ML20090H286

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Feb 1992 for Davis-Besse Nuclear Power Station,Unit 1
ML20090H286
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/29/1992
From: Sarsour B, Storz L
TOLEDO EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
KB9-0175, KB9-175, NUDOCS 9203160019
Download: ML20090H286 (6)


Text

-

r--

m e'

a

)

TOl EDO EDISDN A CeNever Eneqv Company EDISON PLAZA 370 MAD: SON AVENUE Tot.E DO. 040436524XO'

'.Murch.10, 1992

'KB92-0175 Docket No. 50-346 License No. NPF 3

-U.S. Nuclear Regulatory Commissior-Document Control Desk-Vashington, D.C.

20555

-Gentlemen Honthly-Operating Report, February, 1992 Davis-Besse Nuclear Pover Station Unit 1 Enclosed are ten copies of the Monthly Operating Report for Davis-Besse Nuclear Power Statf or Unit N.1 for the toonth of February,1992.

?

If yoo hava r.ny questions, please contact Bilal Sarsour at (419) 321-7324.

i Very truly yours, f

y R&?

[

~Loula F. Storz

~ Plant: Manager

' Davis-Besse Nuclear-Pover Station

'BhS/ tid

- -- o s

Enclosures cc:

Hr. A..Bert Davis Regional Admin 19trator, Region III Mr.. J. B. - Hopkins NRC Senior Project Manager Mr. Villiam Levis.

c o-NRC Senior Resident Inspector y<

1 i -

.E i.

9203160019 920229

' l. '

FDR ADOCK 03000346 N

0 ;--

a.

PDR.

j, -

. n, AVER AGE DAILY UNIT POWER LEVEL

.50-346 DOCKET NO.

Davis-Besse #1-UNIT DATE March 9, 1992 COkiPLETED BY Bilal Sarsour (419)321-7384 TELEPflONE MONDI February, 1992-

. DAY

' AVERAGE DAll.Y POWER LEVEL DAY AVERAGE DAILY POWER LEVEL

.1M We-Net).

IMWt-Net i 884 887 g.

g

2 888'

- gg 886 887 887 39 4

887 20 888 3

888

'887 yg.

g 6

888 22 890 888 889

.7 23 3

889

-888 3

9' 889 25 689

- 10.

-888 26 887 fg; 888 807' 2'/.

12' 888 '

880 28 g3 :

8S'/

880

9 g

-888 g

3g 15 886 3g

__ 887

'is.

INSTRUCTIONS Or: this format. list the average dady tu.it puwer levd in MWe Net for each de 'in the reperting month. Cmnpvte to the nearest whole mepwyt.

)

19f77 )

.=

. A i

(.'

4 l

s=

OPERATING DATA REPORT DOCKET NO.

50-346.1992 j

j DATE b! arch 9, COMPLETED BY al Sarsour IELEPHONE TfIT-7384 OPERATING STATUS

1. Unit Name:

Davis-Lesse. Unit #3 Notes 2, Reporting Period:

February, 1992 2772

3. Licensed Thermal Power IMWt):

9b 4, Nameplate Rating (Gross MWe):

906

5. Design Electr'eu! Rati6g (Net MWe):

921

6. Maximum Dependable Capacity (Gru MWe):

877

7. Maxinum Dependsble Capacity (Net MWe):

S.L If Changes Occur in Capacity Ratings (Items Number 3 'Ihrough 7) Since Last Report. Give Renwns:

9. Power Level To Which Restricted,If Any INet MWe):

- 10.- Reasons For Restrictions,if Any:-

This Month Yr. to Date Cumulatise 696.0 1440.0 119,089 11, llours in Reporting Period.

