ML20090H859

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Feb 1992 for Browns Ferry Nuclear Plant Units 1,2 & 3
ML20090H859
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 02/29/1992
From: Baron R, Ratliff S
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9203160281
Download: ML20090H859 (13)


Text

..

c IUA ice.* mey Asmv rw om e anoma om wt,.r.o wa MAR 111992 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.

20555 Gentlement In the Matter of

)

Docket Nos. 50-259 Tennessee Valley Authority

)

50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - MONTHLY OPERATING REPORT FOR Tile MONTH OF FEBRUARY 1992 In accordance with the reqttirements of the BFN Technical Specifications section 6.9.1.3, the Monthly Operating Report for the month of February 1992 is provided in Enclosure 1.

If you have any questions, please telephone me at (205) 729-7566.

Sincer y,

R. R. Baron, Manager of Site Licensing Enclosures cc: See page 2 l-l

~

9203160281 920229 0F I

PDR ADOCK 05000259

)

R PDR v

i o

U.S. Nuclear Regulatory Commission MAR 11 1992 Enclosures cc (Enclosures):

INPO Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, Georgia 30389 Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, IN, Suite 2900 Atlanta, Georgia 30323 Mr. Frederick J. liebdon, Director Project Directorate II-4 Division of keactor Projects I-Il Office of Nuclear Reactor Regulation, Mail 13113 Washington, D.C.

20555 Mr. Ted Martson, Director Electric Power Research Institute P.O. Box 10412 Palo Alto, California 94304 Mr. B. A. Wilson, Project CPicf U.S. Nuclear Regulatory Commission Region II Regulatory Commission 101 Marietta Street, IN, Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35611 Mr. Fred Yost, Director of Research Services, Utility Data Institute, Inc.,

1700 K Street, NW, Suite 400 Washington, D.C.

20006 7

0,' -

~

s-g MONTHLY OPERATING REPORT BROWNS FERRY NUCLEAR PIANT TENNESSEE VALLEY AUTHORITY FEBRUARY 1992 DOCKET NUMBERS 50-259, 50-260, AND 50-296 LICENSE NUMBERS DPR-33, DPR-52, AND DPR-68 hige i pii y

i..

4

.l OPERATIONAL

SUMMARY

FEBRUARY 1992 UNIT 1 Unit remains on administrative hold to resolve various TVA and NRC concerns.

UNIT 2 Unit 2 generated 570,500 MWHs (gross) electrical power and was on line 74 percent of the reporting period.-

UNIT 3 Unit remains on administrative hold to resolve various TVA and NRC concerns.

l

~

1

1 I

I l

AVERAGE DAILY UNIT POWER LEVEL o

DOCKET NO.

50-259 Unit One PREPARED BY S. A. Ratliff TELEPHONE f205) 729-2937 MONTH FEBRUARY 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

17 0

2 0

18 0

3 0

19 0

4 0

20 0

5-0 21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28 0

13' O

29 0

14 0

l 15 0

16 0

l PLLIC207/449/8 l

l l

Ak AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-260 Unit Two PREPARED BY S. A. Ratliff TELEPHONE (205) 729-2937 MONTE ITBRUARY 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 1086 17 1094 1089 18 JO90

.a 1090 19 1095

-4 1096 20 1091 5

1094 21 1093 6

1096 22 288 7

1096 23 0

8 1077 24 0

9 1093 25 0

10 1095 26 0

11 1093 27 0

12 1093 28 0

13 1098 29 0

14 1094 15 1085 16 1088 NOTE: Net generation values are based on manual readings from an integrating vatt hour meter. Small differences in the time of day of manual recording may cause the values to vary slightly.

PLLIC207/449/9

.____________a

of o *

4 AVERAGE DAIL UNIT POWER LEVEL

=

DOCKET NO.

.,,_50-296 UNIT Three PREPARED BY S. A. Ratliff TELEPHONE (205) 729-2937

,e MONTH FEBRUAR1,,,1992 DAY

. AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY YOWER LEVEL (MWe-Net)

(MWe-Ret) 1-0 17 0

2 0

18 0

3 0

19 0

4 0

20 0

5

-0 21 0

6 0-22 0

7 0

23 0

8=

0 24 0

9 0

25 0

10

___Q 26 0

11 0

27 0

,12-0 28 0

13 0

29 0

14

-0 15 0

16 0

.t.

