Text
._
Enclosure UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of NORTHERN STATES POWER COMPANY
)
Docket Nos. 50-282 and 50-306
)
(Prairie Island Nuclear Generating
)
Plant Unit Nos. I and 2)
)
)
EXEMPTION I.
The Northern States Power Company (the licensee) is the holder of Facility Operating License Nos. DPR-42 and DPR-60 which authorize operation i
of the Prairie Island Nuclear Generating Plant, Unit Nos. I and 2.
These licenses provide, among other things, that they are sub,iect to all rules, regulations and Orders of the Comission now or hereafter in effect.
The facility comp, rises two pressurized water reactors at the licensee's site located in Goodhue County, Minnesota.
f.
II.
By letter dated January 23, 1984, the licensee requested an exemption from the schedular requirements of 10 CFR 50.48(c), which establishes deadlines for the completion of fire protection modifications required by Appendix R to 10 CFR Part 50 Specifically, the licensee requested that the current deadline of February 4,1984, for the installation of one-hour barriers pursuant to Section III.G.2(c), be extended to December 31, 1984, for both Prairie Island units. The request applies to Fire Areas 31, 32, 58, 59, 73 and 74, in which areas certain shutdown-related cables are being wrapped to provide the req-uisite one-hour barrier.
8405220014 840426 DR ADOCK 05000282 PDR w
. III.
The licensee states that the installation of cable wrapping in these fire areas is the only remaining Appendix R modification for the Prairie Island units.
In the fire areas mentioned, all other Appendix R measures have been taken to the extent required, i.e. suppression and detection capabilities. Moreover, since the installation of cable wrap does not require plant shutdown, ths modifications are proceeding steadily.
The licensee's efforts to complete the one-hour barrier installation have been delayed somewhat by the necessity of conducting cable derating-studies and a review of cable support structures to assure that the existing supports can accommodate the additional weight of the fire wraps. These activities have been completed and steps taken to ensure that the installation of cable wraps will not adversely affect the capacity of the affected cables or the integrity of the modified support structutes.' Thus, the only remaining activity is the installation of the wrap in the affected fire areas.
The staff finds that the licensee has proceeded diligently to implement Appendix R at the Prairie Island units, and that the fire protection measures required by Appendix R have been installed with the sole exception of the cable wrap for which the extension is requested. Under these circumstances, the public health and safety will not be adversely.affected by the extension of the deadline for a period of 11 months, especially considering that the work will be accomplished steadily throughout this period.
IV.
Accordingly, the Commission has determined that, pursuant to-10 CFR 50.12, an exemption is authorized by law and will not endanger life or property or the
, common defense and security and is otherwise in the public interest and hereby grants the following exemption with respect to the requirements of subsection III.G of Appendix R to 10 CFR 50:
Extend the implementation date in paragraph (c)(2) for installation of modification in Fire Areas 31, 32, 58, 59, 73 r.nd 74 required by Appendix R subsection III.G for both units, fron nine months after May 4, 1983 to December 31, 1984.
The NRC staff has determined that the granting of this Exemption will not result in any significant environmental impact and that pursuant to 10 CFR 51.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with this action.
FOR THE NUCLEAR REGULATORY COMMISSION l
Harold R. Denton,. Director Office of Nuclear Reactor Regulation Dated at Bethesda, Maryland this 26th day of April,1984.
4
__J
- ytka "'%g UNITED STATES g e ->
NUCLEAR REGULATORY COMMISSION o
o WASHINGTON, D.C. 20565 DISTRIBUTION:
E Docket File S
ORB #3 Rdg PMKreutzer DOCKET No.
50-282/50-306 MEMORANDUM FOR:
Docketing and Service Branch Office of the Secretary of the Commission FROM:
Office of Nuclear Reactor Regulation
SUBJECT:
NORTHERN STATES POWER COMPANY, Prairie Island. Nuclear Generating Plant Unit Nos. I a.nd. 2 One signed original of the FederalRegister Notice identified below is enclosed for your transmittal to the Offics of the Federal Register for publication. Additional conformed copies ( 6 ) of trie Notide are enclosed for your use, b Notice of Receipt of Application for Con. ruction Permit (s) and Operating License (s).
C Notice of Receipt of Partial Application for Construction Permit (s) and Facility License (s): Time for Submission of Views on Antitrust Matters.
Notice of Considerat%n of issuance of Amendment to Facility Operating License.
C Notice of Receipt of Application for Facility License (s): Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License (s) and Notice of Opportunity for Hearing.
U Notice of Availability of NRC Draft! Final Environmental Statement.
U Notice of Limited Work Authorization.
Notice of Availability of Safety Evaluation Report.
Notice of issuance of Construction Permit (s).
Notice of issuance of racility Operating License (s) or Amendment (s).
Order.
h Exemption.
O Notice of oranting of Reiief.
Other:
f ic u!!ar ea!to ehulation
Enclosure:
As stated
.... ) ORB #3:0L7
=aa*== >k hp n............
4
=a= >... M....../ 8 4
. _.