Forwards Emergency Response Plan Implementation Procedure Revs to Be Incorporated Into Manual.Ltr Canceling Procedures 4.1.1,4.1.11,4.1.13 & 4.1.18 Encl
ML20090H881
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 07/18/1984
From: Usi V
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
NUDOCS 8407270251
Download: ML20090H881 (2)


Text

y

  • * ^

y., -.

I L

TO:

FROM:

Vinnie Usi-Emergency Planning Clerk Office / Training Facility Calvert Cliffs DATE:

' July 18, 1984 Attached you will find Emergency Response Plan Implementation Procedure's Revision (s) to be incorporated into your Emergency Response Plan Implementation Procedures manuals. Please make the necessary corrections to your manuals and' return this form signed and dated.

Revision (s) to be incorporated into manuals:

Attached is letter canceling Procedures 4.1.1, 4.1.11, 4.l'.13 and 4.1.18.

Please remove from your manual and~either return or destroy.

Thank you I have incorporated the above listed Revision (s) into my manuals.

Signed Date AAU: bee

?0$3?7 p

1Q PDR

n

..a;
( 9 '

July 3, 1984 w;

a 10:

ERPIP Holders FROM:

T. E. Forgette g-SUIUECT: !!RPIP Cancellation This letter cancels:

-1.

ERPIP 4.1.1, Plant Superintendent. Plant Superintendent emergency responsibilitics are those of Interim-Site Emergency Coordinator. As suen,~ duties are addressed in ERPIP 4.1.2, Site Emergency Coordinator.

All other Plant Superintendent functions are the same as those per-

~ formed for non-emergency situations; no procedure required.

2.

ERPIP 4.1.11, Emergency Control Center Monitoring Team Leader Checklist.

The Emergency Control Center has been deactivated.

L.' ERPIP 4.1.13, Emergency Re-entry Monitoring Team Leader Checklist.

3 1,

Pbnctions described in this ERPIP are addressed in ERPIP 4.1.7, On-site j

Monitoring Team.

)"

' 4. - ERPIP 4.1.18,' Emergency Re-entry Team imador Checklist.

Infonation in this-ERPIP is a function of:

~E,:

!!RPIP 4.1.4, Operational Support Center Director

!!RPIP 4.1.5, Radiation Protection Director EkPIP 4.1.7, On-site Monitoring Team Imadar

!!RPIP 4.1.12, First Aid Team Leader Checklist ERPIP 4.1.14, Oosimetry Team faadar Checklist ERPIP.4.1.17, Security Team ERPIP 4.6.1, Emergency Personnel Radiation Exposures V

j - M OHjf(/

Supervisor-5fnergency Planning 84 17 WSRC f1 ant. r1nt _ t m