-PLLIC207/449/10

s

g -,

' I?

C g

g

_ W f0PERATING DATA REPORTV -

~

^

-DbCKET NO.. 50-259

~

'~

PREPARED BY-- S. A. Rat 11ff TELEPHONE f205) 729-2937 OPERATING STATUS Notes j

1. '.UnitLName:-

Browns Ferry Unit One 3

2. " Reporting Period: 5'EBRUARY 1992 -

I

~

3.

Licensed Thermal ~ Power (MWt): 3293 il p..

.4.

, Nameplate Rating (Gross MWe): 1152 h

(

{

~5..

Design Electrical Rating-(Net MWe): 1065 I

6.. Maximum Dependable Capacity:(Gross MWe):

1098.4~

7. ' Maximum Dependable Capacityj(Net MWe):

1065 i

i

8. -If Changes Occur,in Capacity' Ratings (Itenis Number 3 Through 7) Since Last Report, Cive Reasons:.

.j g;

N/A l

9.

Power Level To Which Restricted, If Any (Net MWe)t N/A I

10. Reasons For. Restrictions,' If Any:.

N/A i

This Month Yr-to-Date Cumulative

11. Hours in Reporting Period 696 1440 154184

[

.12. Nisaber.of Hours Reactor Was Critical 0

0 59521

.13. Reactor-Reserve Shutdown Ecurs O

0 6997

14. Hours Generator On-Line.

O 0

58267

15. Unit Reserve' Shutdown Hourre-0

'O

.0

16. Gross Thermal Energy Generated (MWH)

'O 0

168066787-

17. Gross Electrical Energy Generated (MWH)-

-0 0

55398130

18. Net Electrical Energy Generated'(hidH).

-2379

-4537 53530953 l

i

19. Unit Service Factor' O

O

-37.8 0

37. lL_

i

20. Unit Availability Factor o

0 32.6 i

21. Unit Capacity Factor (Using MDC Net)

O

22. Unit' Capacity Factor (Using DER Net) 0 0

32.6

23. Unit Fcreed Outage Rate 100 100 57.0-
24.. Shutdowns Scheduled Over. Next 6 Months (Type, Date, and Duration of Each):

N/A

~

i

25. If Shut Down At End Of Report Period, Estimated Date ;f Startup: To be determined i

t s

PLLIC207/449/ll W

b 4

+

5 j

=yq y

4, cwn w.

1.-c--

a x

.,,4,,

y p

OPERATING DATA REPORT DOCKET NO.

50-260 PREPARED BY S.A. Ratliff TELEPHONE (205) 729-2937:

OPERATING STATUS Notes 1.

Unit Name:

Browns Ferry Unit.Two 2.

Reporting Period:

FEBRUARY 1992

- 3.

Licensed Thermal Power (MWt):

3293 4.

Nameplate Rating (Gross MWe):

1152 5.

Design Electrical Rating (Net MWe):

1065 6.

Maximum Dependable Capacity (Gross MWe):. 1098.4 7.

Maximum Dependable Capacity (Net MWe):

1065 12 S.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

=

9.

Power Level To Which Restricted, If Any (Net MWe):

N/A

10. Reasons For Restrictions, If Any:

N/A This Month Yr-to-Date Cumulative

11. Hours in Reporting Period 696.0 1440.0 149071
12. Number of Hours Reactor Was Critical 539.7 1283.7 61790
13. Reactor Reserve Shutdown Hours 0

0 14200

14. Hours Generator On-Line 517.9 1261.9 59729
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 1675002.5 4005766.5 169081622
17. Gross Electrical Energy Generated (MWH) 570500.0 1370370.0 56040178
18. Net Electrical Energy Generated (MWH) 555487.0 1336801.0 54147060
19. Unit Service Factor 74.4 87.6 40.1
20. Unit Availability Factor 74.4 87.6 40.1
21. Unit Capacity Factor (Using MDC Net) 74.9 __

87.2 34.1

22. Unit Capacity Factor (Using DER Net) 74.9 87.2 34.1
23. Unit Forced Outage Rate 0

0 53.0

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A

25. If Shut Down At End Of Report Period, Estimated Date of Startup: ___

3/3/92 PLLIC207/449/12 9

OPERATING DATA REPORT DOCKET NO.

