RR-RSS-21 FELL TO 90. PERCENT. TLUID LEVEE .___ _ .  ;

l5 %053t1051 *

.. FrLL =0 PERCENT 06/0%/8% RII SMUBBER t-RR-RSS-105 TECHTER FITTENCS/TILL TO 90 PERCENT l VII %05311052 .. .. . . . . . . . . -

!!LL AND TICRTENED WETTING 06/0%/8% !!SS SNURRER t-RSS-SRP-3G %06010039 ffLL RESERVOIR TICRTER FITTING ll t O;,), ifLLED RESERVOIR *TICRTENED TITTINC ..

'. 0G/0%/8% RC SMUBBER t-RC-RSS-110 TILL RESERVOIR.T0 80. PERCENT. . - .........

1 A DDEDED FLUID TO RESERV0IR 605111331 h O l *' 06/0%/n% RC SNUBBER t-RC-RSS-112 FELL RESERVOIR TO 80 PERCENT . ..

TILL 80 FERCENT %O5311340 . .

OG/0%/n% SE SNUMBER 1-SI-RSS-85 TELL RESERVOIR /TECRTEN TITTINGS l 'I D TILLED RESERVOIR *TICMTENED FITTENCS 606010038

.l l1 TELL TO 90 PERCENT TLUID LEVEL....- . .

OG/0%/8% kC SNUMBER t-RC-RSS-103 TELLED RESERVOIR 70 90 PERCENT %D5311053 l O*, 0G/0%/8% RC SNUMBER t-RC-RSS-101 FITTING TO VALVE Bl.0CK LEAKS.- - . . . . . .,

FILL AND rrCnrENED r1TTING %053t10$%. .

~O.s g,

06/0%/8% RC .SNURBER t - RC-RSS-10 2 % 053 TELL AND TECitTENED TITTINC TLUID LEAKING FROM A DJUSTENC SCREW t1055 . . ' *. .

l'I 0G/0%/8% RC SMUBRER 1-RC-RSS-1%1 PACKING. LEAK /REPACE. VALVE _.

.I

b. ADJUSTED PACKINC %053tt33G
J 06/0%/8% RC SNURBER t-RC-RSS-tT2 TUBING TEE LEAKIRC REPAIJt REPLACE Ot %05311335 . - . - . . . -

TECl!TENED TITTINCS

(,1 I. 1 -CV-NO V- 10 0D LEVER WILL NOT DESENCUAGE 06/0%/8% CW VA L VE 605218000 I'.. TESTED TIME ._... . *

  • OG/0%/n% RC SNUBBER 1-RC-RSS-1%2, PETTING t.EAK/TELL. RESERV0IR ......

TICRTEMED TITTINC %0528190% :I 1 f*I- 06/0%/n% ST SNUMBER ' SI-RSS.-223

-  !![L TO 90 PERCENT ;l rist.ED RESERiot R .

405311805 .

... g s-

' OG/09/n% nC SMURRER t-RC-RSS-115 FILL RESERVOIR TO 80 PERCENT h1

(**,

  • TIET. 80 PERCENT 405311338 -,

. l ':

0G/04/8% RSS SNURRER t-RSS-SRP-38 . %05282255 REPLACE RESERV0ER 0 RING /TILL. .

CRECK ORENC ADDED FLUID

(>l. 0G/0%/8% RSS SNUBBER t-RSS-VTPD-8 RERU11.0 OR REPLACE SNUBBER -

I' REPLACED 2 t/2 NULLER SNURRER WITH %0528225% .

l *.

i; OG/0%/n% MSS SNUBBER t ~RSS-WAPDt%30 PUT LOCK WASHER OR COTTER PEN ON

%05281909 L'l'el PUT JAlt MUT OR BOLT 06/0%/8% EE VA LVE 1-EE VLV~33 REPLACE LOCKING NUT . . . . .

  • TECitTENED LOCKNUT

%05291224 .

