Clarifies 840626 Response to IE Bulletin 83-07, Apparently Fraudulent Products Sold by Ray Miller,Inc. Sump Lining Assembly,Containing 1 1/4 Inch Pipe,Scrapped for Failure to Meet Spec Requirements
ML20090H373
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 07/05/1984
From: Foster D
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
GN-383, IEB-83-07, IEB-83-7, NUDOCS 8407260258
Download: ML20090H373 (2)


Text

.

Q

! Georgia Power Company.

Acute 2. Box 299A

^

' Waynesboro. Georgia 30830 D

- Telephone 404 554 9961. Ems 3360 40.t 724 8114. Ext. 3360 Vice President and Project

]b b

.b4 Georgia Power

~

o.'o. rosier

' General Manager ~

fte scuhern erectnc system Vogtie Project July 5, 1984 United States Nuclear Regulatory Commission

Reference:

Office of Inspection and Enforcement RII: JP0:

Region.II Suite 3100 50-424, 50-425 101 Marietta Street Atlanta, Georgia 30303 File:

X7BC24 Log:

GN-383 Attention:. Mr. James P. O'Reilly In our letter of June 26,1984(File: X7BC24, Log: GN-377),in response to I&E Bulletin 83-07, "Apparently Fraudulent Products Sold by Ray Miller,. Inc.". Georgia Power' Company made the statement that "no materials supplied by Ray Miller, Inc. have been used in or provided for safety-related applications at the Vogtle Electric Generating Plant."

-This statement may appear to contradict information supplied in the in-vestigation' summary attached to the' letter; therefore, Georgia Power Company wishes to make a point of clarification on this matter.

A ten foot section of Schedule 40 S/S 304L, 1-1/4 inch pipe from Ray Miller.. Inc. was supplied to the Vogtle Electric Generating Plant by Modern Welding Company, Inc. in an Auxiliary Building sump lining assembly for a safety-related system. The sump lining assembly was scrapped for Ray Miller issue was identified)quirements in May,1979 (long before the failure to meet. specification re and was never installed in the plant.

I hope this: clarification precludes any misunderstanding o' the in-tent of our response to I&E Bulletin 83-07. This letter contains no proprietary information and may be placed in the NRC Public Document Room.

Sincerely, G

D. O. Foster REF/D0F/tdm p

jn?* hay 0 it

.\\'f5ll

.g.

y

~

Mr. Jancs P. O'Reilly.

July'3, 1984 Page Two:

D.LO. Foster states that he is the Vice President and Project General Manager of'the Vogtle Electric Generating Plant and.is authorized to s

~,

execute this oath on behalf of Georgia Power Company and that to the best.of his knowledge and belief the facts set forth in this letter are true.

_f

-GPC:

t.

.D. 0. F6 ster Sworn to and subscribed before me this

  1. d4 day of July, 1984.

c.Yecat64._ k&NL I

NotiaEy Pitjblic -

State ofl Georgia at Large r+

i-My Commission Expires: April 11, 1988 a :n Attachment j

>xc:

U..S.; Nuclear Regulatory Commission

. Document Control Desk

'4ashington,' D. C.

20555

0. Batum

'J.:A. Bailey.

E.iD. Groover L. T.-Gucwa

" ~.

M..Malcom G.?Bockhold.Jr.

P. D.' Rice W.:F.-Sanders W.'T. Nickerson-f b'

t 4'.

)M.E I't D --

I_

-