Clarifies 840626 Response to IE Bulletin 83-07, Apparently Fraudulent Products Sold by Ray Miller,Inc. Sump Lining Assembly,Containing 1 1/4 Inch Pipe,Scrapped for Failure to Meet Spec Requirements
ML20090H373
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 07/05/1984
From: Foster D
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
GN-383, IEB-83-07, IEB-83-7, NUDOCS 8407260258
Download: ML20090H373 (2)


Text

.

Q .;. -  ! Georgia Power Company .

^

Acute 2. Box 299A D

' Waynesboro. Georgia 30830

- Telephone 404 554 9961. Ems 3360 40.t 724 8114. Ext. 3360

~

Georgia Power o.'o. rosier

]b b .b4 Vice President and Project

' General Manager ~ fte scuhern erectnc system Vogtie Project July 5, 1984 United States Nuclear Regulatory Commission

Reference:

Office of Inspection and Enforcement RII: JP0:

Region.II Suite 3100 50-424, 50-425 101 Marietta Street Atlanta, Georgia 30303 File: X7BC24 Log: GN-383 Attention:. Mr. James P. O'Reilly In our letter of June 26,1984(File: X7BC24, Log: GN-377),in response to I&E Bulletin 83-07, "Apparently Fraudulent Products Sold by Ray Miller,. Inc.". Georgia Power' Company made the statement that "no materials supplied by Ray Miller, Inc. have been used in or provided for safety-related applications at the Vogtle Electric Generating Plant."

-This statement may appear to contradict information supplied in the in-vestigation' summary attached to the' letter; therefore, Georgia Power Company wishes to make a point of clarification on this matter.

A ten foot section of Schedule 40 S/S 304L, 1-1/4 inch pipe from Ray Miller.. Inc. was supplied to the Vogtle Electric Generating Plant by Modern Welding Company, Inc. in an Auxiliary Building sump lining assembly for a safety-related system. The sump lining assembly was scrapped for failure to meet. specification re Ray Miller issue was identified)quirements and was never in May,1979 installed in(long before the the plant.

I hope this: clarification precludes any misunderstanding o' the in-tent of our response to I&E Bulletin 83-07. This letter contains no proprietary information and may be placed in the NRC Public Document Room.

Sincerely, G .

D. O. Foster p REF/D0F/tdm jn?* hay 0 it

.\'f5ll

.g.

y .. .

~

Mr. Jancs P. O'Reilly.

July'3, 1984 Page Two:

D.LO. Foster states that he is the Vice President and Project General s

Manager of'the Vogtle Electric Generating Plant and.is authorized to

~,

execute this oath on behalf of Georgia Power Company and that to the best.of his knowledge and belief the facts set forth in this letter are true.

-GPC:

_f

. , t .

.D. 0. F6 ster Sworn to and subscribed before me this #d4 day of July, 1984.

c.Yecat64._ k&NL I NotiaEy Pitjblic -

State ofl Georgia at Large r+ :i- My Commission Expires: April 11, 1988 a :n j Attachment

>xc: U..S.; Nuclear Regulatory Commission

. Document Control Desk

'4ashington,' D. C. 20555

0. Batum

'J.:A. Bailey.

, E.iD. Groover L. T.-Gucwa

"~. .

M..Malcom G.?Bockhold .Jr.

P. D.' Rice W.:F.-Sanders W.'T. Nickerson-f t b' 4'.

)M .E I't I_ _ D --

. . . _