O ti 05/0%/8% RC SNUBBER t-RC-RS'-11% S FELL RESERV0ER TO 80 PERCENT

%053tt339 n3

  • WE$<

TILLRD RESERVOIR 80 PERCENT val,VE LEAKS BT REPAIR t-WW-%%

l' , i ll 06/05/8% TV REPLACED VALVE VA LVE 405t90%50 REPLACE VALVE / LEAKS 81

$ll w,

on t 06/05/8% EE VA LVE 1 EC-21 t:

. U

, p o

w-. . - - - _ - _ _ .

I '

~

TUESDAT, 3 JUL 8%

  • 52s5% Sk PAGE G ' ,y it j '

~

& MAluTEsAnCE Or SArETr RELATtD SISTEMS DUR!aC OUTAGE.OR REDUCED E0VER.PER10DS .. . .

usfrs t (l- DEPTs MECH RETSERVDT STS COMP MA REN0 StHtMA RT )

Cll, WKPERY MR 1 i *I

$.l JMSTAl. LED PIPE CAP BACK OE VLV. %05t10100 SEC090 ART MARVA T LEAKS

')

06/05/8% RC MA EVA T t-RC-E-1B REPA!RTO LEAK R1 VELD REPA!R .%05120935 , . . . - .. _. . ..

i OG/05/8% CS VA LVE t-CS-120 VALVE LEAKS BT SEAT BADLT

  • l' 't '

LAPPED SEATERC SURTACE 07 DESC 0G/05/8% CR VA T.VE 1-CR-292 312112238 PACKINC f.EAK A DJUST/ REPLACE. . . . _. .. . . - . - ll i ADJUSTED PACKING 605230558 g ,

. _._ . . . . _ . . . . . . .. . . Is g

e 06/13/8% CR VA L VE 5 :CR- VL V- 10 3 REPLACE DEAPRRAM sI. l')

C ;*t t REPLACED DEAPRRACM %05260830 '

l' . 05/13/8% CS VA L VE t-CS-02 ADJUST. PACKING AED CLEA W. BA.. DEBRIS . .._. . - . . . , . . .

l A DJUSTED PACKlWC AWD CLE ARED %0G01151% .

.g )

f +* 05/13/8% TV PUMP t-TV-P-2A TECRTER PACK!RC OR REPACK t

-l ADJUSTED PACKl#C. _ . _ . . _ . . . . . . . 40G0%1453. _ . . . . .

65/13/8% MS VA LVE t MS-PCV-t02R VALVE LEAKS TRRU \;)

i REPLACED CASKET n0G011801 ^*

06/13/8% CC VA L VE . t-CC-132 LEAKINC VALVE ADJUST.- .. ... .. . . .

ADJUSTED PACKERC %060G0805 f OG/13/8% MS VA L VE REPLACED CASKETS . . . .. . . . .

t-MS-PCV-102A VA LVE t.EAKS TRRU

. . . %0G011800 l}

1 06/15/8% MS VA L VE 1-MS-1 REPACK VA L VE l*1 f EWSTAT.T.EO P!PE CAP %0GO%t500 I hI 06/15/8% CS VA LVE t-CS-5 REPACE VALVE . . . . . . .. . . . . . . _ . . . _ . . _ _ . _

6060%150G l k ADJUSTED PACK!MC ,l 1 N 05/15/8% CS VA L VE t-CS-03 ADJUST PACK!MC CLEAR DEBRES

%QG011155 . _ . ;o ADJUSTED PACKINC .

,l 06/ts/8% CS VA LVR t-CS-06 ADJUST PACKING CLEAR DEBRIS ji %

C ADJUSTED PACKl#C %0G01115G

3. . . _ _ . . . . . . . . . . . _ .

