ML20090G764
| ML20090G764 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 07/11/1984 |
| From: | NRC |
| To: | |
| Shared Package | |
| ML20090G770 | List: |
| References | |
| NUDOCS 8407250313 | |
| Download: ML20090G764 (4) | |
Text
.
Qt'AD-C1 TIES DPP.-29 11BLE 4.21 l
I WlulMM TIII AND CAL!!R Aft:N TTC1'!k:T FCR C:EE AND CCMTA:hMENT CCO l
ROD BLOOKS AND!!OLAT10NS78 s
t krtneer.t hmrest Fecsioul en====r hmr"*rt Test
- Carwitsam the-43 g::s lam:neratai
~
1.
Rea:ter b= t w mater hvel
. Q)
.On:r/3 rn.v.ths On:e/ day 2.
byaell teg*. pressee Q)
On:e/3 mr.:ts None 3.
K n :ter ba ;'essee u)
On=r/,3 mer::ns None 4.
Centan et s;.sy r.terb:1
- s. 2/3 ::re her:
0)
Orge/3 months None
- b. Conta.w. n: gressee Q)
On=e/3 m:n:hs None tea pressee c:ve coci:g pu.;
(1)
On:e/3 montr:s Manc is:narge 6.
thierve.". age 4-W essental Rebeleg wtage Ret.eing wtage None 7
Degraded voltage 4-kv essential buses Refueling (8)
Refueling outage., Once/ month tse thcu outage 1.
A?RM dow.s:aie u) 0)
Once/3 mv.:r.s None 2.
APRM tbn va ate 01 G)
Refalog og: age None 3.
RM cs:ae
- 5) Q)
- 5) G)
None 4.
RM c:wns:aie 51 0)
- 5) 0) hone RSM escat Q) 0) 6.
REM c:w s: e Refw!cg egiage None (11 G)
Once/3 montr.s None 7.
SEM es:st
- 5) Q) 51 G)
None 3.
SRM getector ne: c starte
- 5) G)
(6)
Nore pest:ca S.
RM gete::ct ret a static pose,en 5)
(6)
None
- 10. SRM dor.s:ak 51 01
- 5) Q)
None
- 11. No wate' irve! ei seam Chee/3 renths Not a;;!ca:le None
. da:rygt veume 15W)
- 12. SW high level trip Refueling Not applicable None bypessed outage It'se staamiine heteten 1.
$!eam tunnet he tempera!we Refuelot outage Refuetrig ogiate None 2.
Steam!re he hw U)
Once/3 monins On:e/ cay 3.
3:camitt ba pessee U)
Once/3 mon:as None 4
$!aamire he raga:en Q) (4) 3.
Rea: tor bw bw water level Ref.elet wtage On:e/dar Q)
On:r/3 men:ts Once/ car tt1C tunatus 1.
Sitamire he flow once/3 months (9), once/3 months ces 2.
Irtre s'ea he temorature g
Refueleg cutage Refer wtage g
3.
lc. rea::er pressee Mong Once/3 mt.:ns On e/3 m:n:ns 8407250313 840711 PDR ADOCK 05000254 p
PDR Amendment No. M [. 88 3.2 / C-16
~
l l
Qt'AD-CITIES I
DPR-29 i
l l
i TABLE 4.21 (Cont'd) instnament lustumefit Fusetenal instnamovit o_Y Cassel Test
- Catitraten'D Check 0
.NPCI lim 6etan 1.
Steamine hth flow (1) (9)
Once/3 months (9)
None l
2.
Steamloe area he tecerature' Refueleg outage Refueleg catage None 3.
Low lea: tor pressure (1)
On r/3 mer.ths None teacty $v%ling VeniMaten $ptem Isdati3A AAC $tandky IttatmeR1 $plam laitiatl0A 1.
Veitriaton erha st da:t radation (1)
Once!3 months Once/ cay rnonitors 2.
Refueleg !Loor fadster mon:to's (1)
On:e/,3 months On:e/ day
, !!aem Jet Air gp;ta Of.&as isolaten 1.