12.' Number Of Hours Reactor Was Critical 696.0 1440.0 67,615.8

'3. Reactor Reserve Snutdown llours 0.0 0.0 i,507.2

14. Hours Generator On I.ine -

696.0 1440.0 _

65,473.1 IS Urdt Reserte Shutdown Hours 0.0 0.0 1.732.5 16, Gloss Thermal Energy Generated (MWil) 1.927.316

.3.987.023 160,128,707

17. Gross Electrical Energy Generated (MWH).

648,018,,,

1,341,534

_51234,9.71

18. Et Electrical Energy Generated (MWH) 616=,914 1..?77,058 _

50,069,546 19 Unit Service Factor

_100.0 100.0 55.0

- 2h. Unit Availability Factor 100.0 100,0 56.4

= 21 Unit Capacity Factor (Jsing MDC Net) 101.I

___191.1 47.9

22. Unit Capacity Factor l'Unng DER Net) 97.8 97.9 46.4
23. Unit Forced Outage Rate 0.0 0.0 24.8
24. Shutdowns Scheduled 05er Next 6 Months (Type,Date aitd Duration of Each):

L 23, If Shut Down At End Of Report Period. Estimated Date of Startup:

I

' 26. Units in Test Satus (Prior to Cca.mercial Operationl' Forecast Achiesed INf *lA L CRITICALITY f

p INIT! AL ELECTRICITY l,

COMIERCIA L OPERATION l.

o l

E.

(9/771

n.

.]

. % 2T JPUTffMtG Ato ICWER Hmo.%l-s marr o.

50-346 UttIT finME Davis-Bessa 31 raTc March 9 1992 COMPLETtD BY Eilal Sarsour FCIYAT Mrems February, 1992

- H1st 3n s3n

.n s.*

Li' "**

6; "S.

v,i t.:

j 4 cause a corr.euv.

g n

!.g me.

ceto p

3.g 2ea svarc a v Action to

{v

f. -

jE A'

j {

report

  • reevent Recurrence e

No significant shardowns or power reductions.

I l

A F: Forced' Ressw:

Nthod:

Exhibit G - Instructions for Pteparation of Data 5: Schaduled A-Equipment reilure icuplais) 1-Mandat Entry Sheets for Licsasee svent Report (!ZR)

B-F.aintenece at Tast 2-mnual scram rile (WPEG-01611 C-Ref:wlite9 3-Autom tic Scram D-Requir*ory Restrictica 4-Ccmt *dustion f rom C-operator Trathing s License Eassipatinn Previous Month Es.hibit ? - Same Source T-Administrative 5-Load Redaction

'P.eport chall=nges to Pows Operated Relief valves W rational Error (Explain) 94thec (Emplains (PORVe) and Pressurizer Code Saf ety Valves (PCSVs)

H-other (Explain)

lat -

g-

=

t-

- Operational' Sununary -

l February, 1992 et_

Igl,-

Reactor power was maintained-'at approximately-100 percent full power until 2110 hours0.0244 days <br />0.586 hours <br />0.00349 weeks <br />8.02855e-4 months <br /> on February 29, 1992, when a inanual power reduction to -approxi-mately 93 percent was initiated to perform main turbine valve testing and control' rod drive exercise testing.

i 1

i I

f 4

i I

'l i

l i

9 t

s

}

I i

w a

n..----.---.-.-~....--.

- - - -.... - - -. - -. ~ -.... _,.. - -.. - - - -...... _

.w 4l

' AEFUELING INFORHATION

_Date:

February 1992

!b

1. - Name of facility:

Davis-Besse Unit 1 2.

Scheduled date for next refueling oute.ge? Harch 1993 3.

The number of fuel assemblies (a) in the core and_(b) in the spent fuel storage pool, arid (c) the new fuel storage areas.

(a) 177 (b) 393 (c) 0 s

4.

The present licensed spent fuel pool storage.cepaelty and the size of any increase'in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.

Present: 735 5.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.

h Date:

1996 - assuming ability to unload the entire core into the spent liiR poel_is maintained o -,

1:

L I

l; t

p l-!l u

1

.