I ~

0G/18/8% TP PEPE N/A ELROW LEAKS e AERUAL TEST OF TERE SES CONDUCTED 312050119 . . . . - . . . _ _ . . . _ . . . . ._ . ._

06/18/8% CR VALVE t-CR-2 PACKERC LEAK  :'. lp 4, 406090202 V(f ADJUSTED PACKlWC CG/ts/8% !.V VA T.VE t-LV-2G3 . VALVE VERE HARD TO OPERATE -

Ii ef 2

%05310100 g.i CHANCED OUT DIA LOV TLulD LEVEL-REf!LL e n%

, 0G/20/8% RSS SRUBnER 1-RSS-SRP-31 5

, fil. LED RESERVOIR 70 100 PERCENT %0GtG09tG . . . . . . - . -

i

? 05/20/8% RSS SMUDRER t-RSS-SRP-11 LOV TLUED LEVEL Hb

  • f T!!. LED RESERVOIR TO 100 PERCENT %DG1G0911 MI t ,f 06/20/8% TV VA E.VE INSPECTED TOURD LIMITORQUE SAT t-TV-MOV-t%tO REPA TR/ REPLACE CEAR ASSEMBLT

%CGt91135 *l' -

t 06/21/86 Si VALVE 1-SI-MO V-18 61.9 EXCESSIVE VA T.VE STEM I.CAKOFT

%QGtG1555 h.

t ADJUSTED PACKINC eM

]

.o g.

~ _ . -- --

a. i

. +

TUESDAT, 3 JUL 8%

  • 12s5% PM PACE 1 ,

, I. '

,i, MAIRTEMARCE Of SAFETT RELA TED SYSTEMS DUR!EC OUTACE OR REDUCED POWER PERIODS +

'd* UNifs 1 ,

  • R DEPTs MECH

' 'e ' .- - . - - -. . _ .. .. .. . . . . . . .

RETSERVDT STS COMP MA RKRO SUMMART 4 x

WKPERf MR

. ., i 06/21/8% CS VA LVE t -CS -MO V- 101 C FLANCE LEAKS  %

D ,* TORQUED AND ADJ STUD TOR FULL 6061%0920

3G/21/8% CS VA L VE 1-CS-92 ADJ. PACKERC - -. -. ... -

A DJUSTED PACKERC AND CLEANED %0G11183% . ,:

"'I, 06/21/8% CS VA LVE 1-CS-103C TECHTER LELET TLANCE 3 TECHTENED AND CLEAWED FLARCE 40Gt11831 . . . . . .

f.t a '

"D 06/21/8% FW PUMP t-FW-P-3A FITTIMC LEAK TICRTER/ REPLACE _ . _ . . . .. . .

TECnTERED SVACELOCK FITTINGS %060%tSUS ,

Q-e.g I'

06/12/8% FW - VA L VE 1-FW P-38 FITTING LEAKS .l

    • TECRTEMED SWACELOCK FITTERCS %050%1%51 11>

06/21/8% MS VA L VE t-MS-15 A DJ. PACKIRC.CLAED.....- .. - ...- . .. .

,s l

REPLACED RUT ADJUSTED PACKlWC 60G111833 '

6' OG/21/8% CS VA L VE t-CS-GG P!PE CAP LEArlMC  ;%

REMOVED BORIC ACID AND %0Gt%132G - . . . . . . -. -- g I

06/23/8% SW PUNP REPLACED MECH SEAL t-SV-P-10D SEAL LEAK

%02101346 -

')

l

, 06/2G/8% CS SUPORT 1-CS-P-1B EUTS ARE IMPROPERL1 TORQUED -- - . - - .. . *j TORQUE SUPPORT NTS 305101G01 C' OG/26/8% CR VA LVE MOV-128%A BOLT TO BONNET LEAK g',D TECHTERED PLA ECE 30G201259 . . . . . ,,

06/26/8% BS FRDR 20 TERE D0OR 20 LEAKS  :

6 ,

INSTALLED WEA THER STRIPPENC 06/21/8% CS VA L VE 30G200210 1 - CS -MO V- 10 t D VA LVE LEAEINC. AT.fLANCE . . . - - - , ..

