T E MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi P. O. B OX 164 0. J AC K S O N, MIS SIS SIP PI 3 9 2 0 5 84 JUL IB P l : f,$
Aly 1 MM amursg ucoaucsv. sn.
U.S. Nuclear Regulatory Commission Region 11 101 Marietta St., N.W., Suite 2900 Atlanta, Georgia 30323 Attention:
Mr. J. P. O'Reilly, Regional Administrator
Dear Mr. O'Reilly:
SUBJECT:
Grand Gulf Nuclear Station Units 1 and 2 Docket Nos. 50-416 and 50-417 f
License No. NPF-13 File:
2060/L-660.0/L-401.0 Final Response to IE Bulletin No. 83-08 Ref: AECM-84/0308, June 8, 1984 AECM-84/0351 Mississippi Power & Light Company (MP&L) provided a final response for GGNS Unit 1 to IE Bulletin No. 83-08 and an interim response for GGNS Unit 2 in AECM-84/0308, dated June 8, 1984. This letter provides a final response for GCNS Unit 2 and supplements our previous response (Reference).
Response to Item 1 of IEB 83-08 Eight safety-related breakers with undervoltage trip features are planned for use in the RPS (C71 System) Electrical Protection Assemblics for Unit 2.
These breakers are General Electric type TFJ-175A breakers with type TFKUV7FS trip attachments. These are the same type breakers used in GGNS Unit 1 as described in our previous response (Reference).
Response to Item 2(a)
Since these are the same type breakers used in GGNS Unit 1, the previous response (Reference) provided for Unit I applies for Unit 2.
Response to Item 2(b)
This item is not applicable since Unit 2 is still in the construction phase. Provisions for calibration and testing of these breakers will be equivalent to the provisions provided for Unit I which were described in our previous response (Reference).
Response to item 2(c)
Since GGNS Unit 2 is not an operating plant we hsve no operating experience with these breakers.
8407260338 840713 PDR ADOCK 05000416 G
PDR Member Middle South Utilities System
y.
.i. :.- ~v AECM-84/0351
- E" MISSISSIPPI POWER Q LIEHT COMPANY Response'to Item 2(d)
No preventive or corrective measures are necessary.
To date, our best estimate of staff time used to perform the requested action is 300 man-hours, of which 80 man-hours were used to prepare requested documentation.
This completes our response to IE Bulletin No. 83-08 for GGNS Unit 2.
Should you require any further information regarding these matters, please advise.'
Yours truly,
?
J?M:rg Attachment 7
cc: - Mr. J. B. Richard (w/a)
Mr. R. B. McGeh e (w/o)
Mr. N. S. Reynolds (w/o)
- Mr. G. B. Taylor (w/o)
Mr. Richard C. DeYoung, Director (w/a)
Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555
g-:e n:3 _.
a.
y.
' STATE.0F MISSISSIPPI COUNTY OF HINDS J. P.~McGaughy, being duly sworn, states:that he is Vice President, i Nuclear Support, of Mississippi Power & Light Company; that he is authorized R~
on the part of said Company to s.ign and file with the Nucle.ar Regulatory Ei Commission this response'to IE Bulletin No. 83-08 on behalf of Company, Middle South Energy, Inc. and South Mississippi Electric Power Association; that he signed the foregoing letter as Vice President, Nuclear Support, of Mississippi Power & Light Company; and that the statements made and the matters set forth therein'are true and correct to the best of his knowledge,
- t information and belief.
[
]
\\J/
h J.VP. McGaughy
~ County and. State above' named, this g @, a Notary,Rublic, in and for the
~ SUBSCRIBED AND SWORN TO before me day of ( L. A
, 1984.
(SEAL)
,p.
V h
Ms
+
otary Public tMy commission expires:
65 pf Commhdon Expires Sep. 21.1937 1
e -
1 b
'.JESYdb1 k
4.
O l