ML20090H906

From kanterella
Jump to navigation Jump to search
Forwards Rev 6 to Guard Training & Qualification Plan.Rev Withheld (Ref 10CFR50.54(p)(2))
ML20090H906
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/13/1992
From: Woodard J
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9203160298
Download: ML20090H906 (1)


Text

..

WsJer~~~

Safcguards Infsrmation osm m e, ussemass:o1 Tetec,%ne 205 660 bob 6 When W g gg es Doooneromed.

Southem Nuclear Operating Company

..o,woow a

(('['R7,*]

March 13, 1992

!"e Southem ebd"c tr5 fem 10 CFR 73.55 Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 2055$

Joseph M. Farley Nuclear Plant

, Guard Trainina and Oualification Plan Gentlemen:

Enclosed are four copies of Revision 6 to the Joseph H. farley Nuclear Plant Esard Training and Qualification Plan.

These changes have been made under the aahority of 10 CFR 50.54(p) and do not decrease the safeguards effectiveness of the plan.

This letter and enclosures constitute the report required by 10CFR50.54(p)(2).

If you have any nuestions, please advise.

Respectfully Submitted, hd

. Woodard AEJ/edb5841 Enclosures (4) cc: Mr. S. D. Ebneter w/E (2)

Mr. S. T. Hoffman wo/E n

Mr G. F. Maxwell wo/E

$E a

00 s

!b VJ C gg Safeguards Information 4f3 n u.

When Seperstod From Enclosures. Handle This Document 4 y 8'

M 10 0 ],[,'i

_ _ -,