  • l&

t TORQUED TLANCE BOLTS 70 215 %06250901 6

06/21/8% TV VA LVE t-TV-61 ROOT TO 8000ET LEAK FURMARITE )

. IRJECTED R001 TO BOERET LEAK VITN %0612085G . . - . . .. , ii

+ -t 06/21/8% MS VA L VE t-MS-10% RODT TO BORNET LEAK h

(* IRJECTED B001 TO 90ERET LEAK WITH %06091500 s l'D 06/21/8% VS FA # 1-VS-F-39 055200 . .. _ . . . . .

It ADJUSTED BELT %0Gt01006

$*' 06/11/8% TP TR OR t-FP-28 000R CLOS'ER ARM LOOSE tfL

  • TTCRTERED SCREFS %06192301 .

I- T g

a

(.'l:. s. "a

..o

m. ' .

'O 9 l f

0'ei

Paga 28 e

MAINTENANCE OF SAFETY RELATED SYSTEMS DURING OUTAGE OR REDUCED POWER PERIODS UNIT NO. 2 MECHANICAL MAINTENANCE 4

i D

i I

S

. ~ - . . .. . .. .- - .- - - - -.

T&ESDAF. 3 JUL St.-. * . . .12:54 PN PACE 14. . . . . . . _. .

'3

. ,. + e

. . I NAIRTERAnCE OF SAFETT REleTED 31 STEMS DURERC CUTAGE OR.REDVCED E0VER fBRE003 . . . .. .I

?! valTe 2

  • l '

i DEPTs NFCR  ?

RETSERvDT - STS COMP NARERO SONNA RT -

6 p

WEPERf MR

. . . ~. . . . . . . . . . . .. . . . . .g

- l' i es/13/94 TP ERTIRCUE 2-FF-ERT-151 ERSTALL TERE ERTERCUISHER BRACEKT '

1 INSTALLEO FIRE BOTTLE REACEET 40G011203 )

. ll

) .

I

, .I - l- g i

g A '

. ~g i

Sl

. 'e..

gI i

. . l, lI . .

-.. . _ . _ . . . .t

t. '.'

e e l- ,

)'

i . ... . __ .._.__.. ..__ _ .. __ . .. _ . . . . . . . . . ,

I

! 1

' ll . L )-

} v )

's n , .)<

i i, .

t t '

t g9

' *l 'T,

{

- ~ -

I. .

h

. g l* "N

. .. .- e lh 'i V

ll ef

l er
i. i 1

~ --

1 P ga 30 l

. 1 O

s.

M MAINTENANCE OF SAFETY RELATED SYSTEMS DURING OUTAGE OR REDUCED POWER PERIODS UNIT NO.1 ELECTRICAL MAINTENANCE l I

e e

b w - -- .,c - - , , - . . , - ,.,m- ,

~

TUESDAF. 3 JUL 8% 4 12:5% PM PACE 8 , ,

I. ; . i MAINTERANCE 07 SAFETT RELATED 31 STEMS DURERG OUTAGE OR REDUCED POWER. PERIODS. ... . . . .

l' '

UNITS t DEPTs ELEC RETSERVDT STS COMP NA RERO SUMMA RT

  • VKPERT NR . , ,y 0G/01/8% RC RELAT 33%BV510 RELAT FOURD ENERCIZED REPLACED STEM SF SVITCR 311301%00 OG/01/86 SV .BATT. .,t-SV-f-SC. CLEAR BA TTERIES_u -. . - . - , . . . _ . . . , _ . . . .

s CLEARED BA TTEREES %05210105 0G/01/8% CR VA LVE t-CR-M09-1291C CRECK TORQUE SWITCR ,

VA LVE FREED DP CICLED .. . . %05301822 . _ . _ _ _ __-

06/01/8% St VALVE 1-SE-RCV-18503 ELEC DISC 0nR*RECOME VLV TOR MAINT

  • %0%2G1231 DESC0EEECT*RECORRECT ATTER NAIRT 0G/02/8% SE . VA L VE 1-SI-RCV-18 53C SOLER0LD BLOVERC.81 '

~

REPLA CED SOV . TEST SA T %05281950 *

.* 0G/0%/8% SV VA LVE t-SV-40V-1030 SET TORQUE SVITCR RESET TORQUE SWITCE SETTERC.-- . 60G011G%8 , _ . . . - - . . _ . ~ . . . - . .- ..