50-296 PREPARED BY

5. A.

Ratliff TELEPHONE (205) 729-2937 OPERATING STATUS Notes 1.

Unit Name:

Browns Ferry Unit Three 2.

Reporting Period: FEBRUARY 1992 3.

Licensed Thermal Power (Wt):

3293 4.

Nameplate Rating (Gross We):

1152 5.

Design Electrical' Rating (Net W e):

1065 6.

Maximum Dependable Capacity (Gross We):

1098.4 7.

Maximum Dependable Capacity (Net We):

1065 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

.N/A 9.

Power Level To Which Restricted, if Any (Net We):

N/A

10. Reasons For Restrictions, If Any:

N/A This Month Yr-to-Date Cumulative

11. Hours in Reporting Period 696.0 1440.0 131496
12. Number of Hours Reactor Was Critical 0

0 45306

13. Reactor Reserve Shutdown Hours 0

0 5150

14. Hours Generator On-Line 0

0 44195

15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (WH) 0 0

131868267

17. Gross Electrical Energy Generated (MWH) 0 0

43473760

18. Ne^ Electrical Energy Generated ( WB)

-1554.0

-3281.0 41949528

19. Unit Service Factor 0

0 33.6

20. Unit Availability Factor 0

0 33.6

21. Unit Capacity Factor (Using MDC Net) 0 0

30.0

22. Unit Capacity Factor (Using DER Net) 0 0

30.0

23. Unit Forced Ontage Rate 100.0 100.0 61L
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A

25. If Shut Down At End Of Report Period, Estimated Date of Startup: To be determined PLLIC207/449/13 F

DOCKET NO:

50-259 UNIT SHUTDOWS AND POWER REDUCTIONS UNIT NAME:

One PREPARED BY:5. A. Ratliff REPORT MONTH: FEBRUARY 1992 TELEPHONE:(205) 729 2937 I"

l-

'j j-l lP.ethodof

-l Licenses l

l l

Cause and Corrective l l

l l

l Duration l-

.lShuttingDown l Event l System l Component l Action to l

l 2

3 5

lNo.

l Date -

l Type l(Hours) l Reason l Reactor lReportNo. l Code #

l Code l

Prevent Recurrence l

l l-1 I

I l-1 I

l 1

l l

1 1

I I

I I

I I

I I

l315 l06/01/85 l F

l 6%

l F

]

4 l

l l

lAdministrativeholdto l l

l l

l l

l l

l l

l resolve various TVA and l 1

1 I

I I

I I

I I

INRCcoacerns.

I I

I I

I I

i

'l I

i l

i m

i I

I I

I I

I I

I I

I y

I I

I I

I I

I i

i I

i-1 I

I i

1 1

I I

I I

I I

I I

i l

1

'I I

i l

i I

I I

I I

I I

I i

l l

I I

I I

I I

I I

I i

1.

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I i

i i

l i

l i

I I

I I

I I

I I

1 1

I I

I I

I I

I 1

l I

I I

I I

I I

l I

I I

I I

i 1

1 I

I I

I I

I I

I I

I i

i i

l 1

1 I

I I

I I

i 1

I I

I i

I I

I I

I I

I I

I I

i I

I i

i i

i I

l l

1 l

l l

l l

1 1

l 2

3 I: Forced Reason:

Method:

Exhibit G-Instructions F

S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation of Existing Outage (NUREG-061)

E-Operator Training and License Examination 5-Redection F-Admini stra tive 9-Otheir S

G-Operational Error (Explain)

Exhibit I-Same Source H-Other (Explain)

PLLIC207/449/14

C-35

-iL DOCKET'NDE

'50-260

' LMIT SHUTDOWNS AMD POWER REDUCTIONS

UNIT 1WIE

Two ~

COMPLErED BY:5. A. Ratliff REPORT MONTH: ' FEBRUARY 1992

' TELEPHONEH2051729-2937 :

. g- -

l

l

-l

-l.

]

lMethodof

'[ Licensee.

l l

l Cause and Corrective l l.

l l~

'l Duration l-lShuttingDown

[. Event,

'lSystem l Component l

- Action to l

l 2

3 d

5 lNo. '. l Date

'l Type' l-(Hours)'.l Reason l Reactor lReportNo. l Code l' Code l. Prevent Recurrence.

l l

1

'l l

I l

'l-1 I

l'

-l l

1

.I 1

1-1 -'

ti-I l-I I'

l3 12/23/92-l S.

l 178.1 l'

B l-M 8

i i

'l Unit shutdown to

[.