Oil. gas radiaton monnors (1) (4)
Refuelr.g outage Oue/ cay Cartni tamm Vestilsten Syrtam isolaten 1.
Rea: tor bw water level (1)
Once/3 months
,0nce..y 2.
Drywerr he pressee
(!)
On:e/3 months N ne 3.
Mar steamine he flow
- (1)
Once/3 months On:e/ cay 4
Ven daten erhaest du:t radaten (1)
Once/3 mor.ths Once/ car monnors NUtes 1.
mitait, one De Perte vatif einesere nov's (W as ee8med on Isme a lit sie 2 0 a 10, toeria' er acttag to fitwe A 11 -:ts an ete'<a 5
not neu trJn 1 merth ner sene thas } ret?.s he c.y;3 ee of mstimment takte rate eatt mag actode data atta*ef fr0n othet DC'Wg stief teetters ter when tM same gesp estrumefit eM'ates e an enewonment ser.sas te that of Quad Cites Units ! and 2.
2.
foneten4 tes!1 Celstratens 3*f est'ument gnacts are Ref recured when these estrume9ts are net reeuwed 13 De eDef a94 Of are t'40e(
8
) thrs estrvmeatater a eage; tog from the funciona: test f einsten the functional test shau consist of m,ecteg a sen uted eg:trut segsa' att v
the meawement channel Tha rstrume*t chanael a ence;tet hem the Ivacional test eefinitens and shafi be catiaratet vset swnslated electical svals once eve's 3 a
surtths b fencional tests sha# be pedermet btf0'e each sta'tg6 e'th a reevred ttsquenct net te esteed once pe* Dett Calibratens shall be pedermet fv'et each startup er dereg certfeltPf bhutdow9s sitt. A feegref treevency net to etcee( ence pe' weet s
TN pesa ramt mec 4ana sr.in te uisenstee ew, refueims estare a
2.
Laet system hectamal testa are pedermed as saeclist a fM appicatie secten les these systems.
8.
Functional test shall include verification of operation of the degraded voltage 5-minute timer and 7-second inherent timer.
9.
Verification of the time delay setting of 3 1 T 1 10 seconds shall be performed during each refueling outage.
l 3.2/4.2-17 l
Amendment No, d 88
1 QUAD-CITIES DPR-30 TABLE 4.21 If!N!WI,M TIST AND CIU!RATICM FRCINCT FCR CO2[ AND CONTAINMINT COOLIXi $137IM3 fx5TX"Y.!XTAfl0M.
800 BLOCK 3. AMC,13 LAI;;NIh inrtnpent hrtrwert Factaonal hstrument M
last*
Ch' 3 CaecaU
. [C: hstumeetatsas 1.
Rea: tar bm.bw wrter Irvel U)
.0n: /3 months Once/ dry 2.
trywen he ressee 01 Once/3 me.ths hone 3.
Raa: tor bw pressen (1)
Once/3 montu hone 4.
Cxtan ret s: ray etertc1
- a. 2/3 core hept u)
On:ed tnantas None
- n. Cxtan..ent pressee 0)
. Onu/3 mentts
~None 5.
L:w.pesser core cocing pens 0)
Onu/3 ns.9ths fene dse.a:ge 6.
tWerr..* ge 4-W essetal Refw!ng Mage Rafalog w' tatt hone 7
Degraded voltage 4-tv essenttal tiur.es Refueling 18),
Reeutling outage Once/ month
,and tiacas outage,
1.
AN coe.suk 01 C)
On:e/3 m:stu Hone 2.
APRM f.: varck 01 0)
Refaleg cutage hcne 3.'
RM esuie G) 0)
G) 01 None 4.
RM d:wnsuk G) 0)
G) 0) hcne 5.
EM csus
- 0) 0)
Refwieg Magt hone 6.
RSM C:w : sue U101 Once/3 rnantns None 7.