0G/0%/8% CR VA LVE t - CR -NO V- 1310 ELECT O!SCONR*RECONW VLV TOR NAINT

  • FRAE CTCLE OF MOV FOR OPER*CLOSE 40%2G08tt
  • POSSIBLE REA T/SNOKE. DAMA GE- ..:.. . _ _

06/13/8% EPL BREAKER t-EPL-1Ji-1%2 . . . . .

I

- }, CRECKED RER TOR SMOKE AND REAT %05012223 Y t 05/13/8% MS VA L VE t-MS-PCV-102A REMOVE *1RSTALL ELECtRECAL SWITCRES ' i

~

A DJUSTED LIMIT SWITCR FOR . ..- n06080101 . . . - . . . , - _ . . .. ._ .- . ..

05/13/8% MS VA L VE 1 -MS -PCV- 10 2R REMOVE *ENSTALL ELECTRICAE, SWITCRES .

L

ADJUSTED LINET SVITCRES FOR 405080103 ,

06/13/8% EPL BREAKER .1-EPL-tit-t%3 INVEATICATE ARD VERETT ECT.DAMAGEO. ._. , . _ . _ , . . . . .

CRECKED BKt TOR SNORE REAT %DG013201 U

~' .L 0G/15/8% CC SRIELO 1 -CC-TCV- 113 A VLV OPER DOES NOT INDECATE

  • e-

%0529181G ADJUSTED LINET SWITCR 06/20/8% TV VALVE t -TV-MO V 1510 VA LVE VOR* T CLOSE OR OPER l^

l.

REPLACED LEMETS O!SCONNECTED %06190%08 l

06/22/8% EPDC BATT .. R/A .. . -- BA TTER1. RAS CROURD . - - . . . . . . - _. ._ .

30 PROBLEN EXISTS 09 DC BUS AT TMIS n0315016% .

06/22/8% TP PUMP t-TP-P-2 LOW VOLTAGE ALARN LOCEED ER *-

CRECKED BATTERE VOLTACE ARD 60G150600 . . . . _ . . . . . - . .

i OG/23/8% SV PUNP t-SV-P-10R ELECTRICALT.P DISCOENECT/RECOENECT I DISCORNECTED A#D RECOSRECTED %OG131130 06/21/8% SV TUMP t*SV-P-1A IRSPECT AED CLEAR BATTERIES - . . . . . . . . . . . . . .

CE. EAR AND IRSPECT DATTERIES %0G201%29 l 4

t

I m

m:

Ott S!

I h:  :.

W

.w.ll; .8Q e

i o i(

' Peg 2 32 t

4 4

MAINTENANCE OF SAFETY RELATED SYSTEMS DURING OUTAGE OR REDUCED POWER PERIODS UNIT NO. 2 .

ELECTRICAL MkINTENANCE em i

i I

-_- - , _ . , s . , . - _ , , . - . . . _ , _ _ _ _ . . - . _ . - _ , _, - .,

P ga 33 ELECTRICAL MAINTLNANCE UNTT NO,2 June,1984 i

None during this reporting period.

9 e

Page 34 e

9 o

MADITENANCE OF SAFM RELATED SYSTEMS DURING OUTAGE OR REDUCED POWER PERIODS 4

UNIT NO.1 INSTRUMENT MAINTENANCE I

l l

3 l

t a

. . . . . . . - . . . - . . .. . . . . . . 'g.

,' . . - . . .- *i e ,

..-. TUESDA1. 3 JUL 8% e 1ts5% PM PAGE 9 lLQ - -

i-

-V mal TERnCE Or SArETr RELATED SrSTEMS DURENC OUTAGE OR REDoCED r0WER rERx0DS .. '

l URETs t

' .hf DEPTs IRST .