I i'

Li I

1 I

lideatify aad repair -

1 I

I i

1 1-I lieakage in the dryw.11,.I l

l' l

l l

l-

.j land to rebalance'the l

1 1

I i

1 i

. f-jde]_',

Iturbineseaerator-I e'

I i

l-1 l

i I

l l

l 1.

I I

I 1

I I

I I

l-I l

  1. dd [o Tcba/apcc.

I I

1.

I l

i I

i

.I l

I i

I i

i l'

r 9

l I

I I

I I

I

-myhiilt hevM M l

.I I

I I

I I

I I

I I

I I

I I

I I

I i

1 I

I I

l-1 I

l l

l

.ll l

l E. fld(/ 5 -

l

-l l-

.l l-l l

l mu c -+ gyk l

l l

l l

l l

1 i

i i

i l

i I

I I

I I

I I

l' I

I l

1 I

I I

I I

l l-1 I

2 3

I: Forced Reason:

Method:

Exhibit G-Instructions F

S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-P.aintenance or Test 2-Manual Scram Entry sheets,for Licensee C-Refueling-3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation of Existing Outage (NUREG-061)-

' E-Operator Training and License Enamination 5-Reduction F-Admini strative 9-Other S

G-Operational Error (Explain) -

Enhibit I-Same Source H-Other (Explain).

PLLIC207/449/15

.4-l.-.

_m.

'r,'..

.v.

,, DOCKET NO:

50-296~

'UNZT SHUTDOWNS AND POWER REDUCTIDNS (MIT NAME:

"Three COMPLETED BY:5. A. Ratliff-REPORT 70 NTH:

FEBRUARY 1092-TELEPHONE:(2051 729-2937 l

l l~

-l.

.l-l, j'

.lMethodof' l Licensee l

l-

.l: Cause and Corrective l

-l l Duration l lShuttingDown'-l Event l Systes :

l' Component l

.. Action to

. l.

I 2

3 d

5 l No.

l.Date l Type l(Hours).l Reason

'l Reactor.

'[ReportNo..l Code l Code

.l-Prevent Recurrence

, )'

l' l

'l

'l-1 I

I I

l-I j.

I

~.l03/03/85-l

.F

.l-6%

l F-l 4

l

~l-l lAdministrativeholdto~

I I

l157 I

l-l

'l l

I I

1-l-

l-

-l l

l' l

j.

l l

1 l resolve various TVA and _ l l

l l

.I I

I I

l

- 1 INRCconcerns.

1

.w I

I I

I I

I I

l-1 I

. l.

I l-1 I

I I

l-I l-I l-1 I

I l-1 l

i I

I I

- l I

I I

I I

I

-l i

1.

I I

I I

I l-l-

1 I

I l-I-

-1 I

I I

I I

I l-l i

I

' I I

I l-1 l

i 1

I I

'l l-1 I

I I

I I

I I

I I

I I

i

.I l'

'l l

I I

I I

I I

I

~l I

i i

i i

I

l
l 1

I i

l l

I I

I I

i 1.

~,

I I

I

'l

~1 1

I I

I I

I I

l-1 I

l-1 I

.I I

I I

I I

I I

I I

.I I

I I

l-1 I

I i

l l

I l

I i

- 1 a

i I

1 1

I I

l-1 I

i 1.

I I

I I

I I

I I

I i

1:

i l

1 l'

I 1

1 1

'l I

l

- }

2,,,,,

3

" Exhibit G-Instructions' I

I: Forced.

g Method:

F S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data

~ B-Maintenance or Test -

2-Manual Scram Entry sheets.for Licensee C-Refueling 3-Automatic Scram

.. Event Report (LER) File

'0-Regulatory Restriction 4-Continuation of Existing Outage (NUREG-061)

E-Operator Training and License Examination 5-Reduction F-Administrative' 9-Other S

G-Operational Error (Explain)

Exhibit I-Same Source

' H-Other (Explain)-

PLLIC207/449/16 i-t v. n,.

w

+ - +

c

.c.

,n,