EM rsue G) 0)
B) 0) hone 3.
Smit dete: tor net n start::
E) 0)
(6) hcne Postten RM detetter ret n sta:7.::
positen 51 (6)
None
- 10. SF.M de e.su t
- 5) 01 G) 0) hone
- 11. He water Irvel e s.n onee/3 genths Not anic:t hone
... is?stit voF.#t l M )
- 12. S::V high level trip Refuelin?
Not applicable None
- b passed outage f
E'se staamfbe hatries 1.
Sta fumel he temperatwe Refwirg Magt Refdfrg M agt hane 2.
Dem!ne he hw n)
Once/3 montu Once/ cay 3.
Stenloe kw ressee (1)
Once/3 mcntu l
4
!!te'ne he rigaton g)(4) g, fag,g g,t, gnC,jcip Rea.t:r bw he = ster knl Q)
Once/3 montu Once/ day 1
to: Immatma 1.
- leamite he f.ow onee/s enam m one,f 3,onen, n g
g 2.
Iwtre Fes 80 te-Defatwe Ref.elrg Mage peta rg gage g
3.
lbw reacts.Pessure On:/3r.vt'.s Ones/3 mentas
- hon, AmendmentNo.7;',//,83 12/41.14
v.
b QUAD-CITIES DPR-30 TABLE 4.21 (Cont'd) hemsment h8museet factunal hemsnest sammmel fest*
Cenerstse'D ChecfD IIPCIimmeuse
- l.
Steamlae he new (1) (9)
Once/3 months (9)
None l
2.
Steamime area he temperature Refueleg outage Refueleg outage hone 3.
Low teactor pressure (1)
Once/3 months hone Beester beindeng Yerr'Jiation System lasisten And Stapah Treatment System lemstes 1.
Ventilaten exhaust duct radeten (1)
Once/3 months once/dsy mondors 2.
Refueleg floor radaten montors (1)
Once/3 months Once/ day temen let Aar sectar Of4sa lushrtsee 1.
00 gas radater. monaers (1) (4)
Refueleg outage Once/ day
' ' 'c*artrw asse vestnenen system hetetion 1.
Reactor bw water level (1)
Once/3 months Once/ day 2.
Drymen he pressure (1)
Once/3 months hone (1)
Once/3 months
- Once/ day 3.
Man steamine he now 4,
Ventilsten exhaust duct redaten (1)
Once/3 months Once/ day inentors spies 3
1.
Deteth enee co' ments ente esoseere haves W as sebed on Fiewe d 11) are ! O e 10, twees'ter assedag ts F we d 11 no en eterval 1
est tes than I ments ner more tua 3 mentns N esmestaten of mitruneat is4re rate data mer atwe data setsaw trem other es.img ester peertes ter essa the name sessen estrument toerates a sa on,renment sendar to that of Dead (dos unns I and 2.
2.
Isactual toets. meerstens and metroment shorts are not reessed whe9 these estemments are not recesse la be eseratie e are tropee 3.
The estrementate e eisetted kwa the tenstenal test eednden. The hsnetenal test shalsenset of pjectee a lonelated eettraalsqnat sta se r--
-M thennet a The attntmoet (Mnnel e asetted tem the fonctanal test gebetans and shal to salessted not tonelated eactisellgaals once every )
month &
4
$ funitehal tMil nAss be podeMned belete eeth liertoo eith 8 feceeed boevesti not te esteet ente per ovet Celstritent shall be podermed 6erme teen startop er derog contreated shoteewel ed a reevoed treteent; not te sessed snee per seet 4.
The gettseg meshesen ohes be seiereted every re8 voice estees 7.
Laes eyeses hertmallege are podermed M npassted a the apposatas teste ter leses eyWent 8.
Functional test s' hall ine'lude verification of operation of the degraded voltage 5-minute timer and 7-second inherent timer.
9.
Verification of the time delay setting of 3 1 t 1 10 seconds shall be performed during each refueling outage.
Amendment No. 83 3.2/42 17