.I l

l nA RERO SUMMA RT RErSERVDT Sr3 COMP

  • ' (r G'KPERT MR h 't 06/01/8e RM DETECTOR t - RM-t G 2 REPLA CE DETECTOR

,.f %05211025

,l REPLACED LOV RANCE ANPLiflER METER ENDECA TES ; RICHER.TR AR. DRAWER . . . . . . . . .-. . . . . . , .. ... ,

?l OG/0%/8% Rf METER 1-RI-%2.

CRECKED AR ALLICRED 6060%2005

  • ARAL13 1-CW-R2A-102 CRECK 00 T*CA LEBRA TE

ls f 96/05/8% CV EWR SUBMITTED %02151233

, 0G/05/8% SV PETOT TT-SV-105A*R REMOVE PIT 0T FOR IRSPECTIOR BLKW DOWN SENSERC LINES %01211111 .. -, . . . . . . . . . .

CK SOURCE WOR? T. MOVE. EEEDLE ll r 06/05/8% RM NORI TOR .1 -RM-12 8 P .

MORITOR WORKERC AND PROBLEM W11.E. %03121635 ,

'f 06/05/8% CV ANALTZ 1-CV-02A-102R STSTEM LEAKS *

  • , %03030315 . . . . . . _ - - . . .,.

TRES MR TO BE RANDLED B1 EWS .

l OG/05/8% CW ANALTZER R2A-CV-10% ISTALL ANALTZER MOD EIT ,

TRES MR TO RE WORKED EWR 310191003 l.

TRARSMITTER FLARGE LEAKS . .-... .

. 06/05/8% CS TRANS 1 - CS -L T.- 101.

CLEARED CORROSTOR FOUND %052918%2 ,?

i', 0G/05/8% CV 1R DICA T t - C V- T E -150 INDICATES TLOV WITR PUMPS Off l,

%0523t901 . .......-. - - .- ~ . . . . ,

o. CRECKED ENDECATOR CRECKED SETTERCS
  • OG/05/8% RM HORETOR t-RN-tGO RE AI.A RM COMERC IR KARLT ls

. CA llB RA TED A T.A RM CA RD %0506t430 .T ....'... l'

    • OG/05/8% RC TLOV 1-RC-FE-%35 FLOW INDICATED WITE C. RCP SECURED-._ .. .. . .

~ '

REPLACED TRANSMETTER ARD RESCAE, LED %0%2010%% '

LEVEt, DEVIATES PROM OTRER 3 '

?  ; 06/13/8% CS LEVEt,- 1-CS-T.E-100C - -- . . . .- - - - -

CRECKED OUTPUT CP ISOLA TOR ADJUSTED %060823%0 ,

05/13/8% RM A LA RM 1-RM-CV-102 SETPOTET < 1 PERCERT Of BARD [

g REtDJUSTED SETP0ERTS %0GG90200 l 06/13/8% RH ALARM t-BM-CC-106 SETPOINT > .2 PERCERT. 07.. BA RD.

+ 606080330 IU READJUSTED SET POINTS 06/15/8% NS MORITOR t-NS-RM-126 A LARMS CONTIRUQUSLT ,'

.' %0G100653 . . .

REPLACED BOARD CRECKED SAT l' i

, t 3 f OG/20/8% RM RECORDER t-RM-RR-100 REPLACE EME PADS .. .

, *i REPLACED JRK PADS %0613161%

j' APPARENT VOLTAGE SPEKE i

  • 05/20/8% RM MORITOR 1-RM-CV-130-1 ii RO PROKr.En FOURD %052323%3 06/10/8% RC MORETOR t-RC-1008 UNARLE TO CET READERCS OR DISPLAT 5i %06150903 7011RD DISPLA T OPERATIONAL CRECKED l-06/21/8% CV 1RSTR 1 -C V-101 A 2 0.09 PSI DEVIATIO#mt 01 A *1018 ... _

1, 3

WORK ROT RECESSART AS PER 6061122%3 C j' ;i 06/33/8% SW PUMP t-SV-PS-9=10 1.0V PRESSURE ALARM COMES IR m ,, 3*

CRECKED SEr P0rRTS %05182:58 D *

! 09 Gfl AMP t-PR-Tit-%32H AMPLIFIER FAELED REPE. ACE /CALEPRATE a l}

- OG/1G/8% PR

. f J 6- .

y

- - ~. - - +

, l TUESDAT. 3 JUL 84

  • 12:54 PM PACE 10 .
  • ~

s.

-l4 MAxWTrRANCE or sArfrr RELATED sisTEMS DURERc OUTAGE OR REDUCED POWER PERIODS , .. *

!' FRifs 1 .* .

. DEPTs 195T . >'

' k* RETSERVOT STS *CONF SUMXA RT

  • e MA RERO

' 1 e' - WEPEnf MR i

. . .. , g

  • REFEACED LOF LEVEL ARD 406011158
  • ~

96/26/8% Si RELA 1 t-SE-2A3 RELA T RA D )

REPLACED RELAF . _. . . . . .._ . 406111302 . . . .. .

1 06/26/04 CR IRSTR' 1-CR-L1-161 6 PERCERT DEVIATf0Rw&1-141+L1-106_ . . . _ .

~*A ORSERVED 1RDECA TOR 90VED TREN %061911%8

')-

et/30/8n RC ALARN. 1- RC-rz n s 5 CivEs sroR10us AlannS-._ -. _ _ . . . . . . . _ . . . .. .

l VERTED TRANSMITTER ALA RN DID ROT %06081555 i d- - ,

):

, - - - .- em..g. . w. . ....wm.=. hew. .. .eu o we ee w .e.+e'- . .e. =- *- .. . .m. 9 g

( '; ):

e

),

1' __. . . _ . . - . . - . . _.. _. .__. . . _ . . . -. ._

g .

ge . . . . . . . -. -

i t * ,

, n

- . . . . - . _ _ . . . - . . . .. . - . . - 1. . .- . . . . .- . . . . - . . ,  ;

I i' e f.

e

( l'

.o . -m MW N6N = @M & 6. g e .. ap m. . g., ,

y e . .6 -- i.

h.

4 i s ,

s e . ,

, . ..I, i

. e. l . . _ .._ .

, l!

l'  ! e.

I

) . . . . . . . . . . - .. . . .

1I i- e da 5l Il+ea

' < [

'.?o e

' .i

Ptg2 37 s

4' 9

MAINTENANCE OF SAFETY RELATED SYSTEMS DURING OUTAGE OR REDUCED POWER PERIODS UNIT NO. 2 INSTRUMENN MkINTENANCE 4

.i k

e 1

_ _ - . . . . _ . __ m.. _.- - _ _. _ . _ _ . _ . _ _ _ . - ~ . _. _ . _. __ . -

FFESpdf. 3 JWL 04

  • 12s54 PM PACE 15 . ,
f. l "i' '. 't onCELTERAECK OF GAFETE RELATED BESTEMS DURREC 0ETAGE .0R RED 0CED PoeER PER1006... . . _ . . . . .

j F#1T:-2 ' ,

. PEPT: 183T . _ . . ._. .._._ . . ... ._.

StTSERVDT STS Coert MA RE no SUNNA Rt .

    • GEPE97 . MR l) t

,, 95/t3/0% NS PRESS 2-MS-PE-2%5% CRAEEEL PARLED LOW ,

-s agpgacg8 ANP 30AAP Call ##ATED 405130547 -

4

  • 1

. )

. .'w. .

g w . we e . em.w . ** e. *m.

  • e= *w * -

. , , . ,e> & . . - -.e..m.- e 6 ' S o .o oweee . me h

e

. .. .. . .. ., _. ... 'l' t

+

- . .. f ._ __ . . . . 1, t .' p

- t 7

. . .. . .-- ... - . . . . . . .- . .. . ; . . . . y; a

m -ex . . o. -- .oo .-

p!

_ . . _ ... . - - . . . .. ._ . . I >

t

. y 1

. . . . . . . e

! I e '

.l >

. . ~~

g ,

t -

+ e )

1 _ .. .

!. g.

l 4%) s ..

s

! ! s' avesusars t

HEALTH PHYSICS Paga 39

' June,1964

  • l There was no single release of radioactivity or radiation exposure specifically associated ,

with an outage that accounted for more than ten percent of the allowable annual values in 10CFR20. T O

a

PDOCEDURE DEVIATIONS REVIEWED TIiY STATION NUCLEAR Pcge 40 SAFETY AND OPERATING COMMITTEE AFTER TIME LIMITS s SPECIFIED IN TECHNICAL SPECIFICATIONS l'

Number Unit Title Date Date Rev.

Deviated Bvv SNSOC FW-P-E/R1 '2 Clean, Inspect, Lubricate & Insulation 6-5-84 6-21-8 4 Test on Low Voltage Motors -

OP 1.3 1 Unit Startup Operations 6-4-84 6-21-8 4 6-5-84 OP 2.2 1 Power Operation - Turbine 6-5-84 6-21-8 4 OP 7.7 1 Engineered Safeguard Tanks 6-5-84 6-21-84 OP 16 1 Spent Fuel Pit Makeup Cooling 6-6-84 6-21-84 and Purification System OP 23.2 1 Waste Gas Decay 6-4-84 6-21-84 Tanks Operation 6-4-84 OP 34 1 Secondary Drain System 6-5-84 6-21-84 MOP 26.9 2 Removal of ' Vital Bus Sola 6-6-84 6-21-84 Transformer 2-I MOP 26.10 2 Return to Service of Vital Bus 6-6-84 6-21-8 4 Sola Transformer 2-I PT 2.5A 1 L-1-474 Steam Generator 6-13-84 6-28-84 (L-1-474) Level PT 22.3B 2 Diesel Generator No. 2 6-5-84 6-21-8 4 Monthly Test 6-6-84 6-21-84 PT 25.2 1 Testing of Service Water .

6-6-84 6-21-84 Valves to Recire. Spray Heat Exchangers PT 25.2 2 Testing of Service Water Valves to 6-5-84 6-21-8 4 Recire. Spray Hest Exchangers PT 26.6 1, 2 Radiation Monitoring Equipment 6-5-84 6-21-8 4 Background Check M M P-C- 1, 2 8" and 10" Grinnell 4-2-84 6-7-84 HSS-X3 Hydraulic Suppressors 4-2-84 Dual Bleed Orifice 4-2-84 .

M M P-C- 1, 2 Removal and Installation 3-29-84 6-7-84 HSS-130 of Mechanical (PSA-4 to PSA-35) and Hydraulic (11" to 10") Snubber -

l [Q VIRGINIA ELECTRIC AND PownN COMPANY CC 2C" Ricnwown,Vamorx1A 20261 -

' w.L.srnwaar vic r... ' *""'

Noctuam ormaairnow.

July 12. 1984 Mr. N. M. Haller, Director Serial No. 420 Office of Management and Program Analysis N0/DWL: ace U. S. Nuclear Regulatory Commission Docket Nos. 50-280 Washington, D. C. 20555 50-281 License Nos. DPR-32 DPR-37

Dear Mr. Haller:

Enclosed is the Monthly Operating Report for Surry Power Station Unit Nos. I and 2 for the month of June, 1984.

s Very truly yours,

/

f t/ h, W. L. Stewaft Enclosure (3 copies) cc: Mr. R. C. DeYoung, Director (12 copies)

Office of Inspection and Enforcement Mr. James P. O'Reilly (1 copy)

Regional Administrator Region Il Mr. D. J. Burke NRC Resident inspector Surry Power Station I